SOLO LLENAR LOS CUADROS CON SOMBREADO AZUL

FORMATO DE METRADOS DE ALCANTARILLAS TMC


DATOS DE UBICACION Ce=
KILOMETRAJE 9+075.65 KM. 9+075.65 OK 9 075.65 Cs= BUSCAR HOJAS
DIAMETRO 60" 1.5 Ø - 60'' 36" RESUMEN!A1
LONGITUD 17.85 m 48" SUSTENTO!A1
N° CUERPOS 22 Und 60" CAJATOMA!A1
NOMBRE
ALCANTARILLA TMC. Ø - 60'' KM. 9+075.65 cabezal!A1
ANG. DE ESVIAJE 86° ang. Aleros 02°
ENTRADA CABEZAL CABEZAL - 1.50 m 90° < eje alc parapeto (ent.) CABEZAL B A
SALIDA CABEZAL CABEZAL - 1.50 m 90° < eje alc parapeto (salida) CAJA B A
MURO B

EXCAVACION ala Ainicio Afinal lon


PROT. ENT. ENT. CUERPO. SAL. PROT. SAL. 0.9 0.56 0.99 2.55
AREA 0.00 1.23 22.11 1.93 0.18 1.2 1.77 0.7 2.55
ANCHO 0.00 3.55 2.90 3.55 4.73 1.5 1.72 0.7 3.11

RELLENO
prisma lat FIN ALA PROT. ENT. ENT. CUERPO. SAL. PROT. SAL. FIN ALA prisma lat
area (m2) 0.70 0.00 1.56 36.42 1.53 0.00 0.70
LON (m) 0 0
ANCHO (m) 0 3.11 0.00 2.90 2.90 2.90 4.73 3.11 0
ALTURA (m) 0 0
AREA INNIO ALA 1.72 AREA INNIO ALA 1.72
DEDUCTIVOS
ENT. TMC SAL.
AREA 0.00 12.66 0.00
ANCHO 0.00 0.00

EMBOQUILLADOS
0.90 1.20 1.50
ENBOQUILLADO ENTRADA CAJA A 2.60 2.90 3.20
L= 4.37 ANCHO PROMEDIO 4.50 B 1.5 CABEZAL B 4.90 6.01 7.01
EMBOQUILLADO SALIDA
L= 4.42 ANCHO PROMEDIO 4.50 B 1.5

ELIMINACION DE ALC. EXIST.


Ce= 6.27 COORDENADAS DE ORIGEN DE CUADRO
E N COTA N=
TUBERIA D=4" 734614.807 9284116.368 0.75 734614.807,93DPOLY 734614.807,9284116.368,0
E=
L= 735871.036 9282345.760 0.75 735871.036,9282345.76,0.75

CUADRO PARA DIBUJAR CABEZALES


CABEZAL ENTRADA Ø - 60'' CABEZAL SALIDA Ø - 60'' CAJATOMA Ø - 60''
E N DIBUJA E N DIBUJA E N DIBUJA
PLANTA 260905.116 9328152.616 #REF! PLANTA 735871.036 9282345.760 PL 735871.036,9282346.615 735873.236,9282348.66653319 735873.236, PLANTA 734614.807 9284116.368 #NAME?
#REF! PL 735873.236,9282342.54578884 735873.053161575,9282342.37528925 #NAME?

#REF! PL 735873.053161575,9282342.37528925 735872.870323149,9282342.20 #NAME?

ELEVACION 260905.116 9328152.616 #REF! ELEVACION 735881.584 9282345.760 PL 735878.028789658,9282345.76 735878.028789658,9282346.76 73588 ELEVACION #NAME?

#REF! PL 735880.729,9282346.76 735880.729,9282348.78 735882.439,9282348 #NAME?

#REF! PL 735878.369788838,9282346.76 735878.369788838,9282347.41 735880 #NAME?

