Download as pdf
Download as pdf
You are on page 1of 50
ike LULU HYPERMARKET GENERAL. STANDARDS AND REQUIREMENTS 1 July 2021 Lulu Group International Tel: + 971 24140900 P. O. Box: 4048 ‘Abu Dhabi UAE ska PROJECT DEVELOPMENT DEPARTHENT FULL FINISH ike PROJECT DEVELOPMENT DEPARTHENT iva LULU HYPERMARKETS ‘TYPICAL TECHNICAL REQUIREMENTS-FULL FINISH General Standards Civil) Architectural ‘Site Preparation and Sub Structures General site clearance, cuting/iling to the quired levels, necessary compaction ee "Excavation for foundation and structures spe design frm consultant Pits for conveying systems (Elevators, Travelstors, ee) a8 quired frm the special ‘Super Structure Frame and Roof Lula Hypermarket have diferent constriction concepts 1. Ground Noor tand or First floor) 2. Basement (parking) * Ground floor 3. Malt floors Preferable column grid to be with Sm width nd any length in ep approximately height been lors abe 5.70 my inside telling 3.80 m rom FFL. Basement flor to be 3.60 m root ‘covering to be precast roof panels waterproof with insulation ‘5 recommendation and section bythe constant or ‘Swi panel double skin, with PU insulate, 75-100 mm ‘hick The panels to suite HVAC design requirement Necessary are o be provided at roof to accommedst water tanks fier plans, condenser fr refieration plans, support Tr siguboards ad oer MEP installations, Sel srustre ‘when provided tobe with necessary fie ated coating o quired by Civil Defense. All exposed root be tested for waterproofing. Public Tottets Complete equipped tits for public that shal. include oil for special needs seesible fom common coir. Prayer Rooms and Ablation Spacious prayer rooms for bo men and women with sblons ‘Stuff Toilets, Pantry and Restroom Staff tiles formen and women, panty, and wstooms Ta Pel %) a PROJECT DEVELOPMENT DEPARTMENT. Loading Bay Loading bay a the ea wth sufficient space for 57 tracks of-loaing- The lve shoul be proximate, 0.9 ~ ‘LO meter telow FFL level and provide individual electric operated shutters and dck sete foreach adn bay. The Toad are once driver” elt with xranee fom outside "Tetnical rooms and installation as per goverment’ requirements, and Hypemarkes equireeas suchas ‘compressor rom for rigeration plant, external space fo aie cooled condensers, let rooms, pump roams, generator oom, Dedesed room for cleaners wth sal or, Insulated waste room with aes hrovgh esse operated Garbage Room shuts in float of compactor (compactor size: 2,516.3 x23, ‘mtr, and double dor for Euro bias. Water and drainage provisions. Power provision (2A TPN Isola) fo compactor, eooled oP by retigration plant (by Lalu). The oor level should be the sme as external level (ter Walls and Finishing ‘Our wals spor agroed wall layout madoby concrete hollow blocks with insulation plastered bth sides. The external fag to have proper eldingpat Finish as per the sechiteewral requirement BxternavEntrances 1. Proper entryfext to have atleast hee ain entry exit the parking area fr public, provide wih pressurized tio 2. ‘Separate etry lexi for sevice vehicles 3. asking area to have pavinglaphat with ainwater runofstonm water drainage and poperroad marking & tri signage with curtstone partons wherever require 3. Loading area to have dain chanel coved with see! Gating: Heavy-duty high-performance pony 5-10 ml. screed shal be provides forthe unload plafon, Rubber bumpers and edge protection ob provided forthe platens 4 Landing to all min pbc entrances tobe granite (ix of plished) preferably 0mm x mm x 0mm thickness floor ish, 5. Provision for soft landscaping in speed lesion inthe parking area with watering fli for iigation. Qo PROJECT DEVELOPMENT DEPARTHENT (Offices and staff rooms partitions Gypsum boari/lezed partion fr offices (und 600- ‘O0m floor area) with doors and windows. Al gypsun walls tobe paint ised to receive wallpapers lobe fixed by Lalu) ‘spr drawings provided by LPM. Insulation of parton of GM, conference room, ete. (Other Partitions and Protections 1. $8 Comer guards fr all comers inside propaaton areas. Galvanized MS angle comer protection shall be provided for comers of stores, dor opening of goods Tftand unloading bay 2. Rubber guards on all columns in the basement/grouné Aoor parking areas, 5. Allowance for area of matlepranite clang to ‘enance walls columas. 4, Allinteral prtins tobe 150- 200m block werk ‘wth plastering on both sides. 5. ‘The walls fr prep rooms (sper Lulu drawing), technical roms, generator, garage rom eto be fll, height 6, Proprietary manufactured cubicles fo wilt areas. “1. Ceramic tiles to flor and walls ofl, ablutions, af ea rooms, cleaning roms, et. Wall ies tobe finished af fas 200 mn above coresponding ceiling level Doors and Shutters Doors A-Extemal 1. Exteeal main doo tobe automat hing door with airlock of high standard lockable fom inside. 2. lecrical and eter technical room dost be see. 53 Aluminium / ste ower doors to plat roms. Tae wee esi? hike PROJECT DEVELOPMENT DEPARTMENT Doors Bate |. Fast actin rolling shutters insulate) to store entrances extemal and automatic steel eller str for ent tt betwen service / store are an supermerket/ loparanot store. With double lead doo rom Soreroom direct into the deerme store ares. 2. Meta lng shutters fr Supermarket Department store shop front 3, 88 180 HD sveng doors tall prepanton rooms fre rated if Civil Defense requze sch (tera) 4 Rear doors to prep. Roost be 9° double functions selflosingpish doors with vision panel. 5. Alloser intemal doors tbe solid core with ainate faced fnsh and painted frames with dors clases. 6. All door inthe office to be maple wood Finish and lacquer polished with decorative dex gn patty with tinted was and cence a per desgr and speciation ofLPM. 17. All doors shall have goo quai irosmongey {8 nuance dors for oles and techni oom to be provided with louvers 00 250 mm, 9. All doors to be with dor closersoypers unless cherwise specif. 10. Allie doors tobe with push plates and fixed handles ‘Windows Windows in office ares to have maple wood ames with decorative design, achirave, and feed gas. ‘Windows for reparation areas to be Fixed gs ype with sluminum powder cote fames tothe netret RAL calor ‘efeence 0 ouside wall lex. Windows for data ‘atryrecevingscurty office to be aluminum powder coated ‘ype with siding plas, ‘Wal finishes: Preparation Rooms 20. 20m Glazed white exami es in preparation rooms and ‘acing the sales aren decorative ceramic lees et Lula design, Walls fo be provided 200 mm above ceiling evel (it ot fil ei). Pee PROJECT DEVELOPMENT DEPARTHENT Sales Area/Wall Sot Common Area Walls, Clumas, and Calling Basement Wall ofits All walls instore, bck covridos tobe paint! full height by ol based semi-gloss light grey) (oto) of equal Al back area including store, loading buy, corridors sal have painted Sofi. ‘Walls and soft to be pated by emulsion pnt (tun) or qual. Color rt 1 be advised by LPD, Decorative pint to Architets approval. (oti, Al Walls, ofits, columns have Jd foe enel pin, matt Tish, Columns to have necessary color and umber denteation markings Super Imposed Live Load On Slabs + Ground oor loading rea ad Strerooms Min 1S0Kg/m.» Ground for Salesarsi— Min S00 kg + Fist Floor Min. 00 kg/m? ‘Slab for Technica Installations ~ Min, 900 bn? (Cvidal ealelations reqied based on slected uipment. Floor Finishes Basement Basement ground lor parking: high performance polyrethane/ epoxy resin coating Wai guard or equivalent {0 provide lasting and tamper proof oor firs fo roseive high traffic: Necessary road markings to be povided for sven, exit po eny, disabled parking te External Ground Floor ‘None sip Granite nar the extemal entrance Supe 300 x 300 x [3 mm (= pr fom fish layout), Special vitted porcelain es. Al Mores inside suparmarket fe laid over cred concrete sed, with waterproof adhesive and grouted with poxy grou, Loading hay :H.D POLYURETHANE sored Preparation roms : MMA or Polyurethane sreed 35 mm ‘Storercoms : HD 300x30x13nm Vif Porelin ies Publi aren : 600x600 /400 x 400 x 10mm Vitifed Porcelain tiles. Tenants area : Flor slab only (nish by tna) PROJECT DEVELOPMENT DEPARTMENT Fint Floor ‘Tenant areas Floor sib only (Finis by Tenant) Deparment Store: 600. 600x 10mm ‘Vite es (Design, color, and quality as per Lu’ egiremens). All Aor tiles to bo aid over cured Tnishes ered with adhesive only. Water Proofing All wet areas and preparation ares to be povided with nscesary wate proofing. Flor below eold rooms fo be Screed fished to 2eo level rear receive panels (supplied an installed by reffigeration sub-contract. Prayer Rooms (Flooring) Internal praying oom (Masi) sal have sit serge ish ro receive carpets by Lua. Ceitngs 1+ Prop rooms: 600x600 sum malic urpende citing (Pain without perforation). ‘Supermarket 100x 100mm open gi siting. ‘Gypsum bulked, Department Store: Gypsum cling and bulkheads ‘Maga Grid ceiling for checkouts, gypsum sections for cove lights ete 1+ Offices to have 600 x 600 mm cilng ‘ypsun/Aluminium with bulbead aed pain gypeum cane ‘+ Common ares: To have gypsum ceiling with bulk heads and cove light sections. 