Download as pdf or txt
Download as pdf or txt
You are on page 1of 7

PROPOSED SOIL INVESTIGATION

FOR EARTHWORK AT SECTION 11, KOTA PUTERI, MUKIM RAWANG, DAERAH


GOMBAK, SELANGOR.

BILL OF QUANTITIES
BILL NO. 1 - GENERAL CONDITIONS & PRELIMINARIES

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Note: The quantities in this BQ are provisional only.


The basis for payment will be on actual quantities of
works ordered and carried out as measured by the
Engineer.

Contractual Requirements

1.0 Allow for compliance with the terms of each of


Conditions of Contract and Preliminaries of the
Specification including the following:

1.0.1 Worksmen's Compensation Insurance and SOCSO.

1.0.2 Insurance against damage to, destruction or loss of Lump


property owned by Third Parties. Sum

1.0.3 Contractor's All Risks insurance for the Works.


1.1 Allow for compliance with the terms in the Lump
Condition of Contract and Preliminaries of the Sum
specifications not covered in the above.

1.2 Survey and setting out the locations and reduced Lump
level of all Site Investigation Works Sum
1.3 Safety Environmental Requirement with regard to
compliance with government SOP on COVID19 and Lump
comply with Authority Safety Requirements, Sum
DOSH/DOE, etc.

1.4 Preparation and submission of seven (7) sets of


Factual Reports which duly endorsed by Prefessional
Engineer with Practising Certificate including results
of all laboratory tests, layout showing as built SI Lump
Location, monitoring data, etc. One (1) softcopy of the Sum
same in DVD-ROM shall be submitted.

TOTAL FOR BILL NO. 1 CARRIED TO GENERAL SUMMARY ON PAGE BQ-7

BQ - 1
BILL OF QUANTITIES
BILL NO. 2 - DEEP BORING WITH BORING PLANT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

2.0 Boring Plant - Mobilisation & Demobilisation

2.0.1 Mobilise two (2) numbers of deep boring plant to Site Lump
including erecting the plant. Maintain the plant in good Sum
working conditions and remove the same upon
completion of Works.

2.0.2 Movement of boring plant from one borehole position Nos 12


to the next, including dismantling it at the old position
and erecting it at the new position which is on land.

Rotary Drilling

2.1 Carry out rotary drilling, whether cased or uncased:

2.1.1 From existing ground level or mudline to a depth not Metre 120
exceeding 10 metres.

2.1.2 From a depth exceeding 10 metres to a depth not Metre 120


exceeding 20 metres.

2.1.3 From a depth exceeding 20 metres to a depth not Metre 60


exceeding 30 metres.

2.1.4 From a depth exceeding 30 metres to a depth not Metre 60


exceeding 40 metres.

2.1.5 From a depth exceeding 40 metres to a depth not Metre R.O


exceeding 50 metres.

2.1.6 From a depth exceeding 50 metres to a depth not Metre R.O


exceeding 60 metres.

Drilling in Rock

2.2 Carry out diamond core drilling of 54mm minimum


diameter in all kinds of rocks including delivery of
rock cores in standard boxes to Engineer's Office:

2.2.1 From existing ground level or mudline to a depth not Metre R.O
exceeding 10 metres.

2.2.2 From a depth exceeding 10 metres to a depth not Metre R.O


exceeding 20 metres.

2.2.3 From a depth exceeding 20 metres to a depth not Metre 18


exceeding 30 metres.

2.2.4 From a depth exceeding 30 metres to a depth not Metre 18


exceeding 40 metres.

2.2.5 From a depth exceeding 40 metres to a depth not Metre R.O


exceeding 50 metres.

2.2.6 From a depth exceeding 50 metres to a depth not Metre R.O


exceeding 60 metres.

C/F

BQ - 2
BILL OF QUANTITIES
BILL NO. 2 - DEEP BORING WITH BORING PLANT

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

B/F
Field Test
2.3 Carry out Standard Penetration Test and collect
disturbed samples:

2.3.1 At a depth from existing ground level or mudline to a No. 72


depth not exceeding 10 metres.

2.3.2 From a depth exceeding 10 metres to a depth not No. 84


exceeding 20 metres.

2.3.3 From a depth exceeding 20 metres to a depth not No. 84


exceeding 30 metres.

2.3.4 From a depth exceeding 30 metres to a depth not No. 60


exceeding 40 metres.

2.3.5 From a depth exceeding 40 metres to a depth not No. R.O


exceeding 50 metres.

2.3.6 From a depth exceeding 50 metres to a depth not No. R.O


exceeding 60 metres.

Sampling
2.5 Obtained Undisturbed Samples with thin walled tube
sampler:

2.5.1 At a depth from existing ground level or mudline to a No. 24


depth not exceeding 10 metres.

2.5.2 From a depth exceeding 10 metres to a depth not No. 24


exceeding 20 metres.

2.5.3 From a depth exceeding 20 metres to a depth not No. 12


exceeding 30 metres.

2.5.4 From a depth exceeding 30 metres. No. R.O

2.6 Extra over Item 2.5 if approved piston sampler is used, No. R.O
as directed by the Engineer.

2.7 Obtain 75mm minimum diameter of Undisturbed


Samples by using triple tube core barrel with
retracable shoe (Mazier) with an approved drilling
mud :

2.7.1 At a depth between existing ground level to a depth not No. 6


exceeding 10 metres.

2.7.2 From a depth exceeding 10 metres to a depth not No. 24


exceeding 20 metres.

2.7.3 From a depth exceeding 20 metres to a depth not No. 12


exceeding 30 metres.