#REF! PL 735878.199289248,9282346.76 735878.199289248,9282347.41 73588 #NAME?

#REF! PL 735878.199289248,9282347.41 735878.369788838,9282347.41 73587 #NAME?

#REF! PL 735884.490533189,9282347.41 735884.673371615,9282347.41 73588 #NAME?

#REF! PL 735878.028789658,9282346.51 735884.85621004,9282346.51 #NAME?

#REF! C 735881.584,9282347.57 D 1.52

#REF!

PERFIL 0.000 0.000 PL -0.65,-0.25 -0.65,-0.05 -0.55,-0.05 -0.5437,0 0,0 0,-0.05 1.56,-0.05 1.56,-0.55 1.31,- PERFIL 735887.382 9282345.760 PL 735886.882,9282345.46 735886.882,9282345.71 735887.132,9282345. PERFIL
PL -0.55,-0.05 -0.3,1.85 -0.3,2.15 0,2.15 0,-0.05 PL 735887.382,9282347.28 735887.132,9282347.28 735887.132,9282347

PL 0,1.85 1.56,0.95 1.56,-0.05 1.56,-0.55 1.56,-0.55 PL 735887.382,9282347.73 735889.582,9282346.36 735889.582,9282345

origen de cuadro N= 9292166.6217


E= 174602.5404

Item DESCRIPCION UND METRADO Item


-TEXT J BL 174603.4404,9292166.3817 0 600 -TEXT J BL 174604.5904,9292166.3817 0 OBRAS COMPLEMENT 600
-TEXT J BL 174603.4404,9292166.0317 0 604.B -TEXT J BL 174604.5904,9292166.0317 0 DEMOLICIÓN DE -TEXT J bl 174613.8904,9292166.0317 0 m3 604.B
-TEXT J BL 174603.4404,9292165.6817 0 500 -TEXT J BL 174604.5904,9292165.6817 0 DRENAJE -TEXT J R 174615.8904,9292165.6817 0 139.02 500
-TEXT J BL 174603.4404,9292165.3317 0 501 -TEXT J BL 174604.5904,9292165.3317 0 EXCAVACIÓN PARA -TEXT J bl 174613.8904,9292165.3317 0 m3 #NAME? 501.00
-TEXT J BL 174603.4404,9292164.9817 0 602.B -TEXT J BL 174604.5904,9292164.9817 0 Eliminacion Alcantarillas-TEXT J bl 174613.8904,9292164.9817 0 m #NAME? 602.B
-TEXT J BL 174603.4404,9292164.6317 0 502 -TEXT J BL 174604.5904,9292164.6317 0 RELLENO PARA EST -TEXT J bl 174613.8904,9292164.6317 0 m3 #NAME? 502.00
-TEXT J BL 174603.4404,9292164.2817 0 503.A5 -TEXT J BL 174604.5904,9292164.2817 0 CONCRETO ESTRUCTU-TEXT J bl 174613.8904,9292164.2817 0 m3 503.A5
-TEXT J BL 174603.4404,9292163.9317 0 503.A9 -TEXT J BL 174604.5904,9292163.9317 0 CONCRETO CLASE H (f-TEXT J bl 174613.8904,9292163.9317 0 m3 -TEXT J R 174615.8904,9292163.9317 0 117.65 503.A9
-TEXT J BL 174603.4404,9292163.5817 0 504.B -TEXT J BL 174604.5904,9292163.5817 0 ENCOFRADO Y DES -TEXT J bl 174613.8904,9292163.5817 0 m2 -TEXT J R 174615.8904,9292163.5817 0 14.28 504.B
-TEXT J BL 174603.4404,9292163.2317 0 507.A1 -TEXT J BL 174604.5904,9292163.2317 0 Tuberia Metalica Corrug-TEXT J bl 174613.8904,9292163.2317 0 m 507.A1
-TEXT J BL 174603.4404,9292162.8817 0 507.A2 -TEXT J BL 174604.5904,9292162.8817 0 Tuberia Metalica Corrug-TEXT J bl 174613.8904,9292162.8817 0 m -TEXT J R 174615.8904,9292162.8817 0 42.06 507.A2
-TEXT J BL 174603.4404,9292162.5317 0 507.A3 -TEXT J BL 174604.5904,9292162.5317 0 Tuberia Metalica Corrug-TEXT J bl 174613.8904,9292162.5317 0 m -TEXT J R 174615.8904,9292162.5317 0 1 808.09 507.A3
-TEXT J BL 174603.4404,9292162.1817 0 516.B -TEXT J BL 174604.5904,9292162.1817 0 EMBOQUILLADO DE PI-TEXT J bl 174613.8904,9292162.1817 0 m3 -TEXT J R 174615.8904,9292162.1817 0 113.55 516.B