1+ Necessary access doors (Aluminium) to be provide in celling a required cargo Litt ‘Two no cargo lif frm loading bay art oor above 2X3, sm (in) Each capacity 25 Ton The dor width shouldbe no fess than 1.3 meter ‘Passenger Lift from Ground Floor to ‘Offices (if multtevel) Standard, good quality pssenger i with emai of no less than 6-9 persons ‘Customer Lin Atrium Area Gf rmaltteved “wo no panoramic, rectangular pasenge ifs minimum 25x 535 meter combing ll evel woe Pe Suinea t ay Lede PROJECT DEVELOPMENT DEPARTMENT Excalators or Travllators (itappliable) ‘Travellators (1 Pai) combining ll Noor leves sealators tobe standard, while travellers gute 12Dep.neining Stairs Stairs etrances for public to have stainless sel hanals and fs alates a for atrium cutouts). Mil ste! pasted Frndrail and base fr non-public areas. Fie escape stats to have finishes as per Civil Defense egurenents External Signage Lalu wil install external signage eaing alu Hypermarke in both English and Arabic with logo, The numbers of leations depend on ste coniion (nin 23 nos) xpansion Joints All stucturaVeonstructon joint to be provid with proper metal profiles in lor, wall and ceilings. Necessary coat Joint be provided in Nooring a required General Requirements _* rubber guards for loading aes, Loading bay to have necessary provision (2 nos) for insaling deck levelecisor tik ‘role bay for basement/ground for. ‘Rolling shutters to Basement enranclexit AlTeast one aces to oof by sa. Losing by to rescve ables and verhendshuters see dete atachment), By Lute PROJECT DEVELOPMENT DEPARTMENT ‘MECHANICAL SPECIFICATIONS-FULL, FINISH HVACSrstem Generals ‘The project AC load! tonnage requirement shal be ealculated based on the Heat oad clultions and final architctral drains. 1. Design Contos forthe project shal be as flow: External: 46°C DB, 294°C WB (Summer) Interna: 234/-1 °C DB, 50+ 10% RH. (Summer) (GHumiity uncontrolled and hence resultant humidity isa function of the set pint temperature) Winter eating sal be provided forthe projec sper LULU Team requirement ony ASHRAE Standards 62:1 & 90.1 stall be used for occupancy, ventilation & ightng Rates ‘tract and makeup ar for tenants kitchen hoods sal be provided by tenants Cooling loud forthe Retails FAB Resturant shal be calculatod based on srw? /TR, Solar loads tobe base on maximum instantancous values in apeopite distin fr consideration ofthe worst exposure calculations and to be based on worst cumulative block lad 7. Ai Filton sal be based on ASHRAE $2.76 Primary Biers (lat Panes 859% 1, Secondary tes (Bag): 95% ‘© Fan cil unis shal be provided with 25mm thick cleanable aluminum panel iter Chilled water to Cooling Ci shall be as below: 4 Chilled water lt temperate 5.55°C Chilled water outlet temperature: 12.22°C 9. Piping sizing shal be based on ASHRAE Guidelines and based onthe recommended pressre drop limit of 400 Pal, However, the following recommended velocity shall be considers: 4. For pipe sie below OSOmm: 12 m/s 'b. For pipesies fiom 050mm to 400mm: 2.4 mis For pipesies above O4S0mm: 4 mis 4. (Pipes tobe sia for fll low rat ofall cooing cols) 10, Maximum col fe velocity for FAHU / AHU/ FCU machines shall not exceed 2.5 Mi ‘ew laugroupiteratira cm one 8 Miike oro PROJECT DEVELOPMENT DEPARTMENT Ti, Dastwork sal bo designed on equal Wicton method as pr below ecommendatics ‘4 Foe fin col units ‘Supply/etur ir ducts: Maximum velocity -900 FPM (4.50 MSc.) ‘Maximum pressure drop ~0.05 inch per 100 Ft (040 PaNd, 1, For Air Handling Unis: ‘Supply aids: Maximum velosity = 1500 FPM (7.60 m/s) Maximum pressure drop = 0.07 pr 10 F(.60Pa/M). ‘Ret ar det: Maximum velocity = 1200 FPM (6.10 m/) ‘Maximum pressure drop = 0.06" per 100 F0.S0Pa/M). ‘& For central extract Maximum velocity 1800 FPM (10 Mee) Fans! esa units Maximum pressure drop ~0.10 inch pr 100 (0:80 PM). ‘© For smoke exact fan: Maximum veloity~2200 FPM (112 MiSee) ‘Maximum pressure drop ~0.15 inch per 100F (1.20 Pa). Duct fim commercial kitchens: Maximum velocity = 1500 FPM (7.60 Me) ‘The above lini maybe exceeded in areas where space estction ext 12, Selection ofr enminal shal be cried ot based on maximum face velocity ofSOFPM (25 ms). 13, Silly, ite louvers shall be sized on maximum face velocity of 300 FPM (1S ms) and extract ir ouvers on maximum face velocity of 400 FPM (2m). Face ara shale the gross area sd not he net fe aren, 14 Airconditioning ofthe project shal be achieved by a variable ow chil water syst with high ffciency Ait cooled chillers with Srew compressors with Ra refiigerant Each chile shall be she to meet the rated duy tthe spestied condition, Shall consider one stndly chiller oF 20% safety factor on ttl projet AC demand, Recommended Vendors Trane, Yok, Carer & Dakin. 15. Chillers shal selected to havea minimum COP of 3.1 at AHRI conditions and COP 23 at fll Joa conditions, with supporting thid-Party test create, Shall propose chillers with multiple refigernt circuits with s minimum of two refigeaat circuits which shall be completely independent of each ote, 16 Chiller selection sal be soch ht it shal beable to continuously pert for st 55°C ambient temperate 1m of hows 17Chilled water Pumps with set of Constant speed primary pumps and Variable Speed Secondary pumps shall be considered Recommended Vendors: KSB, Grundfos & Armstrong. 18, Pumgs shall be ofa duble suction horizontal split case design to facilitate servicing all internal components without disturbing pump, volute or motor. ‘wer luugroupiternatonal.cen ike PROJECT DEVELOPMENT DEPARTAEXT 19, Shall consider chemical dosing units, Air & Dis separators, pesurizaton sytem ee, for efestive fimetioning of plan. 20, Two-pipe chilled water fan cil unis or Blower coil units (FCUSIBCU's) shall be used to diver cooling oll i-conditioned spaces. FCUs shall be predominantly cing concealed ducted type with return ar plonun an flat panel washable fier, PCUs shall be low static type with standard three-speed AC fn motos with permanent split eapacitr, F.CUs sal be controlled by modulating 2-port control valves a Pressure Independent Balancing ‘Control Valves (PIBCV) and shall be protected by inlt sung. Recommended Vendors: T&A, Potinaroi, Siemens, Danfors, Honeywell & Flowson, 23, Building shall be provided with ovo central Dedicated Outdoor Air System its (DOAS or FAHU’s located on the oof of the bulding. FAH unit shal eof double deck configuration with ‘orl encay(cthalpy) osovery wheel, mn cooling col and Hest pipe runaround col 24, FAHU and Roof mounted AHTU units shall be double skin wit SOmm injected PU insulation with sinted aluminum sandwich panel, and heavy duty lov leskage hinged doors and lckable hands. 25. Supply ai intake shal be iered through G-prfiter and F-7 bag fiers ection while extrac ie stream is filtered though one tage of lt panel washable iter to potest the energy esovery ro, 26, Shall not use heat recovery fom kitchen exhaust ai that is grease contamizted and could contaminate the filters and damage the energy recovery wheels. 27. Toilets, guage rooms and other spaces where exactions required shal be povided with roof 2 2 ‘mounted or celiog mounted ot extrac fans. 28. Aircurtains shall be installed a all eaances of the mall 1 void inflaton, 29, Make all ductwork, ules specially noted otherwise, of galvanized sheet tee scnforming to BS 2989 or ASTM AGS3A, 653M, G90 (2275) and having 2 nominal coating of 1.25 oe 30. Concealed supply teu and exact i ducts shal be insulsted with 25 mm thik, 2 KM density aluminum fl faed fe las dct insulation. Faston the insulation with ahesiv> on 200 t0 250 ‘mm centers. But all joins tightly and sea al breaks an joints by adhering 75 mm Aluminum foil ‘vapor bate tape or sheet with a freretardant adhesive, a For duets exposed in air condoned and non st-conitioned ares, sal insulate using the method esribed for concealed dts, but using insulation with minima thickness of SO mm, 48 Kp/M3 lens gid iberlass insulation, "we lugroupinesaionl cm ae 130 Aska 32. Then pply 820420 (hreadnch woven glass lth cove adhered beeen two cous of fie resistant fungicidal protective lagging adhesive, Thn cover with lan shet Aluminum 0: mm or thicker 433. Insulate flexible comectons and connections to difusers with 25 mm thick, KMS density ‘einfrced aluminum fl feed, Mame resistant flexible bergass 4. Clld water pipes shal be black see with dimensions conforming to ASTM AS} SCH 40 fe pipe sizes upto O150m and SCH 30 for pipes 200mm and sbove, Pipes shal be pated with to ‘coats ofr exie primer pir to application of thermal insulation, 35. lille wate pipe fitings shall be back steel fo ASME B16.9 with but-welding ends or with _r0oved ends suitable for mechanical jointing for 6Smum and larger ie and shall >eMalleable ion te ASME B1643 wit heads ends for 50 mm and smaller size 36. Refigeran pipework shall be insulated with closed ell synthetic rubber foam insulation, 25mm ‘hick and finished as desribed for chilled water pipes. 