inion. p of electricity coridors. Al Electcal cables (L,
co Atte HWE ae Gime aloe electrical coco
14, Electricity corridors ave not shared, and allocated land forthe corridors i exclusively
reserved fr electrical lites.
15. All MV cables shall be diverted by 30-240mm2 + Piot and LV cables by 4C-300mmn2
‘except for existing MV cables with 30-300mm2 XLPE shall be diverted with 3C-
300mm? + Pilot
16.1 the responsi of the Consultant to ensure that there are no clashes with
RAIL metvo statons (i applicable) and also suffcont clearances are maintained
{rom the roads to the dstibution substations. Any impacts must be highlighted wth
‘revised proposal and brought to the attention of KAHRAMAA Engineer for review and
‘approval. All costs wil stil be under your roads project and budget.
17, Exiting LV, MY & EHVIHV dead cables shal be removed and returned to KM stores
within your project. Ashahal Contractor must expose the doad cables fully and get the
‘confmation from KM Maintenance for individual dead cables before outing and
‘omoving these dead cables.
18, Ducts (ENG, EN4, EN2. Type H, HOD type) shall bo ae per KM Standard. All ducts
‘must be extended atleast 00mm beyond the road ee.
19, Consutant_must_submt_copies of drawings (after necessary revisions and