Update : 2 Mar 2023

IFR/IFA/IFC AS BUILT
LATEST
NO DOCUMENT NO. DOCUMENT TITTLE SHEET STATUS STATUS
REV REV STATUS REV STATUS
APPROVAL APPROVA:L

LIBO GS

1 PPPR-EL-LIBO-002 Equipment Layout GS Libo - Mindal 1 of 1 0 0 - Review Elnusa

2 PPPR-LP-LIBO-002 Lifting Plan Dismantle Pump Libo GS Mindal 1~2 3 3 IFA Review Elnusa

3 PPPR-LP-LIBO-003 Lifting Plan Install Motor (Spot P-03) Libo GS - Mindal 1~2 1 1 - Approved

4 PPPR-LP-LIBO-003 Lifting Plan Install Pump Libo GS Mindal 1~2 5 5 RE IFR Review Elnusa

5 PPPR-RM-LIBO-002 Road Mapping GS Libo - Mindal 1 of 1 0 0 - Review Elnusa

6 PPPR-TMP-LIBO-002 Traffic Management Plan GS Libo - Mindal 1 of 1 0 0 - Review Elnusa

7 PPPR-ISO-LIBO-001 Isometric Shipping Pump Libo GS Minas 1~6 1 12 AFC Review Elnusa 1 ASB Comment

8 PPPR-PIP-ISO-LIBO-002 Piping Isometric Drawing Existing Libo GS 1 of 1 0 0 - No Comment

9 PPPR-PID-LIBO-001 Piping & Instrumentation Diagram Shipping Tank Area Libo GS 1 of 1 0 0 - Review Elnusa

10 PPPR-DP-LIBO-001 Demolish Plan Libo GS - Libo 1~2 0 0 - Review Elnusa

11 PPPR-LOTO-LIBO-001 LOTO Plan Piping Dismantling and Install IMO Pump Libo GS 1 of 1 0 0 - Review Elnusa

12 PPPR-LPE-LIBO-001 Loto Plan Electrical & Instrumen For GS Libo 1 of 1 4 4 RE IFA Review Elnusa

13 PPPR-SP-LIBO-001 Modification Existing Skid Pump - P0204 Libo GS 1 of 1 0 0 AFC Signed 1 ASB Signed

14 PPPR-SLD-LIBO-001 Electrical Drawing Single Line Diagram For GS Libo 1~2 0 0 IFR Review Elnusa

15 PPPR-CL-LIBO-001 Electrical Drawing Cable Layout For Libo GS 1~2 0 0 IFR Review Elnusa

16 PPPR-LIBO-EI-CS-001 Cable Schedule Electrical & Instrument Libo GS 1 of 1 0 0 - Approved

17 PPPR-PEMODELAN-LIBO-001 Pemodelan Pompa, Motor, New Skid dan Pipe Spool Libo GS 1 of 1 0 0 IFR Approved