37. Chill pipes shall be generally insulatd with rigid sections of aluminum fel fice glass fer Insulation with density of Kgln3 having thermal conductivity factor of 0.034 win ka 10 deg (C For indoor application, Closed cell selF adhesive fam tube seton with aluminum fil ype insulation slo seceptabe 38 Internal chilled water pipes inside buildings shal be insulted by 4Om thick gd insulation for ‘ines upto 040mm and Sra thick rg insulation for pipe sizes OSOmm and ove, 38, External chilled water pipe (on root and i chiller yard) shall be insulated by SOmum thik iid insulation for pipe sizes upto O40 mm and 75m hick gd insulation for SOx and above. 40, Fungicidal protstive coatings shll be applied over extemal surfaces of chilled water pipes and interior and exterior srfices of ductwork Coating shal be polysey/late copolymer emulsion specially formulated for longterm fungicidal sctivity with n loss of activity on aging. It shall prevent the spread of mold and odor causing 4 bce onthe applied surface, Costing shall mest the requirements of NFPA 90A and 908, 42, Kitchen exit ductwork shill conform to NFPA. 96 and shall be air and watertight welded onstruction manufactured fom 16-gauge back sce! sheets in accordance with BS 1489, Part 1 Grade CRE GP. Ductwork sal be painted onthe cutsde with two cous of heat resistant galvanic Print afer manufacture. Duct work shall be enclosed within a two-hour fie rte enclosure in accordance with NFPA 96 43, All Kitchen ducting sell be insulated with SOmm thick, 105 kgin3 density Rockwool boat Insulation, then apply @ 20:20 (thweadinch) woven glass cloth cover adhered between 199 coats of ‘ore ugroopreratonacom ad z Qiks nner sre so “evasion Fungicidal protective igang ahesive, Then cover with pan sheet Alsminum, 09 mm cov thickr. Chile water provisions shall be considered fo althe tenant shops With BTU mete; lating valve ‘on bot supply & return, Dovble regulating valve on ret line and By pas ie with Isolating “ valve 45, Prethairand general extrac duct provisions shal be considered shal be considered foal he enn shops fom Mall FAHU's such that tenant shops aren negative presrecomparedto Mall corridor 46, Provide aces panel fo leaning of dts t 10M spacing on horizontal runs and avery two floors on vertical ies 47, Al support, stiffeners, Manges ee. sed in ductwork and pipework constustion and instalation ‘shall be hot dip galvanize, 48, Chill water fshing, chemical treatment, balancing an sr balancing shal be performed. 49, Testing & commissioning reports shal be submited and effective faneton ofl te services to be confirmed, Typical for drainage, water supply, fieighing& gus systems 50. The requirement of closed contol units for server or IDT rooms shall be coordinated with LULU 51 Al re staicases sll be pressurized vi dedicated supply fan to keep stareases under positive presue in ese of re. ‘52. Therequiement oi wll pressurization system is subjectto projet requirement, abe coordnaed swith LULU team, 53. Allzonesin he building shall be provided with smoke management system to extast smoke incase offre vie fir rte smoke duc risers connected to dedicated fie ated smoke fans, Fresh makeup sir shall lobe introduced to these areas through the dedicated makeup ait fas. 54, Al he smoke fans shall be UL sted and lca civil defense approved 155, The public ares sll be provided witha smoke extract system wih fans installed roof level ‘56. Makeup aie sal be provided tough make-up air fans or shal be allowed in through he entrance loots which shall be signaled through the fie alarm pane, to remain open in the event ofa fir Simoke detectors installed shall detect smoke in th evento ir, ad sina he soke extract fins ‘oun trough the fre alam panel 57, Smoke curtis shall be proposed i requited a per lea evil defense requirements ‘58, Major tenant shops shal be provided with smoke extrac fans and dust provisions: one point with ‘anked off connection, Tenant shall provide internal distribution a8 pr then layout ‘wn pepiratonalcom pee ay Lake orn PROJECT DEVELOPMENT DEPARTHENT 59, Smoke conto nd Carbon Monoxide Detection System to be provided inthe basement car psking if required as per projet requirement. (60, The resuirement of BMS sytem forthe projet sal be coordinated with LULU “eam. 61, Proper control and sequence of operation for complete HVAC system shall be corsdered Hypermarket: 1. The hypermarket reais mainly divided into 4 zones namely Supermarket, Department Store kitchen preparation area inluding back storage ere) and LULU Management oe. 2. Chilled war provisions forthe LULU Hypermarket shall be provided with gate valves on supply nd return lines and DR on return tne. 3, Dedicated BTU meter shall be considered inthe chilled water pipe provision in LULU premise in dion to ove mentioned valves Is lotion sll be wth ety accessibility fr inspection 4 Shall conser cooling lod af approximately 18s, mtn forthe Supermarket wa. 5. Inaktonal to AC cooing load, 100% weated fresh arom dedicated FAHL sal be proposed. “The fresh rin CFM) shall be 10% more than the net extraction fom the kitchen reparation are. 6, Shall conser cooling lod of approximately 16 sq, ton fr the Deparment Str area 1. Stall popoteS-7TR fie throw blower coi units with Imeter duc run with bell mouth connection & gril in supermarket sles rea i there open cling. Ilosed fale eelng ssvalabl, shall propos 57 ducted blower coil units. {8 Similarly, shall propose 5-7TR fee throw blower coil nits Imeter duct run with bell mouth connection & gril in depariment store sles area ithe design swith open cling If closed fuse ceiling is available, sal propose 8-10TR ducted blower coil nits or rof mounted AHU machines with supply and return ducts 9. Alle blower co unis in supermarket & department store sales areas shall be medium sped low stati only. 10 Te installation of AC machines in supermarket & department store shall be such hat the supply ait throw i always towards teen preparation roms 11. The leation of AC machines above shelvesacks in hypermarket sles ata shall be avoided for easy & secessible maintenance. 12. AC machines above floor mounted fezesilles in supemarket sales are shall be avoided as this rea will already be cooled by these chillers and condensation may happen. Becuocmeteteae min ike PROJECT DEVELOPMENT DEPARTIET 13. FCU machines wit detng shal be proposed in kitchen preparation rooms ané LULU Management oie aes 14, Recommended to propose circular cling difiser in department store aes aren i fle eling is svailabe V 15. The kitchen preparation area is basically divided into 4 departments namely Fh Department, ‘Butchery or Meat Department, Hot Food Departnen & Bakery Department 16, AC isnot equiredin the sales counter ares located in each depariment however shall propose AC ‘huough ducting with supply difisers in font ofeach deparent, 17. AC isnot required inthe cold rooms and freezer rooms and some Kitshen peption rooms tke fish preparation room, meat preparation room, chicken preparation room, cold kt & deliprepaaton room and cream room. These rooms wil be cooled by evaporators fe by central reigeiton pant. 18. AC machines shall be located outsie fr eleeizal, telephone, IDT, server roms and all other ‘echnical roms. AC shall be served through supply and eeu ducting and wal gril 19. Server oom temperature shouldbe maintained st 18 degrees Celis by dedicatd FCU and shall Propose ditional stand-by DX-split unt inthis room, 20, Allsaircases shall be provided with nominal cooling to avoid condensation and mitre bil up. 21. The location and instalation of AC machites shall be coordinated with stelstctute design if applicable 22. Condensate drain piping forthe AC machines inthe Supermarket and Department store sales area shall be proposed with required slope which shal be connected to nearest waste pips, 23 Ktehen extraction concep design layout willbe submited by Mis LULU with Nt ection details snd required fresh ir details rom ktchen/preparation roms. 24, The tcen veniltion design stall be as pr LULU concept design proposal. The scope of works for supply & installation of kitchen hoods will be under Mis LULU soope of works. Hoods connection to Kitchen ventilation ducts shal be unde eoatactors scope 25.MS ducting with rockwool insulation shall be proposed for kitchen extract docs connected to ‘Kitchen hoods. GI ducting shall be proposed for al other kitshen extract ducts and make-up ar duct works 26. Shaft upto roof level for routing of kitchen extraction & kitchen make-up air duets shall be consdored. All kitchen extract and make-up se fns sal be install on roo oly 27. Make up arf forthe double skin ho to be equipped with movable sand trap ler ‘ewllueupterationa.com pon Bla PROJECT OEVELOPMENT DEPARTENT ‘24, The keen extract hoods shall be equipped with ire suppression sytem a per lc evil danse regulation. 