2.7.4 From a depth exceeding 30 metres. No. R.O

Photographs
2.11 Take and supply mounted 4R size digital photographs Set 7
for all extracted rock cores, soil samples or such
portion of the Works in progress as directed by the
Engineer. The rate shall be for one set consisting of
seven (7) prints and supply of digital JPEG file

TOTAL FOR BILL NO. 2 CARRIED TO GENERAL SUMMARY ON PAGE BQ-7

BQ - 3
BILL OF QUANTITIES
BILL NO. 3- MACKINTOSH PROBES & OTHER TESTS

UNIT QTY
ITEM DESCRIPTION RATE (RM) AMOUNT (RM)

Standpipe Piezometer
3.1 Supply and install open standpipe piezometer in pre- No. 6
drilled borehole, inclusive of uPVC tubing upto a
maximum depth of twenty (20) metres with filter
fabric wrapped around at perforated end, sand filter,
protective cover, concrete, grouting, etc as specified.
Rate to include monitoring of piezometer at regular
time intervals during currency of Contract.

3.1.1 Extra over item 2.8 if uPVC tubing depth exceeds 20 Metre 60
metres but not exceeding 30m.

Collecting Water Samples


3.2 Collect one (1) litre of representative ground water No. 12
sample in a water tight, clean container from a deep
borehole and pond water as instructed by S.O at site.

3.3 Mackintosh Probes


3.3.1 Carry out Mackintosh or JKR Probes to a maximum No. 17
depth not exceeding 10m on the original ground.

TOTAL FOR BILL NO. 3 CARRIED TO GENERAL SUMMARY ON PAGE BQ-7

BQ - 4
BILL OF QUANTITIES
BILL NO. 4 - LABORATORY TESTS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

Classification Tests
(As per BS 1377 :1990)
4.0 Carry out classification tests:

4.0.1 Moisture Content No. 150

4.0.2 Liquid Limit No. 150

4.0.3 Plastic Limit No. 150

4.0.4 Linear Shrinkage No. 12

4.0.5 Bulk / Dry Density No. 12

4.0.6 Specific Gravity No. 12

4.0.7 Particle size distribution for coarse-grained soils. No. 300

Particle size distribution for fine-grained soils


4.0.8 including sieve analysis. No. 300

Soil Strength Tests

4.1 Carry out soil strength tests on Undisturbed Samples:

4.1.1 Unconfined Compression Strength Test


- 50 mm dia. Specimen No. 12
- 75 mm dia. Specimen No. -

4.1.2 Unconsolidated Undrained Triaxial Compression Test


without pore water measurement for one specimen
only.
- 50 mm dia. Specimen No. -
- 75 mm dia. Specimen No. -

4.1.3 - ditto - but invloving at least three (3) specimens to


-obtain
50 mm thedia.
cohesion value and friction angle.
Specimen Series -
- 75 mm dia. Specimen Series -

4.1.4 Consolidated Undrained Triaxial Compression Test


with pore water pressure measurement in accordance
with the method recommended by Bishop and Hankel.
At least three (3) specimen are required to obtain the
cohesion value and friction angle.

- 50 mm dia. Specimen Series 12


- 75 mm dia. Specimen Series -

4.1.5 - ditto - but without pore water pressure measurement. Series -

- 50 mm dia. Specimen Series -


- 75 mm dia. Specimen Series -

C/F

BQ - 5
BILL OF QUANTITIES
BILL NO. 4 - LABORATORY TESTS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

B/F 0.00
4.1.6 Consolidated Drained Triaxial Compression Test in
accordance with the method recommended by Bishop
and Hankel. At least three (3) specimens are required
to obtain the cohesion value and friction angle.
- 50 mm dia. Specimen Series -
- 75 mm dia. Specimen Series -

4.1.7 One-dimensional Consolidation Test No. 6

Chemical Tests
4.2 Carry out chemical test on soil or water samples
according to BS 1377:1990: Part 3:

4.2.1 Organic matter content No. 12

4.2.2 Total Sulphate content No. 12

4.2.3 Sulphate content of ground water No. 12

4.2.4 Chloride content of ground water No. 12

4.2.5 pH value No. 12

Rock Tests and Other Tests

4.3 Rock and other laboratory testing in accordance to


relevant ASTM procedures or British Standards. Rates
to include preparation of samples for testing:

4.3.1 Unconfined Compression Test on rock cores No. 12

4.3.2 Point Load strength index No. 12

TOTAL FOR BILL NO. 4 CARRIED TO GENERAL SUMMARY ON PAGE BQ-7

BQ - 6
GENERAL SUMMARY

PROPOSED SOIL INVESTIGATION


FOR SECTION 11, KOTA PUTERI, MUKIM RAWANG, DAERAH GOMBAK, SELANGOR.

PROPOSED SITE INVESTIGATION WORKS

Bill No. Description From Page No. Amount

1 General Conditions and Preliminaries BQ - 1

2 Deep Boring with Boring Plants BQ - 4

3 Mackintosh Probes & Other Tests BQ - 5

4 Laboratory Tests BQ - 6

TOTAL CARRIED TO FORM OF TENDER

Total Sum Quoted ………………………………………………………………………...…………

…………………………………………………………………….......................................................................................…

............................................................................................ ($ )

for a Contract Period of Five (5) Weeks.

Signature of Tenderer : ............................................................ Signature of Witness : ................................................................

Name : .................................................................................. Name : .............................................................................................

I/C No. : .............................................................................. I/C No. : ..............................................................................

Designation : ............................................................................. Designation : ...................................................................................

Name & Address of


Tendering Firm : ...................................................................... Address : ..........................................................................................
................................................................................................... ...................................................................................................

................................................................................................... .........................................................................................................

Telephone No. : ........................................................................... Telephone No. : .................................................................................