CGS 1

1 PPPR-ISO-CGS1-001 Isometric Shipping Pump CGS 1 Duri 1~4 10 7 RE IFA Approved 10 ASB Submit to Elnusa

2 PPPR-ISO-CGS1-002 Isometric Shipping Pump CGS 1 Duri 1~7 C C RE IFR Review Elnusa

3 PPPR-ISO-RCL-CGS1-001 Piping Isometric Recycle Line CGS-1 Area 1 of 1 C C RE IFR Review Elnusa

Demolish Plan (CGS -1) HO CGS Pitless Operation and


4 PPPR-DP-CGS1-001 1~2 0 0 - Review Elnusa
Improvement

Piping & Instrumentation Diagram Shipping Tank Area CGS 1


5 PPPR-PID-CGS1-001 1 of 1 3 3 RE IFA With Comment
Duri Area

Piping & Instrumentation Diagram Shipping Tank Area CGS 1


6 PPPR-PID-CGS1-002 1 of 1 A A IFR Review Elnusa
Duri Area

7 PPPR-LP-CGS1-001 Lifting Plan Dismantle Pump HPS CGS-1 1~4 2 2 RE IFA Review Elnusa

8 PPPR-LP-CGS1-002 Lifting Plan Install HPS Pump CGS-1 1~6 2 2 RE IFR Review Elnusa

9 PPPR-LP-CGS1-003 Lifting Plan Dismantle LPS Pump CGS1 1~2 1 1 RE IFR Review Elnusa

10 PPPR-LP-CGS1-004 Lifting Plan Install LPS Pump CGS 1 1~2 1 1 RE IFR Review Elnusa

11 PPPR-LP-CGS1-005 Drawing Lifting Plan Loading Welding Machine CGS-1 1~2 0 0 IFR Review Elnusa

12 PPPR-LP-CGS1-006 Drawing Lifting Plan Loading Tools Box CGS-1 1~2 0 0 IFR Review Elnusa

13 PPPR-SP-CGS1-001 Modification Existing Skid Pump HPS CGS 1 1 of 1 10 4 RE IFA Approved 10 ASB Submit to Elnusa

14 PPPR-SP-CGS1-002 Modification Existing Skid Pump LPS CGS 1 1 of 1 10 1 RE IFR Approved 10 ASB Submit to Elnusa

15 PPPR-SP-CGS1-003 Modification Existing Skid Pump HPS (A & E) CGS 1 1~2 A A IFR Review Elnusa

Page 1 of 5
Update : 2 Mar 2023
IFR/IFA/IFC AS BUILT
LATEST
NO DOCUMENT NO. DOCUMENT TITTLE SHEET STATUS STATUS
REV REV STATUS REV STATUS
APPROVAL APPROVA:L