28, Dvet fom the Arabic oven and Pizza oven cirmey should be black ste up¥© 6 m and to be connected to the minx duct. 30, The fesh ir shall be distributed in supermarket and department tore sles area oly such tat air throw through sie grils is towards Kitchen preparation rooms. Fresh ar distribution in kitchen ‘preparation area and back-store are snot required. 31. The fresh sir sribution in LULU Management office shall bas por ASHRAE recommendations. 532, Roquted shaft openings for routing of fresh ir dct shall be considered in Superset premises, 533, Dedicated space sal be considered in oo oor for Mls LULU for instalation ofFAHU machines and Kitchen vetation fn 54, VOD's shal be considered for bench ducts wherever require for ar balancing ard contol 38,Fire rated VCD's shall be proposed in MS blak ste! fre rated duets for ar balancing and controling of hot exact ait fom kitchen hoods 346, Fire and Motorized Fite Dampers shal be proposed in the ducts serving in electical ID, server rooms et, and dusts crossing fie rated walls spe local fire authority requirement, 37, Wall openings sal be considered for ret ir passage in areas whee one AC nce i serving more than one room. 38, The theemostas in LULU supermarkt and department sore salas area sal be ated on nearest ‘on a2 Smt rom FFL. General nae for same shal beaded in design layouts. 38, Thermostat in htchon reparation re and offic are shall be provided wit okabe covers. 40, Air curting sal be considered inthe enuance doors and in lsdig/unloading by area o prevent sie inition, 41, Therequirement of lesed contol units for Server toms shall be coordinated with LULU team, 42, Dedieted basic BMS system shall be proposed for controlling & monitoring of AC machines (ECU's, BCU’s & FAH’), Kitchen ventilation fans, olet& genera extract fi 43, Smoke management system with moke extat and smoke make-up air dts shall be proposed for complete hypermarket area complying wth local Civil Defense regulations. 4, All other general specifications mentioned above shall be fllowed for hypermarket area a8 well a a Tom, has UAE Te AO == ‘er layprteratanl cam se Mike PROJECT DEVELOPMENT DEPARTHENTT Drainage Sate ‘The Sewage & Storm water systems shal be designe in accordance with local municialiy guidelines and typical detail and uniform plmping code General: 1. Thre pipes system wil be used (Sol, wast and vent fortis project. 2. Malis wl be used as possible to avid horizontal long run of the drainage pipes. 3, All vent eainage pipes shall be extended up to roof terminated wih vent cowl ca, 4. The sil and waste drinage fiom the building shall be connected to inspection chambers and ‘manholes, the sewer ine fly shall be discharge to Munsiality existing seer line. ‘5. Minimum Dep of the inspection chamber shall be 60 em and minimum slope Fo manhole to ‘manhole sal be 1/10 for 0150 mm pipes. 6. Drainage pipe work below grade with nthe building upto the manholes shal be UPVC BS660, 1. Sanitary drainage, Rain water and vent piping insted above grade shall be UPVC to BS4S14 for pipe sizes 8Omm diameter and lige and MUPV or ABS to BS5255 for pipe sis SOmm and smaller Figs shall be pus it ype or solvent ype 8. Dinage pipe work between manholes shall he uPVC Clas 16, Din pipe wok installed below building and roads shall be provide with 1Sem concrete encasement. 9. Exteral Storm water drainage sytem shall be of fiter gas reinforced epony pipes and tings comply with BSS480, 10. All pipes an tings installed inside the building forte kitchen waste and vet piping up & down stream grease intereptr shall be high density polyethylene (HDPE) to DIN 1955 or equivalent Bits Standards. 1. Condensate dain piping shall be PV Clas Eo BS 350S with solvent welde fing to BS4346 ‘or installation not exposed to iow. GI Pipes o BS 1387 Clas B with threaded fittings o BS 1740, for installation on roofs an within pant eons, 12, Dedicated von pips shall be un fom ist inspection chamber f every ead of lis up orf, 13, Sewer neowok shall be designe wo ensure minimum selfleming velocity of 0.75mise achieved atthe peak of sewer system and Maximum Velcty of 3 mies. 14, Storm Water syste stall be designed based on local anf intensity, with $year tur pviod 1S. Roo, baleonies, Asphalt, paved areas, Outdoor carpark, shall be dened into a separate storm sower system ‘ww uugroueeatinal. com roa 6 Bhike PROJECT DEVELOPMENT DEPARTMENT 16, Storm water system shal include Roof tains & catch basins distbuted inthe sit plan and ear park rasa applicable, Sand and oll interceptor for car parking drainage system shal e considered. 17 Storm water shal be colleted and discharged into Main municipality storm watersystm 18. Condensate drainage pipes shal be connectod to nearest drainage pins. Shall no be conected to sain water foe dnchage lines 19, Condensate drainage pipe provisions shall be considered for ll the tenant shops and connected 19 nearest oor dain 20, Waste drainage provisions shal in cooninaion with LULU team, tbe considered forall th tenant spuces located inthe round floor 21, Reguirement of soil waste line for tenant spaces sal be coordinated with LULU tans. 22. Kitchen waste and normal waste drainage pipe provisions shall be provided forall he F&B and restaurant tenant shops. 23, The kitchen waste deainage pipes from tenant spaces in food court area stall be cornected to Grease Interceptor before connection tothe main drsinage newark Hypermarhet 1, Soil, waste and vent drainage piping shall be proposed in public oes, supermuskt, department store and LULU office area 2, Shall consider thre separate kitshon wast rnag ines for kitchen preparation tea, Shall consider lets pipng for unage points in Fish, Butchery departments, dedicated piping for Hot Food Deparment and dedisted piping for Bakory department 3. Inline to above point these 3 kitchen waste pes shal be route separately uni enneced fo three seperate “Type gress interceptors then shal be connote ro building ranage manhole 4, Dinage requirement forthe kitchen preparation ae wil be submited by Mh LULU through drainage concept design layout fo further coordination 5. The height ofthe drninage provisos is clerly mentioned inthe concept drawings. Same shal be considered an reflected indesign layouts and shop drawings. {6 The drainage pipes fom band washbasins, ktchen sinks, condensate drain and all other kitchen equipments shal be connected to ners floor raps prior to connecting to main danage ie. 7. Model, Type & Insalation of Grease interceptors, channel ratings, flor dans ard lor cleanouts {in kitchen preparation rooms shall bas per ypical details shared in LULU Concet design layout. "in eopisernon som nots lua PROJECT DEVELOPMENT DEPARTIENT 8 MSICI Channel gratings shall be proposed in the Loading Bay are which shal be connected to building newerk though snd and oi interceptors. 9. Installation and connection of sanitary ware fixtures fr toilets spaces and LULU Management office seas be contractor. Supply of sanitary fixtures shal be coordinated with LULU team, 10. Allohe general specications mentioned above shall be followed for hypermark: rea as Well. 7 tem Von Ath UAE Ta “ianroupetemato om ea Dike ‘Water Supply System The plumbing sytem shouldbe designed in accordance with the recommendations of the Chartered Institution of Building Services Engioers and to the requirements ofthe local Wat and Eletisity Authority regulations. The atl water demand fr his shall be calculated based on he water demand calculations and inal design drawings General: 1. Above or below ground RCC domestic rw water tank with intemal ORP lining sll be provided ‘with minimum capacity of 1.2 times éily domestic water consumption. (Subject local authority guidlines) 2. Proposed tas shall have two compartments wit topside acess for maintenance purpose. 