This document is an abstract of cost for the construction of Dakan wala nallah Anicut Kataro ka Khera. It contains 12 line items with quantities, rates, units, and amounts for work like excavation, concrete work, stone masonry, plastering, and more. The total project cost is estimated to be Rs. 200.73 lacs (Rs. 201 lacs) including contingencies, with additional costs for price escalation and prorata charges bringing the final estimated cost to Rs. 227.13 lacs.
This document is an abstract of cost for the construction of Dakan wala nallah Anicut Kataro ka Khera. It contains 12 line items with quantities, rates, units, and amounts for work like excavation, concrete work, stone masonry, plastering, and more. The total project cost is estimated to be Rs. 200.73 lacs (Rs. 201 lacs) including contingencies, with additional costs for price escalation and prorata charges bringing the final estimated cost to Rs. 227.13 lacs.
This document is an abstract of cost for the construction of Dakan wala nallah Anicut Kataro ka Khera. It contains 12 line items with quantities, rates, units, and amounts for work like excavation, concrete work, stone masonry, plastering, and more. The total project cost is estimated to be Rs. 200.73 lacs (Rs. 201 lacs) including contingencies, with additional costs for price escalation and prorata charges bringing the final estimated cost to Rs. 227.13 lacs.
This document is an abstract of cost for the construction of Dakan wala nallah Anicut Kataro ka Khera. It contains 12 line items with quantities, rates, units, and amounts for work like excavation, concrete work, stone masonry, plastering, and more. The total project cost is estimated to be Rs. 200.73 lacs (Rs. 201 lacs) including contingencies, with additional costs for price escalation and prorata charges bringing the final estimated cost to Rs. 227.13 lacs.
Page 28 Chapter no - IX Item no. 7 d 0.00 6 Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. (d)In cement sand mortar 1:5 1837.00 4077.00 Cum 7489449.00 Foundation Page 21 Chapter no - VII tem no. 1 (c) 7 Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. (d)In cement sand mortar 1:5 (Add extra(a) Masonry work in superstructure) 628.00 4267.00 Cum 2679676.00 Page 21&22 Chapter no - VII tem no. 1 (c) & 8(a) 8 Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20mm 331.00 289.00 sqm 95659.00 Page 24 Chapter no - VIII Item no. 2 (a)
C:\Users\91916\Desktop\radiya Abstract Waste
S.No. Particular Quantity Rate Unit Amount 9 Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75mm 120.00 480.00 Sqm 57600.00 Page 92 Chapter no - XVIII Item no. 17(a) 10 Drilling holes of 35 mm diameter for anchor rods.
i Upto 1.50 m. depth 90.00 130.00 Meter 11700.00
Page 37 Chapter no - XI Item no. 1(a)(i) 11 Labour charges for Fixing of anchor bars in neat cement grout including cost of cement and curing etc. complete 90.00 219.00 Each 19710.00 Page 37 Chapter no - XI Item no. 1(b) 12 Supply of Tor steel anchor bars of required diameter, length and shape at site of work complete. 20 mm Dia Bars 160.00 78.00 Kg 12480.00 Page 37 Chapter no - XI Item no. 1(c) Total : 19679654.00 Add 2.0% Contingency Charges : 393593.08 Total Amount : 20073247.08 Rs. In lacs : 200.73 Say Rs. In lacs : 201.00 Price Escalation@ 0% 0.00 Prorata Charges @ 13% 26.13 Say Rs. In lacs : 227.13