origen de cuadro N= 9292154.208

E= 174356.372

-TEXT J BL 174356.372,9292153.768 0 SUSTENTO METRADO CABEZAL TIPO TMC Ø 1.50m

-TEXT J BL 174356.372,9292153.568 0 ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

-TEXT J BL 174356.372,9292153.368 0 06.01.05.04 Concreto clase D (f'c=210 kg/cm²)

-TEXT J BL 174356.372,9292153.168 0 Zapata = 1.00 x 1.00 x ( ( 9.10 x 0.50 ) - ( 4.50 x 0.30 ) ) = 3.20 m

-TEXT J BL 174356.372,9292152.968 0 Pantalla = 1.00 x 1.00 x ( 1.90 x ( ( 0.55 + 0.30 )/2 ) x 1.90 ) - ( ¶ x

-TEXT J BL 174356.372,9292152.768 0 Parapeto = 1.00 x 1.00 x ( 1.90 x 0.30 x 0.30)

-TEXT J BL 174356.372,9292152.56800001 0 Alero 1 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.20 )/2 + 1.90 x ( 0.35 + 0.20 )/

-TEXT J BL 174356.372,9292152.36800001 0 Alero 2 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.20 )/2 + 1.90 x ( 0.35 + 0.20 )/

-TEXT J BL 174356.372,9292152.16800001 0 Total = 5.95 m3

-TEXT J BL 174356.372,9292151.96800001 0 06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm

-TEXT J BL 174356.372,9292151.76800001 0 Solado = 1.00 x 1.00 x ( 1.56 x ( 4.03 + 1.74 )/2 ) x 0.10 = 0.45 m3

-TEXT J BL 174356.372,9292151.56800001 0 Total = 0.45 m3

-TEXT J BL 174356.372,9292151.36800001 0 06.01.05.01 Encofrado y desencofrado

-TEXT J BL 174356.372,9292151.16800001 0 Zapata = 1.00 x 1.00 x ( 13.31 x 0.50 ) = 6.65 m2

-TEXT J BL 174356.372,9292150.96800001 0 Pantalla = 1.00 x 2.00 x ( 1.90 x 1.90 - ( ¶ x 1.50^2 )/ 4 ) ) =

-TEXT J BL 174356.372,9292150.76800001 0 Parapeto = 1.00 x 1.00 x ( 2 x (1.90 + 0.30 ) x 0.30 ) = 1.32 m2

-TEXT J BL 174356.372,9292150.56800001 0 Alero 1 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.29 + 2.51 )/2 ) + 1.00 x ( 0

-TEXT J BL 174356.372,9292150.36800001 0 Alero 2 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.13 + 2.36 )/2 ) + 1.00 x ( 0

-TEXT J BL 174356.372,9292150.16800001 0 Total = 22.08 m2


COORDENADAS DE ORIGEN DE CUADRO
9292166.6217
174602.5404

DESCRIPCION UND METRADO met. Cont.