53. Tho requirement of Copper silver ionization system with ckculation pump shall te rechecked with Toca water autos epulations for leglonella management. 4 GRP domestic water tanks 2 No's with capacity of each equal 10 0.5 x day domestic water consumption reserve (otal 1 day) shall be provided on roof flor, ach water tak shall be considered wih two compartments ‘5, Tank shall resve the water frm he abovefunderground tank though aceniral sof variable speed Fiing pumps. The iting pumps sal il the rof water ans in 1-2 hours 6, Shall propose molimedia filtration system on rot lor drawing water fom one tank (nfltered) and restoring in anther tank (filtered), 7. Col and hot water pipe work embedded within builder's wok inside toilets, atone and itshans stall be Cros-linked poyetiylene pipe (PEX) according to DIN 16892 and 16893 pulled in a ‘comugitd conduit of ordinary poyetylene. PEX pipes shall withstand a water trmpratre up 10 95 deg, C ata maximum working pressure of 10 bar without deformation o danage and at short time temperature loaing up to 110-ermatket ars Dedicated water meter shall be proposed for LULU Hypermaket and is leaion shal be easily accessible for inspection, Sal ensure 2bar pressure is maintained inthe wate supply pipe provision for LUL Hypermarke Water supply requirements in the kitchen preparation areas wil be submited by MA LULU through Water supply concept design layout fo further coordination, “The height of the water supply provisions is clearly mentonad inthe above-mentioned concept drawings which shall be considered and reflected in dssigh layouts and shop rang osu elostrcal water haters shall be proposed fr each reparation room as pet LULL concept design layout. ‘The main water suply ln shall be routed through back sore! back corridor are wth branch pipe provisions fr each preparation room “ima uupoupeteratonalcm en 20 Bie PROJECT DEVELOPMENT DEPARTENT 11, Gate valve shal be proposed in each water supply branch pipe which hal be eal accesible for ‘maintenance purpose. 12, Aadtiona water suply provisions with carrie water filters shall be proposed in panty and ret 13, Wate supply pip sizing shall bein acordanc with Uniform plumbing code tard 1H, alter goneal specifications mentioned above sal be fllowed for hypematke area ae wel "tec, ows ou than UAE eee ‘ore grespterateralcm aoe “ay Lede Hie " Firefighting system sal be in accordance with the loa civil defense fire authority regulations and ‘NFPA guidlines, I be calculated to fee the wet ese system, sprinkler system andthe fre nts as applicable 2. Two compartments above or below ground RCC fre water tank with interal GRP ning shall be provided with top secess for maintenance purpose. 3. Shall propos Fite pump set consisting of one horizontal split ase type Elect Diven Pump, one horizontal split ase type Diese Driven Pump and one Electric Jockey pump. 4 Pumps shal be UL Listed and FM Approved in ation o local Civil Defense approval. Breaching inlets sal be provided tthe ground flor and to be connected tothe wet ise system and for diet connestion with he ire water tank. {6 Weeriser system shall be distributed based onthe escape routes & sat cases distribution ne wet ‘ser near every sar case to serve through 65mm landing valve and fe hose cabin Every prt ofthe floor area hal be within 30m coverage of landing valve and fre hose eabint. ws Fires reo cabinets shall be recessed ype with tales sal fish, 9. Extinguishers for sein Mechanical, lets and telephone Rooms sil be fussed with wall ‘bracket and sal be mounted on walls (To be complied with he local vil defense regulation). 10 Alleletical rooms, Transformer room, IDT rooms sever room and mechanical ams, telephone +ooms et, shal be provided with ir extinguishes or lean agent system as per loa ivi defense regulations, 1. Diesel generator room shall be equipped with foam fire suppression system. Transformer room & Gas tank shal be equipped with Deluge water spray system as applicable as pr ll evil defense regulations, 12 Each teoant shop shall be proved with upright sprinkles and tap off connection for the pendant sprinkler and wet ise pipe if esesay atone point with tap off connection. Tent shall provide ‘he interna distribution fr pendant sprinkles as per ther interior aout, 15, Fiefighting pipework above grade shal be to BS 1387 Class B,galvaninod seule designed for working pressure oft east 2070 kPa Standard fitngs shall beat eat ‘eta hey’ ype to BS 1740, whore pressures exceed 1200 Kpa. "i ueuprasonal a ae. a) Late mses oa 14. Pes sll be joint using mechanical rolled grooved galvanized fitings and shal be UL ised combination of ftings, gaskets and grooves. 15. Couplings stall be Vitalie syle 07 or equivalent designed tobe used with grooved en fitings 16. The ping connection baweon the main Fre pump and RCC water tank inludirg all tings end sccessoies shall be stints sel and shall be approved by both ivi defense and water authority. Rated peste shal be at east Sines the working presur. 17 Thi design criteria i ited to Faighting systom only. Refer electrical design criti for fire alarm system Hypermarket: 1. Upright sprinklers with zone contol valves/Alarm check valves shal be provided inthe complete Hypermarket area 2. Spink pipe provision sal be provided in LULU premise for farther distribution and instalation ‘of pendant type sprinklers. '. Pendant ype sprinklers shal be proposed in kitchen preparation roms in aeas with fle ecling and in hypermarket sles area if open rid exling is proposed 4. The requirement of dry sprinklers with pre-acton sytem in cold and freeze roms shall be rechecked with local vil defence regulation, 5. Fire hose sel cabinets (FHRC) shall be provided which hall be SS finish recessed type and their locations shall be oorinated with LULU Shop fiting yout. {6 Clean agent system shall be propose forthe main server room located nar office are. 71. Clean agent system shall be proposed forthe electrical telephone, IDT and other tectel rooms as er UAEFLS coderegultons 1 Fieextinguisers shal be proposed ia tecnica rooms, ales area, back rear, fie rooms and ‘ktehen preparation rooms as pe local civil defense regulations and NFPA standart, 9, Fire blankets shall be proposed inthe kitchen pepuration roms as per eal evi dense regulations and NFPA standards 10. Kitsen hood fre suppresion system (wet chemical suppression sytem) shal bs considered for ‘kteten hoods in hypeemaet preparation rooms 11 Allother genera sposfcations mentioned above shal be followed for hypermarket re a well "on larouprteatealcm ren i28 QLue Gas Suter ‘The actual LPG/SNG demand shal be ealeulted based on equipment’ and final design dravings The complete as system design and installation shall be in cordance with local civil defense recommendations and gas authority regulations. fin consumption dil from kichen Genera: |. The actual building demand for ga shal e calculated and shal propose gas tank capacity loated ‘08 0 lor or ground flor 2. Aas lek detection syst shall be installed o monitor for gas leaks at different locations of the gs network, 3. Gas il ine, below grade and above grade distribution pipework and Siting sal be as per eal vil defense recommendations and approval 4. The routing, sizing and provisions of Gas piping in mall cea and tenant spaces shall be with ll safiy measures pr local authority guidelines 5. Gas provisions with delisted Gas meters shall be considered in FRB tenant shops RestaurantsCaft's a per coordination with LULU Operations eam, 6. Gas provisions in tenant spaces shall include gas detectors, emergency shtot valves, isolating valves. 05 require, Hypermarket: 1. Gas pipe provision through dedicated shat shall be provided fr LULU hypermae nar kitchen reparation rea 2. Dedicated Gas meter shall be provided for LULU Hypematket whose location shal be easily accessible fo inspection. 3. The gas requirements for the kitchen equipments wil be submited by Mis LULU though Gas concept design layout. 