15 PPPR-EL-CGS1-001 Equipment Layout CGS 1 HO 1 of 1 0 0 - Review Elnusa

16 PPPR-RM-CGS1-001 Road Mapping CGS 1 HO 1 of 1 0 0 - Review Elnusa

17 PPPR-TMP-CGS1-001 Traffic Management Plan CGS 1 HO 1 of 1 0 0 - Review Elnusa

18 PPPR-CL-CGS1-001 Cable Layout CGS 1 Duri HO 1 of 1 1 1 - Approved

19 PPPR-ICL-CGS1-001 Instrument Cable Layout CGS 1 Duri HO 1 of 1 0 0 - Approved

20 PPPR-CGS1-EI-CS-001 Cable Schedule Electrical & Instrument CGS - 1 1 of 1 0 0 - Review Elnusa

21 PPPR-SLD-CGS1-001 Electrical Drawing Single Line Diagram For CGS1 1~2 0 0 IFR Review Elnusa

22 PPPR-EE-CGS1-001 LOTO Electrical & Instrumen CGS-1 Duri 1 of 1 0 0 - Review Elnusa

23 PPPR-LOTO-CGS1-001 LOTO Piping Plan LPS Pump CGS 1 Duri Area 1 of 1 0 0 - Approved

24 PPPR-LOTO-CGS1-002 LOTO Piping Plan LPS Pump & Shipping Pump CGS 1 Duri Area 1 of 1 A A IFR Review Elnusa

25 PPPR-LOTO-CGS1-003 Loto Plan Piping Shipping - Recycle Line CGS 1 Duri Area 1 of 1 A A IFR Review Elnusa

26 PPPR-LPE-CGS1-002 Loto Plan Electrical & Instrumen HPS Pump For CGS 1 1 of 1 2 2 IFR Review Elnusa

27 PPPR-LPE-CGS1-003 Loto Plan Electrical & Instrumen LPS Pump For CGS 1 1 of 1 2 2 IFR Review Elnusa

28 PPPR-MEP-CGS1-001 Modification Existing Pipe Suction Header 12'' CGS 1 - HPS A 1 of 1 B B RE IFR Approved

29 PPPR-PC-CGS1-001 Piping Plan Cutting Header CGS1 - HO 1 of 1 B B RE IFR Comment

CGS 3

1 PPPR-ISO-CGS3-001 Isometric Shipping Pump CGS 3 Duri 1~5 0 0 AFC Review Elnusa

2 PPPR-ISO-RCL-CGS3-001 Piping Isometric Recycle Line CGS-3 Area 1 of 1 C C RE IFR Review Elnusa

Demolish Plan (CGS -3) HO CGS Pitless Operation and


3 PPPR-DP-CGS3-001 1~2 0 0 - Review Elnusa
Improvement

4 BSPR-EL-CGS3-001 Equipment Layout CGS 3 Duri 1 of 1 B B RE IFR Review Elnusa

5 BSPR-RM-CGS3-001 Road Mapping HPS Pump CGS 3 1 of 1 B B RE IFR Review Elnusa

6 PPPR-LP-CGS3-001 Lifting Plan Dismantle Motor LPS Pump CGS3 1~2 B B RE IFR Review Elnusa

7 PPPR-LP-CGS3-002 Lifting Plan Install Pump Pump CGS3 1~6 D D RE IFA Review Elnusa

8 PPPR-LP-CGS3-003 Lifting Plan Dismantle Pump HPS Pump CGS3 1~2 D D RE IFA Review Elnusa

9 PPPR-LP-CGS3-004 Lifting Plan Install Motor LPS Pump CGS 3 1~2 B B RE IFR Review Elnusa

Piping & Instrumentation Diagram Shipping Tank Area CGS 3


10 PPPR-PID-CGS3-001 1 of 1 B B IFR Review Elnusa
Duri Area

11 BSPR-TMP-CGS3-001 Traffic Management Plan HPS Pump CGS 3 1 of 1 B B RE IFR Review Elnusa

12 PPPR-CL-CGS3-001 Electrical Drawing Cable Layout For CGS 3 1~5 2 2 - Review Elnusa

13 PPPR-CL-CGS3-002 Instrument Drawing Cable Layout For CGS 3 1~5 0 0 - With Comment

14 PPPR-SLD-CGS3-001 Electrical Drawing Single Line Diagram For CGS 3 1~2 0 0 IFR Review Elnusa

15 BSPR-LP-CGS3-001 Drawing Lifting Plan Motor CGS 3 Duri 1~2 0 0 - With Comment

16 PPPR-LOTO-CGS3-001 LOTO Piping Plan Shipping Pump CGS 3 Duri Area 1 of 1 B B IFA Review Elnusa

17 PPPR-LOTO-CGS3-002 Loto Piping Plan Shipping Pump CGS3 Duri Area 1 of 1 A A IFR Review Elnusa

18 PPPR-LPE-CGS3-001 Loto Plan Electrical & Instrumen LPS Pump For CGS 3 - Rev0 1 of 1 0 0 IFR Review Elnusa

19 PPPR-LPE-CGS3-002 Loto Plan Electrical & Instrumen LPS Pump For CGS 3 - Rev0 1 of 1 0 0 IFR Review Elnusa

Page 2 of 5
Update : 2 Mar 2023
IFR/IFA/IFC AS BUILT
LATEST
NO DOCUMENT NO. DOCUMENT TITTLE SHEET STATUS STATUS
REV REV STATUS REV STATUS
APPROVAL APPROVA:L