OBRAS COMPLEMENTARIAS
DEMOLICIÓN DE ESTRUCTURAS DE CONCRETO, MAMPOSTERÍA Y OTROS m3 9.49 9.49
DRENAJE
EXCAVACIÓN PARA ESTRUCTURAS m3 71.04 146.48
Eliminacion Alcantarillas Existentes m 45.56 0.00
RELLENO PARA ESTRUCTURAS m3 166.80 49.22
CONCRETO ESTRUCTURAL CLASE E (f'c=175 Kg/cm2) m3 84.12 6.80
CONCRETO CLASE H (f'c= 100 Kg/cm2) m3 28.56 0.26
ENCOFRADO Y DESENCOFRADO m2 117.65 31.46
Tuberia Metalica Corrugada Circular Ø=36" m 13.20
Tuberia Metalica Corrugada Circular Ø=48" m 42.06
Tuberia Metalica Corrugada Circular Ø=60" m 1808.09
EMBOQUILLADO DE PIEDRA (f'c=175 Kg/cm2 ) +70%PM m3 4.69

INSERTAR SUSTENTO METRADO

SUSTENTO METRADO CABEZAL TIPO TMC Ø 1.50m

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

06.01.05.04 Concreto clase D (f'c=210 kg/cm²)

Zapata = 1.00 x 1.00 x ( ( 9.10 x 0.50 ) - ( 4.50 x 0.30 ) ) = 3.20 m3

Pantalla = 1.00 x 1.00 x ( 1.90 x ( ( 0.55 + 0.30 )/2 ) x 1.90 ) - ( ¶ x 1.50^2 /4) ) x 0.43 ) = 0.78 m3

Parapeto = 1.00 x 1.00 x ( 1.90 x 0.30 x 0.30)

Alero 1 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.20 )/2 + 1.90 x ( 0.35 + 0.20 )/2 ) x ( 2.29 + 2.51 )/2 )) = 0.93 m3

Alero 2 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.20 )/2 + 1.90 x ( 0.35 + 0.20 )/2 ) x ( 2.13 + 2.36 )/2 )) = 0.87 m3

Total = 5.95 m3

06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm

Solado = 1.00 x 1.00 x ( 1.56 x ( 4.03 + 1.74 )/2 ) x 0.10 = 0.45 m3

Total = 0.45 m3

06.01.05.01 Encofrado y desencofrado

Zapata = 1.00 x 1.00 x ( 13.31 x 0.50 ) = 6.65 m2

Pantalla = 1.00 x 2.00 x ( 1.90 x 1.90 - ( ¶ x 1.50^2 )/ 4 ) ) = 0.13 m2

Parapeto = 1.00 x 1.00 x ( 2 x (1.90 + 0.30 ) x 0.30 ) = 1.32 m2

Alero 1 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.29 + 2.51 )/2 ) + 1.00 x ( 0.30 + 0.20 )/2 = 7.21 m2

Alero 2 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.13 + 2.36 )/2 ) + 1.00 x ( 0.30 + 0.20 )/2 = 6.76 m2

Total = 22.08 m2
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS,
PROVINCIA DE RIOJA - SAN MARTIN

TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

ALCANTARILLA TMC. ABOVEDADA


3.53X2.29 m KM. 8+037.22
OBRAS DE ARTE - ALCANTARILLAS TMC
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO
DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

RESUMEN DE METRADOS
REPLANTEO

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22


.