4, Stall consider pressure regulators, gus detectors, emergency shutofT valves, presse gauges, isolating valves ete, srquied, 5. Allother gener specications mentioned above shall be followed fr hypermarket arenas well. lila > Power/ General Criteria PROJECT DEVELOPMENT DEPARTMENT ELECTRICAL SPECIFICATIONS-FULL FINISH Dedicated Power supply tothe total project shall be ensured from the local authorities by means of HV substation/panels/ RMU along with associated cabling works from the city power network to the site premies "The total load requirement for the project to be considered based on the power lighting, HVAC & other mechanical services layout designed by the consultant. The actual to be confirmed after completion of technical ravings Technical rooms of appropriate dimensions and specications to be considered for RMU/ HV panel, Transformers, LV panels as per the asuthority regulations ‘The required cabling from the RMU/ HIV substation in the premise tothe ‘wansformers and from there up to the LV panels shall be done as pe lca clectiity authority regulations by the electrical eantractorortheconcerned parties appointed by the Distribution company authorities. Proper air-canditioning tobe considered inthe HV panel & LV panel rooms whereas proper ventilation to be considered for the transfcemer room by ‘means of louvered doors and ventilation fans. (As per Local department regulations) Dry type transformers are preferred and the quantity & ratings to be finalized based on the total load requirement and authori regulations ‘based on consultant design. Proper earthing forthe neutral point of the transformers to be dane at site bby means of counter poise earthing andthe required value imposed by the distribution authorities ta be obtained. “aor As Da JA Ta aD reel hike PROJECT DEVELOPMENT DEPARTMENT TLV panels/ MDB are required for feeding the lad from tansformers and shall be designed as per the total load based on consultant design and as per distribution authority acceptance, Capacitor Banks with power factor improvement and harmonic suppression fiers (by detuned reactors of the order of 14%) aze required. MCC's for Chiller é associated pumps for HVAC and other mechanical cquipment’ (including kitchen extract and supply fans) tobe considered ‘sed on the design. ‘Single core and multicore cables shall be wsed based on the area of application. All the multicore cables shall be four cores with neutral same size of phases and separate earth wire from LV panels toall distribution cullets, Al the cabling from MDB up tothe final DB's shal be done with four cores XLPE insulated, steel wire armored cables, Alle cable sies shall be finalized based on the voltage diop calculation. For lighting and small power applications, single core multi stranded copper wires shall be use. Tor the wiring of Light points ceiling ross shal be fixed inthe soft of the slab (as per site condition) and the heat resistant flexible wits shall be used for the connection to light fixtures routed within G/ PVC fxibe conduit CCable trays used forthe distribution of the cables throughout the building and shall be heavy duty, perforated, hot dip galvanized with edges bend inward Cable trunking shall be considered for the distribution of lighting and power points from the concerned DB's along with PVC and GI conduits based on the area of application. Cable trunking shall be also hot dip alvanized Hot dip galvanized Gr conduits shall be used in areas where there is no false eiing and inthe external aren wherever applicable, Toe oro een oe By Like PROJECT DEVELOPMENT DEPARTMENT Proper earthing to be ensured a ite to comply with Distbation authority regulations and acceptance so as to achieve a value in the sange of 1 to 2 ohm, Dedicated energy meters shall be considered for the hypermarket as well asfor tenant shops if any) as per the distribution company regulations ‘Tenant shops shall be provided with Ibolators of suitable sing within the shop area as power provision, Lightning protection system shall be considered (Faraday cage typ) forthe ‘hole building with the network of copper tapes routed tiroughout the roof with required number of down conductors at suitable intervals being earthed at individual earth pits which are looped together. The electrical network earthing shall not be linked withthe lightning protectin system, The requirement of Bectrical rooms to be considered based on the load isrbution within the hypermarket as well as to the other areas, as per the design All Hectrcal rooms, Telephone rooms, IDT rooms and server rooms to be provide with copper bus bars with sufficient slots for connesting the Earth ‘wires from SMDB's, DB's body ofthe panels et, Dedicated network to be ‘considered for IT related systems Weatherproof switched socket outlets, 3 pin and 5 pin industrial sockets ‘with ON/OFF switch (along with male female connectors) of IPSS rating to be considered for the preparation area in the hypermatkst for heavy ‘equipment sted inthe equipment list. ‘The power outlet requirement has to be fulfilled based on the concept layouts & Kitchen Equipment lst from Lal along with the general requirements for the total project based on the final design by Project consultant. All the toe phase Kitchen equipment’ shall be provided with ELCB of ‘0mA within the sub main panels or DB'sas pr the Electrical layouts, ee ay Like PROJECT DEVELOPMENT OEPARTHENT Thekichen equipment’shaving rating {KW and more shall befed directly {rom SMDB with required RCD protection (combination of MOCE+RCCB) and those equipment’s having rating less than 4 KW to be fed from concemed DB's. Allthe single-phase socket outlets mentioned inthe preparation area below {als ceiling shall be weather proof (Minimum IP 54) as pet the equipment ist Earth leakage protection shall be provided for the lightng and power cireuls with appropriate ratings (100 mA for lighting end 30 mA for power). All the mechanical equipment’ feeding fom the sub main panels shall be provided with RCD's of suitable rating within the panel applicable to the heavy Kitchen equipments chiles, AHUs, FCUs, solling shutters, ans, compressors et. feeding directly from panels) ‘Adjustable Earth leskage protection shall be provided for all Heavy ‘mechanical equipment’ ike Chillers, Compressor panels ex. Dedicated Sub main panels shall be considered fr the Bakery and Hot food section ofthe hypermarket and the corresponding DB's shail be considered {rom these SMDB's ‘The power and light provisions (SMDB's & DB's) forthe preparation azea should not be mixed withthe sales area, ‘The loading of the Distribution Boards within the whols project to be limited up to a maximum of 30 to 35KW. For the whole hyper market, the lighting and Power shall be fed from ciated DB's and should not be mixed with each other (Except forthe Office area where a split DB can be considered) ‘A manual/automatic change over panel to be considered for supplying ‘power tothe minus range compressor witha provision for connecting to an external generator incase of long power outage For all Kitchen extract and supply fans the starting arrangement shall be ‘accommodated in the corresponding MCC's being located inthe electrical 7 Oc Sar an AE Tar BA eit la > Lighting 8 oom with necessary protection and the control wires shal be brought to the concermed preparation area al tobe terminated within < weather proof panel with ON/OFE/TRIP indication along withthe contrl switches, All the panel/Isolators located external to the builing shall be weatherproof (Minimm IP 65) [A dedicated sub main panel tobe considered for the departnent store and ‘the DB's required for lighting and Power tobe routed from she panel, Digital Energy meters shall be considered in the incomer of all MDB'S, ‘SMDB's, Compressor isolators and other major load incomer and to be linked tothe BMS system ofthe projec. ‘A dedicated BMS system shall be considered for the project to connect complete HVAC related components, Electrical meters, Gerator & UPS soit ‘The preferred make for Hlectrical Components (ACB's, MCCB's, MCB's, Contactors) in the Main, Sub panels and DB's- ABB, Schneider, Siemens Preferred Make for Spin/ 3pin industrial socket with ON/OFF Switch, Male & Female Phags & Weather Proof Socket outlets - MK, Mennekes, PCE, ABB, 18) Extomal area- As per consultant Design (including the building periphery area Als) with LED based fintures ) Basement area- Weather proof light fixtures as per consultant design (LED fixtures) 9) Supermarket 1. Design layouts shall be made based on concept lighting layout from Lule HO, 2 For shelf lighting and power at floor and wall in sales ares, control switches shal be provided in electrical room. 7 toc ork om pig URE Te Oe Pei a @) Comanon Area / corridor ouside the Hypemarket~ As pr conuliant Dsgn LED downlights with LED cove lights sper the ceiling layout 6) Tollets/ Abtution -1P rated LED fxures bused on cling yout 4) Tecknical roomy Pint room/ Hetil rooms ~ LED fixtures A), P65 having ‘wattage of maximum 40W CRIBO and CCT SOOOK 2) Department Store 1. Design layout hal be a per final concept layout fom Las HO 2 Signages availabe in the internal sections, shall be camected to the neacest lighting circa and the contol fr signages shal be along with light stares. 