20 PPPR-SP-CGS3-001 Modification Existing Skid Pump CGS 3 Duri REPLACE 1 of 1 3 3 RE IFA Review Elnusa

21 PPPR-SP-CGS3-002 Modification Existing Skid Pump LPS CGS 3 1 of 1 1 1 RE IFR Review Elnusa

22 PPPR-PC-CGS3-001 Piping Plan Cutting Header CGS3 - HO 1 of 1 B B RE IFR Review Elnusa

MINAS TANK FARM

Demolish Plan (Minas Tank Farm) Minas Tank Farm Pitless


1 PPPR-DP-MTF-001 1~2 0 0 - Review Elnusa
Operation and Improvement

2 PPPR-EL-MTF-001 Equipment Layout Minas Tank Farm - Minas 1 of 1 0 0 - Review Elnusa

3 PPPR-RM-MTF-001 Road Mapping Minas Tank Farm - Minas 1 of 1 0 0 - Review Elnusa

4 PPPR-LP-MTF-001 Lifting Plan Pump & Motor Minas Tank Farm 1~2 0 0 - Review Elnusa

5 PPPR-TMP-MTF-001 Traffic Management Plan Minas Tank Farm - Minas 1 of 1 0 0 - Review Elnusa

GS 1 - MINAS

1 PPPR-EL-GS1-001 Equipment Lay Out GS-1 Minas 1 of 1 0 0 - Review Elnusa

2 PPPR-LP-GS1-001 Lifting Plan Install Pump GS 1 Minas 1~2 B B RE IFR Review Elnusa

3 PPPR-LP-GS1-002 Lifting Plan Dismantle Pump & Motor Pump GS 1 Minas 1~4 B B RE IFR Review Elnusa

4 PPPR-RM-GS1-001 Road Mapping GS-1 Minas 1 of 1 0 0 - Review Elnusa

5 PPPR-TMP-GS1-001 Traffic Management Plan GS-1 Minas 1 of 1 0 0 - Review Elnusa

6 PPPR-ISO-GS1-001 Isometric Shipping Pump (Pump 1) GS 1 Minas 1~7 0 0 AFC Review Elnusa 1 ASB Comment

7 PPPR-ISO-GS1-002 Isometric Shipping Pump (Pump 2) GS 1 Minas 1~7 0 0 AFC Review Elnusa 1 ASB Comment

8 PPPR-ISO-GS1-003 Isometric Shipping Pump (PSV Line) GS 1 Minas 1~3 B B RE IFR Review Elnusa

Piping & Instrumentation Diagram Shipping Tank Area GS 1


9 PPPR-PID-GS1-001 1 of 1 0 0 - Review Elnusa
Minas Operation

Piping & Instrumentation Diagram Demolish Shipping Pump GS


10 PPPR-PID-GS1-001 1 of 1 A A IFR With Comment
1 Minas

Piping & Instrumentation Diagram Installation Shipping Pump GS


11 PPPR-PID-GS1-002 1 of 1 D D RE IFR Review Elnusa
1 Minas (Modification Phase 1)

Piping & Instrumentation Diagram Demolish Shipping Pump PSV


12 PPPR-PID-GS1-003 1 of 1 A A IFR Review Elnusa
Header GS 1 Minas

Piping & Instrumentation Diagram Installation Shipping Pump


13 PPPR-PID-GS1-004 1 of 1 A A IFR Review Elnusa
PSV Header GS 1 Minas

Demolish Plan (GS 1- Minas) GS Pitless Operation and


14 PPPR-DP-GS1-001 1~2 0 0 - Review Elnusa
Improvement

15 PPPR-LOTO-GS1-001 LOTO Piping Plan Shipping Pump GS 1 Minas Area 1 of 1 C C IFA Review Elnusa

16 PPPR-EE-GS1-001 LOTO Electrical & Instrumen GS - 1 Minas 1 of 1 1 1 - Review Elnusa

17 PPPR-SP-GS1-001 Modification Existing Skid Pump GS 1 Minas 1 of 1 1 0 AFC Signed 1 ASB Signed

GS 3 - MINAS

1 PPPR-EL-GS3-001 Equipment Layout Pump & Motor Shipping Pump GS 3 - Minas 1 of 1 B B RE IFR Review Elnusa

2 PPPR-LP-GS3-001 Lifting Plan Install Pump P-0203 GS 3 - Minas 1~2 C C RE IFR Review Elnusa

3 PPPR-LP-GS3-002 Lifting Plan Dismantle Pump P-0203 GS 3 - Minas 1~4 C C RE IFR Review Elnusa

4 PPPR-LP-GS3-003 Lifting Plan Dismantle Pump P-0201 GS 3 - Minas 1~4 A A IFR Review Elnusa

5 PPPR-LP-GS3-004 Lifting Plan Install Pump P-0201 GS 3 - Minas 1~2 A A IFR Review Elnusa

6 PPPR-RM-GS3-001 Road Mapping Pump & Motor Shipping Pump GS 3 - Minas 1 of 1 B B RE IFR Review Elnusa

7 PPPR-TMP-GS3-001 Traffic Management Plan Pump & Shipping Pump GS 3 - Minas 1 of 1 B B RE IFR Review Elnusa

Page 3 of 5
Update : 2 Mar 2023
IFR/IFA/IFC AS BUILT
LATEST
NO DOCUMENT NO. DOCUMENT TITTLE SHEET STATUS STATUS
REV REV STATUS REV STATUS
APPROVAL APPROVA:L