METRADO METRADO MAYOR MENOR


Item DESCRIPCION UND
REPLANTEO CONTRACTUAL METRADO METRADO

06 Drenaje
06.01 Alcantarillas
06.01.01 Trabajos preliminares
06.01.01.01 Limpieza de terreno manual m² 139.02 88.00 51.02
06.01.01.02 Trazo, niveles y replanteo en alcantarillas m² 139.02 88.00 51.02
06.01.01.03 Demolición de estructura de concreto m³ 9.49 9.49
06.01.01.04 Extraccion y eliminación de alcantarillas de TMC m
06.01.02 Movimiento de tierras
06.01.02.01 Excavación para estructura a máquina m³ 71.04 84.90 13.86
06.01.02.02 Excavación para estructuras a mano m³ 45.56 20.15 25.41
06.01.02.03 Eliminación de material excedente con equipo hasta 2 km m³ 132.73 105.05 27.68
06.01.02.04 Refine, nivelacion y compactacion con maquinaria liviana m² 139.23 134.29 4.94
06.01.02.05 Relleno compactado con hormigon zarandeado m³ 12.39 10.95 1.44
06.01.02.06 Relleno compactado con material de prestamo m³ 166.80 7.10 159.70
06.01.04 Alcantarillas de tubería metálica corrugado
06.01.04.04 Alcantarilla TMC Abobedada m 10.53 10.00 0.53
06.01.05 Cabezales y cajas colectoras de alcantarillas
06.01.05.01 Encofrado y desencofrado m² 117.65 117.65
06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm m² 14.28 14.28
06.01.05.03 Mampostería e = 0.20m; concreto f'c= 175 kg/cm² + 30% pm m² Alcan
06.01.05.04 Concreto clase D (f'c=210 kg/cm²) m³ 42.06 42.06
06.01.05.05 Acero de refuerzo fy=4200 kg/cm² kg 1808.09 1808.09
06.01.05.06 Curado de concreto con aditivo tipo membrana m² 113.55 113.55
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

SUSTENTO DE METRADOS
ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22 Apr-23
.
ENTRADA SALIDA
ENCAUZ./PROTEC. SECCION ENCAUZ./PROTEC.
Item DESCRIPCION UND CABEZAL - 1.50 CABEZAL - 1.50
ENTRADA CUERPO SALIDA
m m
A A
Alcantarillas
06.01.01 Trabajos preliminares
06.01.01.01 Limpieza de terreno manual m2 0.00 33.97 74.27 13.62 17.16
longitud m 3.86 8.44 3.94 1.95
ancho m 8.80 8.80 8.80 8.80 8.80
areas parciales por elementos m2 0.00 33.97 74.27 34.67 17.16

06.01.01.02 Trazo, niveles y replanteo en alcantarillas m2


areas parciales por elementos

06.01.01.03 Demolición de estructura de concreto m3 0.00 9.49 0.00


Base existente m
Altura existente m
Espesor existente m
Ancho parcial Muro m 4.92
Area cad m2 1.93
Volumen parcial m3 9.49

06.01.01.04 Extraccion y eliminación de alcantarillas de TMC m 0.00


longitud de tmc existente m

06.01.02 Movimiento de tierras


06.01.02.01 Excavación para estructura a máquina m3 0.00 71.04 0.00

Area de excavación m2 14.41


Ancho de excavación m 4.93
Volumen parcial de excavacion (V1) m3 71.04

06.01.02.02 Excavación para estructuras a mano 2.21 43.35

Area de excavación m2 0.26 5.10 1.95


Ancho de excavación/Altura m 8.50 8.50 8.27
Volumen parcial de excavacion (V1) m3 2.21 43.35 16.13

06.01.02.03 Eliminación de material excedente con equipo hasta 2 km m3 2.21 71.04 59.48 0.00
Volumen proveniente de la excavación a maquina m3 71.04 0.00
Volumen proveniente de la excavación manual m3 2.21 59.48

06.01.02.04 Refine, nivelacion y compactacion con maquinaria liviana m2 39.34 60.53 39.36
areas parciales (sustento CAD) m2 39.34 60.53 39.36

06.01.02.05 Relleno compactado con hormigon zarandeado m3 12.39


longitud de la Cama de apoyo m 8.38
ancho de Cama de apoyo m 4.93
espesor de Cama de apoyo m 0.30
Volumen parcial m3 12.39