1) Office Ares ~ As per the concep lighting layout rom Lat HO, 3) Roof Areas. As per Consultant design with LED fixtures §)_ Special Food lights within the Supermarket are section counter willbe supplied ‘by Lal and hall eas pr the layouts from HO 1 The light points in the preparation area shal be controled by sites oct ‘within the concer area, but for sales area, Streroom, lading are, external areas ete tobe conte by grid switches righting conto tem, Theofice and staff aren to be conrlled by switches in individual rooms. Note All the LED light fituses shall ke of high quality fom reputed manwfactures ith good quality of LED chips having L90 lumen maintenance, the LED drivers from reputed manufactures with active power factor correction in the range of more than 095 and THD value in the range of ls than 15 to 17%, The total fixture shall be offered witha warranty of5 yeas, Allthe LED light fixtures tbe finalized in discussion and agreement with the concerned Lua team. The light fistures inthe sepermarket and department stare wil be supplied by Lulu. eee PROJECT DEVELOPMENT DEPARTAENT > Generator [A dedicated Generator (Stand by) is required for the following Hypermarket loads including the ATS and associated cabling. 4) Plusrange compressors. ') 30% ofthe total lighting inthe Hypermarket including the supermarket and department store ©) ForSupermarket sales area, every third row of linear lights shall be generator fea. 4) 30% of lighting in the common corridors. ) 100% lighting in toilets & service rooms, 4) Lifts (i mua-evel) £8) One set of travellators/ escalators (Ifult-level) yy UPS §) Water pamps/ sump pumps as per site condition. |) All Civil defense related requirements as per the latest regulations (ike smoke fans ete) + The exact rating ofthe generator to be finalized during the design stage by the consultant in consideration with the above-mentioned points ‘+ Dedicated room tobe considered for locating the generator possily near to the LV rooms to avoid longer cable lengths ‘+ Proper ventilation tobe considered in the generator room with louvered doors for the sufficient flow of fresh air required forthe operation of te genset along, the provision for removing the hot ar from the radiator and the diesel exhaust from the engine. + Dedicated earthing to be considered for the body and neutral point of the generator at the location itself. '+ If there isno possibility to locate the generator in a room, acoustictype enclosed ‘enertor set tobe considered and a proper location tobe coordinated at sit. ge Bhks Seen PROJECT DEVELOPMENT DEPARTMENT > The ATS for the generator to be located inside the Electrical oom rather than ‘being kept inthe generator room, + Typical rating willrange from 800KVA to 1200 KVA based on thesize of projects + Prferred make s Caterpillar, FG Wilson, Cummins, SDMO > UPS (Un interrupted Power supply units) Dedicated UPS's are required forthe operation ofthe hypermarket + SupermarketCheck Out - 2no UPS (10-15KVA) + Supermarket Backarea - Ino UPS (2030 KVA) + DeptStoresalesarea == no UPS (10-15KVA) + Server ~ 1 no UPS (®KVA) + Theratings shall be finalized base on the size of the prec and during {he na design phase. + All the UPS's shall be three phase IN and three phase CUT online type with a provision of manual by pass. (in case of failure of UPS during operation) ‘+All the UPS shall be fed from a common SMDB (ed from Generator supply) with isolators before connecting to UPS and all he outgoing of ‘UPS DB shall be provided with RCBO's and the incomer of DB's with MBs + Allthe UPS units to have a minimum back up time of 20 minstes, ‘+ Allunits shall be with SNMP card facility with BMS intefce + Prefered makes are Eaton Power ware, Newvave Chore, Emmerson > Fire Alarm System ‘+ Dedicated Fire alarm system is required for the hypermarket with Analogue addressable fire panel along with a combination of smoke & heat detectors, manual call points sirens etc. in compliance with the Yocal iui defense regulations. Alike PROJECT DEVELOPMENT DEPARTMENT ‘+ Necessary control modules to be considered in the oytem for the Integration of the main panel with the following, items such as FAHD, AHU, Smoke management fans, Escalators/Travellators/Lits, sliding {doors Hood suppression system, Zone contol valves of the firefighting system, Fire pump control panel, Cooking Gas panel and other items recommended by the Civil defense authority. + Voice evacuation system, ifrequired tobe considered inthe whole area as per the civil defense regulations + Dedicated loop to be considered for the tenant shops (if any) located ‘outside the hypermarket checkouts ‘+ Emergency Lights and directional EXIT lights shal be corsidered as per ‘the consultant dosign based on the civil defense regulations > CCTV System General A dedicated CCTV System to be considered for the hypermarket area with IP ‘sed type cameras ‘When designing a CCTV system for the Lulu Hypermarket the folowing criteria shal be taken into account 1. Tentative locations of camera ar indicated in the camera concept layout provided by the Lalu project tam which shall be fllowee for preparing design drawings 2 Cameras forthe external aren ofthe hypermarket tobe corsdered as per the consultant design including the asement, external ar pavk and periphery of the balling (whichever is applicable for ‘he concerned roe. 5. Legend and description as mentioned in the concept layout to be mentioned, 4. Two types of cameras shal be installed to monitor the meverent of the people as fellows: ByLike IP Fixed dome camera indoor type > IP fixed boxcamera outdoor type Alloutdoor cameras shall be in 1-6 housing and vanda: resistant type The required JBs, power supply, media convertor et. for cutdoor cameras shall bein waterproof and dust proof housing. 7. Complete CCTV power provision shall be fe from UPS supply. 18, Camera type whether recessed or surface mounted tobe coordinated with false ceiling. 9. In supermarket sales area if there iso false ceiling, dome cameras shall besuspended and the mounting height to bein ine withthe light Fixtures (tobe coordinated at sits) 10, POE switches shall be considered for all cameras with minimum 20% spare capacity {IL POESwitches shall have SEP port to connect fiberoptic cable for the long stance cameras based on the application ofthe project. 12, Cameras shall not be connected directly tothe POE switch, patch panels to be provided prior tothe POF switch for terminating camera cable 13, The distance from POE switch to camera point shall not exceed 901. 14, UTP CATS ethernet cable tobe used, 15, Monitoring workstation and OCTV equipment’ shall be located in ‘control room, 16. If there is no control room in the project architectural layout, the ‘workstation and equipment’ to be considered in security room. (Exact Tocation to be finalized coordinating withthe projet team) 17, System shall have provision of WAN connectivity for remnte monitoring. 16. Allcameras shall have the capacity to second at 15 fps, 19, Network Video recorder shall be provided forthe cameras as specified in the recording section and the numberof channels tobe censidered based ‘onthe camera quantity. Qe ee 20, For HDMI cabling, required conduit ize shall be considered from source to monitor location, ‘Camera Selection Guide (CCTY cameras shall comply with ONVIF compliant, the minimum technical parameter requirements shall be as follows Indoor Coou: Dame Camera ad [eeianon Nanbaaipics — [54 WF hil conpy wih Wear ad niu recglon rer) Tans "aon ea a Be Halk TRISTE] 1.2-12mm. Recognition Camera shall be fixed lens, ‘Minimum ‘0.9 Lux (Color), 0.1 Lux (Black & White) =a amination Nato Ceara or aT earn Sree — | Aa ang ge TR) a TDR Sona Day Ng Ye fenconalty ings oon — TPT Ties Compresion | 25 PEG Tome POF (Outdoor Bullet Cameras [Parameter PROJECT DEVELOPMENT DEPARTMENT TMP (Shall comply with identification & recognition criteria) Ballin Varifocal lens (28 12mm). Auto Iris Greater than or equal 18d 1 Ato Tigress Protection | 1P66,1K 70 ‘WOR S100 Day/Night Yer functionality Tntemal Storage | Should support minimum 32 GBSD CARD ‘Video Compression | Ha54 &MIFEC Power POE DC [RECORDING AND STORAGE 1 NVR Should have preinstalled Video management fanvtionalities and [HDD storage with a reliable operating system. Should support RAID, RAID-, RAIDS, RAID and RAIDA0 ‘redundancy storage scheme with hot-swappable hard disk drives. Recording storage shall beat least RAIDS, ‘System shall provide sulicient storage ofall the camera scordings for a period of 60 days or more @ 15 FPS. ‘The storage manager shall support the recording of MPEG-4, 1.264 baseline, H.264 main profile steams fom standard resolution and ‘megapixel cameras, It shall consider requited protocols available inthe market (current) to ‘support third party cameras, ‘Should have minimum 8 POE ports to connect cameras diectly instead of considering additional POE switch ‘Shall support redundancy/ Failover feature which allows to switch over to the redundant NVR ({f avaiable) 7 os 17m Ana UAE Tore rr ‘ueltioatuemaceaa By Lele PROJECT DEVELOPMENT DEPARTMENT 9. Should support playback live view and shall allow exporting of video simultaneously, 10, Itshall contain minimum output ports for keyboard, mouse, HDMI and Voa, 11, Minimum support up to SMP resolution. 