8 PPPR-ISO-GS3-001 Isometric Shipping Pump (Pump 1) GS 3 Minas 1~7 0 0 AFC Review Elnusa 1 ASB Comment

9 PPPR-ISO-GS3-002 Isometric Shipping Pump (Pump 2) GS 3 Minas 1~7 0 0 AFC Review Elnusa 1 ASB Comment

10 PPPR-ISO-GS3-003 Isometric Shipping Pump (PSV Line) GS 3 Minas 1~3 B B RE IFR Review Elnusa

11 PPPR-DP-GS3-001 Demolish Plan GS 3 Minas 1~2 0 0 - Review Elnusa

12 PPPR-PID-GS3-001 Piping & Instrumentation Diagram Demolish GS 3 Minas Area 1 of 1 C C RE IFA Review Elnusa

13 PPPR-PID-GS3-002 Piping & Instrument Diagram Installation GS 3 Minas Area 1 of 1 B B RE IFR Review Elnusa

Piping & Instrumentation Diagram Demolish Shipping Pump PSV


14 PPPR-PID-GS3-003 1 of 1 A A IFR Review Elnusa
Line GS 3 Minas

Piping & Instrumentation Diagram Installation Shipping Pump


15 PPPR-PID-GS3-004 1 of 1 A A IFR Review Elnusa
PSV Line GS 3 Minas

16 PPPR-LOTO-GS3-001 Loto Piping Plan Shipping Pump GS3 Minas Operation 1 of 1 C C RE IFA Review Elnusa

17 PPPR-SP-GS3-001 Modification Existing Skid Pump GS-3 Minas 1 of 1 0 0 AFC Signed 1 ASB Signed

GS 4 - MINAS

1 PPPR-EL-GS4-001 Equipment Layout Pump & Motor Shipping Pump GS 4 - Minas 1 of 1 0 0 - Review Elnusa

2 PPPR-LP-GS4-001 Lifting Plan Dismantle Shipping Pump & Motor GS 4 - Minas 1~4 C C - Review Elnusa

3 PPPR-LP-GS4-002 Lifting Plan Install Shipping Pump & Motor GS 4 - Minas 1~4 C C - Review Elnusa

4 PPPR-RM-GS4-001 Road Mapping Pump & Motor Shipping Pump GS 4 - Minas 1 of 1 0 0 - Review Elnusa

5 PPPR-TMP-GS4-001 Traffic Management Plan Pump & Shipping Pump GS 4 - Minas 1 of 1 0 0 - Review Elnusa

6 PPPR-ISO-GS4-001 Isometric Shipping Pump GS 4 Minas 1~7 0 0 AFC Review Elnusa 1 ASB Comment

7 PPPR-ISO-GS4-002 Isometric Shipping Pump (PSV Line) GS 4 Minas 1~3 A A IFR Review Elnusa

Piping & Instrumentation Diagram Shipping Tank Area GS 4


8 PPPR-PID-GS4-001 1 of 1 0 0 - Review Elnusa
Minas Operation

Piping & Instrumentation Diagram Shipping Tank Area GS 4


9 PPPR-PID-GS4-003 1 of 1 A A IFR Review Elnusa
(PSV Line)

Piping & Instrumentation Diagram Shipping Tank Area GS 4


10 PPPR-PID-GS4-004 1 of 1 A A IFR Review Elnusa
(PSV Line)

11 PPPR-DP-GS4-001 Demolish Plan GS 4 Minas 1~2 0 0 - Review Elnusa

12 PPPR-LOTO-GS4-001 LOTO Piping Plan Shipping Pump GS 4 Minas Area 1 of 1 0 0 - Approved

13 PPPR-SP-GS4-001 Modification Existing Skid Pump GS 4 Minas 1 of 1 0 0 AFC Signed 1 ASB Review Elnusa

GS 5 - MINAS

1 PPPR-EL-GS5-001 Equipment Lay Out GS-5 Minas 1 of 1 0 0 - Review Elnusa

2 PPPR-LP-GS5-001 Lifting Plan Dismantle Pump and Motor (Include Skid) P-0216 1~2 1 1 - Review Elnusa

3 PPPR-LP-GS5-002 Lifting Plan Dismantle Pump and Motor (Include Skid) P-0203 1~2 1 1 - Review Elnusa

Piping & Instrumentation Diagram Shipping Tank Area GS-5


4 PPPR-PID-GS5-001 1 of 1 2 2 RE IFA Review Elnusa
Minas Operation