12, Shall be able to manage, configure settings and update fiemware and software from remote workstation 1B. Ableto provide specific configuration settings for operator, manager and ‘Admin in case of viewing and recording contol 114 Redundant power supply shall be provided for more than 32 channels, [UPS Shal be provided, 15, Complete software's shall be licensed, and no recurring Hens fes shall be entertained. [EQUIPMENT AND MONITORING ROOM 1. For CCTV system separate racks shal be considered, 2 ‘The main rack size shall be as per the project requirement, The Intermediate racks to be 12U. 3. Por viewing, minimum 32" display shall be considered for every 1610. of cameras. Total no. of displays and size shall be based on each project requirement. (The screen size to be increased to accommodate more ‘cameras as per space criteria within the monitoring roam), ‘Workstaton/ Client PC 24" Display shall be provided for operator workstation. For every 64 no of ‘cameras a workstation PC shall be considered. Totalno. of workstaion PC's shall, be based onthe quantity of cameras available inthe project ‘The following specifications shall be considered TBROcSOF | Hail Core (G47 7 Professional Wo) RAM T6GBDDRS ‘Opscal — [BVD-R/W Thea) Drive a) Laka PROJECT DEVELOPNENT DEPARTHENT ‘GRAPHIC | NVIDIA GeForce with 2G Card CARD ‘Operating | Windows professional 61 BE System Ticense | Complete software's shal be Tense PEREORMANCE REQUIREMENTS 1 > PA System All cameras shall be continuously recorded on the CCTV network video recorders. ‘The Security System Integrator (SI) shall be responsiblefor visting the Site pris tothe bid date to verify the existing Site conditions. ‘The Security System Integrator (55) shall be responsible for providing cable and fiber from each camera tothe remote monitors and the vdeo headend equipment. ‘The System tobe coordinated with Lula IT team also, Shall comply with regional Shop requirements fd any thing in particular local authorities if any pertaining tothe CCTV system A dedicated PA system to be considered forthe whole hypermarket (both supermarket & Department sor, if oth are in different floors) with pendant/ ceiling speakers, chime mics (at customer care area for supermarket & Dept sore), which al other accessories being located in the security som, ‘+ Azaam tobe linked tothe PA system, + Dedicated GI trunking with a network of conduits to be considered for the complete CCTV & PA network with pull wires. 1 Preferred Brands for PA system- Bosch & TOA. Please note tha if the local police authorities have any partcularroquirement it shall also be considered, Bleu SHELL AND CORE Luke PROJECT DEVELOPMENT DEPARTMENT "TYPICAL TECHNICAL REQUIREMENTS ‘SHELLLAND CORE General Standards Civil / Architectural ‘Site Preparation and Sub Structures General sit leranc,cuting/iling to the required evel recesary compaction et Excavation for foundation and structures sper design frm consultant Pits for conveying systems (Elevators, Travolators, ee) 38 quired from the specialist ‘Super Structare Frame and Roof referable column grid tobe 9x9 m oapponimately height between floor to be 570m, inside cling at 80m fom FFL. Basement flor to be 3.60. Necessary area tobe provided at rofto accommodate water tanks, filler plants, condenser for refigerato plants, sopport for signboard ad other MEP instalation. Pablie Toilet Complete equipped tilts or public that shal inclu ole fo special nee acesible fom eomtion cord, and a dedisted room for janitors Prayer Rooms and Abltion Spacious prayer 1ooms for bah men and warren with sbiaons, Stat Totes Byala, Loading Bay Loading bay at the ear with suficint space for 5-7 wack oflosding. The level shold be 0.45 — 1.0 meter ‘below FPL level, and provided with individual electric operated overhead shuters and deck shelters foreach loading by. The loading area incl single drive's tlle with nance from outed. Tae Te wa res) “echnical Rooms nial oon al alas pe STS ‘ypu regione ich a compres ron or tegen pla eral ce fra cocoa Site roms, ump rms eer om, Deal om felon sr noe ge doo {aon oft eons be tp Laas eae cw Garbage Room Insulated waste rom with access fom rod level as per [Ll drawing. The wast room tobe provided with overhead shutter a well a two ses hinged dog wih ack ‘The for sab be 80-100 mm boow the ganeral FFL, xternaVEntrances 1 Proper entyexitto havea least thre in entry lexi to ‘he parking ata for publi and sepaatctry lexi for serie vehicles 2. Puking area to have paving/asphalt with inwater runoUstorm wate drainage and properroad marking & traffic signage with curstonepaition: wherever required 3, Loading are to have dain chanel cowed with toot GGntng 5-I0mm Heavy-duty high-pecfrmancesereed Shall be provided forthe ofoading platform. Rubber bumpers and edge protection tobe provided for the platforms. 4, Landing toll ain pubic entrances tobe granite (ix of polished flamed) preferably 600mm x 6mm x 30am fhicknese floor” ish, 5. Provision for soft landscaping in speed location inthe parking ara with ization By Laks By Lal, Doors and Shutters 1. xtemal main doors tobe automatic sliding doors ‘with dock high standard wit lock from inside 2, lesa an other echnical room doors to be steel 3. Aluminium steel lower doors to plant rooms. Pe Bike ‘Super Imposed Live Load On Slabs ‘Ground flor loading area. and Streroms Min 750 kg/m? Ground lor Sales area Min, $00 ke ‘Fist oor Min. 500 kg/m? Slab for Technical Installations ~ Mic 900 kg? (lndivigua calculations required) ‘Common areas ‘Bisrent round floor parking: high erarmance epoxy resin oting trai guard er equivalent to providea lasting and tamper proof floor nish fo receive high raf, Nectar oad ‘markings to be provided for driveway exit mw ety, disabled parking ee, All finishes in common areas to receive high quality, ocoratve celings, wall irish, column lading. The ‘xiling level in the corridor in font of Lal check cuts should emia. 36 m from FFL. ‘Water Proofing ‘Developer o ensure good waterproofing Lalu will eary out all equired waterproofing inside their shop. Prayer Rooms (Flooring) Public prayer rooms (Masjid) shall have in si screed fish to recvive etpets by Lub Cargo Litt “Two no cargo its from loading bay are to Doors above 1m (in). Each capacity 28 Ton The dor with shoald be no fess tha 1.3 meter Passenger Lif from Ground Flor to ‘Ofies (HF Mult Level) Standard, good quality passenger lis with epciy of no less than 69 persons ‘Cestomer it in atrium area (it mattteve)| “Two no rectangular passenger ifs minimum 2-3 x35 meter combining allel Cabin wall acing atrium tobe povided with window, Travellators escalators butwee al levels as agreed upon Excalators or trvelators Please note tht al esastrs and ravers to have 2 {itapplicabley comforable inl Stairs Sirs erances for public to have ainless sel handrails and ls Dalustades. Mid tel pained handrail and balustrade for ‘non-public reas. Fire escape sn t have fishes as per Civil Defense requirements External Signage Developer o provide lesion fr 2.3 external signage for Lalo Hypermarker wih Ly eo Pai fleremreeemennennficrnen satan faesmusctatheetctcttete ree] “lets th Wa ior hopping Le meeenertnate ttn ty sterelr cannot netted Description a Service imc 7 Peeemtntner ne Like {OJECT DEVELOPMENT DEPARTMENT [ELECTRICAL SPECIFICATIONS: SHELL AND CORE ‘Thebelow specifications shall be used in LULU projects eased as “Shell and Core", only ino other technical details are specifically mentioned in the contract, lectrial 1. Power supply shall be supplied by means of dedicated transformers (bed on area) oF ‘concerned LV Panels an the Cabling from the transformers up tothe main panelalong ‘with earth cables with provision for dedicated energy metering tobe considered. 2. Power requirement shall be considered roughly based on the criteria of 160 W/t¥ to 200W/mi2 for the complete electric load of Hypermarket, excluding the air-condition

You might also like