5 PPPR-RM-GS5-001 Road Mapping GS-5 Minas 1 of 1 0 0 - Review Elnusa

6 PPPR-TMP-GS5-001 Traffic Management Plan GS-5 Minas 1 of 1 0 0 - Review Elnusa

7 PPPR-LOTO-GS5-001 Loto Piping Plan Shipping Pump GS5 Minas Operation 1 of 1 0 0 - Approved

8 PPPR-DP-GS5-001 Demolish Plan (GS - 5) Pitless Operation and Improvement 1~2 0 0 - Review Elnusa

GS 6 - MINAS

1 PPPR-EL-GS6-001 Equipment Lay Out GS-6 Minas 1 of 1 0 0 - Review Elnusa

Page 4 of 5
Update : 2 Mar 2023
IFR/IFA/IFC AS BUILT
LATEST
NO DOCUMENT NO. DOCUMENT TITTLE SHEET STATUS STATUS
REV REV STATUS REV STATUS
APPROVAL APPROVA:L

2 PPPR-LP-GS6-001 Drawing Lifting Plan Dismantle Pump And Motor GS 6 Minas 1~4 1 1 - Review Elnusa

3 PPPR-TMP-GS6-001 Traffic Management Plan GS-6 Minas 1 of 1 0 0 - Review Elnusa

4 PPPR-DP-GS6-001 Demolish Plan GS 6 Minas 1~2 0 0 - Review Elnusa

Piping & Instrumentation Diagram Shipping Tank Area GS-6


5 PPPR-PID-GS6-001 1 of 1 1 1 IFA Review Elnusa
Minas Operation

6 PPPR-LOTO-GS6-001 Loto Piping Plan Shipping Pump GS6 Minas Operation 1 of 1 0 0 - Review Elnusa

7 PPPR-RM-GS6-001 Road Mapping GS-6 Minas 1 of 1 0 0 - Review Elnusa

RANTAU BAIS

1 PPPR-PIP-ISO-RB-001 Piping Isometric Drawing Pump Rantau Bais GS 1~3 3 3 - Review Elnusa

2 PPPR-DP-RB-001 Demolish Plan Rantau Bais GS 1~2 0 0 - Review Elnusa

Equipment Lay Out Pump & Motor Shipping Pump Rantau Bais
3 PPPR-EL-RB-001 1 of 1 0 0 - Review Elnusa
GS

4 PPPR-LP-RB-001 Lifting Plan Dismantle Pump & Motor Rantau Bais GS 1~4 0 0 - Review Elnusa

5 PPPR-LP-RB-002 Lifting Plan Install Pump & Motor Rantau Bais GS 1~2 0 0 - Review Elnusa

6 PPPR-RM-RB-001 Road Mapping Pump & Motor Shipping Pump Rantau Bais GS 1 of 1 0 0 - Review Elnusa

7 PPPR-SP-RB-001 Modification Existing Skid Pump Rantau Bais GS 1 of 1 1 1 - Review Elnusa

Piping & Instrumentation Diagram Shipping Tank & Pump


8 PPPR-PID-RB-001 1 of 1 0 0 - Approved
Rantau Bais GS

9 PPPR-LOTO-RB-001 Loto Piping Plan Shipping Pump Rantau Bais 1 of 1 0 0 - Approved

10 PPPR-TMP-RB-001 Traffic Management Plan Rantau Bais GS 1 of 1 0 0 - With Comment

SINTONG GS

1 PPPR-EL-SGS-001 Equipment Layout Sintong GS 1 of 1 1 1 - Approved

2 PPPR-LP-SGS-001 Lifting Plan Dismantle Pump and Motor Sintong GS 1~2 1 1 - Approved

3 PPPR-LP-SGS-002 Lifting Plan Install Pump and Motor Sintong GS 1~2 0 0 - With Comment

4 PPPR-RM-SGS-001 Road Mapping Sintong GS 1 OF 1 1 1 - Approved

5 PPPR-SP-SGS-001 Modification Existing Skid Pump 1 & 2 Sintong GS 1~2 1 1 - Review Elnusa

6 PPPR-DP-DS-001 Demolish Plan Sintong GS 1~2 1 1 - Approved

Piping & Instrumentation Diagram Shipping Tank & Shipping


7 PPPR-PID-SNTG-001 1 OF 1 1 1 - Approved
Pump Sintong GS

8 PPPR-LOTO-SNTG-001 LOTO Piping Plan Shipping Pump Sintong 1 OF 1 1 1 - Approved

9 PPPR-TMP-SGS-001 Traffic Management Plan Sintong GS 1 of 1 1 1 - Approved

Page 5 of 5