06.01.02.06 Relleno compactado con material de prestamo m3 32.49 90.37 43.95

Area de relleno m2 1.90 18.33 4.13


Ancho de relleno m 5.14 4.93 5.14
Volumen de relleno m3 9.77 90.37 21.23

Area de relleno inicio de ala m2


Area de relleno fin de ala m2 8.00 8.00
Altura prom de ala m 2.84 2.84
Volumen de relleno ala (02 alas) m3 22.72 22.72

Volumen parcial de relleno (V1) m3 32.49 90.37 43.95


ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

SUSTENTO DE METRADOS
ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22 Apr-23
.
ENTRADA SALIDA
ENCAUZ./PROTEC. SECCION ENCAUZ./PROTEC.
Item DESCRIPCION UND CABEZAL - 1.50 CABEZAL - 1.50
ENTRADA CUERPO SALIDA
m m
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

SUSTENTO DE METRADOS
ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22 Apr-23
.
ENTRADA SALIDA
ENCAUZ./PROTEC. SECCION ENCAUZ./PROTEC.
Item DESCRIPCION UND CABEZAL - 1.50 CABEZAL - 1.50
ENTRADA CUERPO SALIDA
m m

06.01.05.04 Concreto clase D (f'c=210 kg/cm²) m3 42.06 42.06


Volumen parcial m3 42.06 42.06

06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm m3 14.28 14.28


Volumen parcial m3 14.28 14.28

06.01.05.05 Acero de refuerzo fy=4200 kg/cm² kg 904.04 904.04


Volumen parcial kg 904.04 904.04

06.01.05.01 Encofrado y desencofrado m2 58.82 58.82


Area Parcial m2 58.82 58.82

06.01.05.06 Curado de concreto con aditivo tipo membrana m2 56.78 56.78


Area Parcial m2 56.78 56.78

06.01.04.04 Alcantarilla TMC Abobedada m 10.53


Longitud m 10.53

06.01.05.03 Mampostería e = 0.20m; concreto f'c= 175 kg/cm² + 30% pm m2 0.00 0.00
Ancho Promedio m
Longitud m
Area parcial m2 0.00 0.00
A - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN

TENTO DE METRADOS
Apr-23

TOTAL

139.02

139.02

9.49

71.04

45.56

132.73

139.23

12.39

166.80
A - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN

TENTO DE METRADOS
Apr-23

TOTAL
A - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN

TENTO DE METRADOS
Apr-23

TOTAL

84.12

28.56

1808.09

117.65

113.55

10.53
ENTIDAD : GOBIERNO REGIONAL DE AMAZONAS
OBRA : "MEJORAMIENTO DE LAS VÍAS DEPARTAMENTALES: RUTA AM-106, TRAMO: EMP. PE-5N (BALZAPATA) – JUMBILLA –
ASUNCIÓN – EMP. PE-8B (MOLINOPAMPA); RUTA AM-110, TRAMO: EMP. PE-8B (CHACHAPOYAS) – LEVANTO – EMP. PE-8B
(TINGO); RUTA AM-111, TRAMO: EMP. PE-8B (TINGO) – LONGUITA – MARÍA - KUELAP, PROVINCIAS DE CHACHAPOYAS –
BONGARÁ Y LUYA – AMAZONAS".

TRAMO : TINGO - KUELAP - AM 111

SUSTENTO METRADOS CAJATOMA Ø - 60''

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

503.A5 CONCRETO ESTRUCTURAL CLASE E (f'c = 175 kg/cm2)


Zapata (base) = 1.00 x 1.00 x ( 2.20 x 2.45 x 0.30 )
Uña (base) = 1.00 x 1.00 x ( 0.50 x 0.30 x ( 2.00 x( 2.45 + 1.20 )) )
Pared cara cunetas = 2.00 x 1.00 x ( 1.20 x 2.10 x 0.30 - ( ( 1.20 x 0.40 )/2 ) x 0.30))
Parapeto = 1.00 x 1.00 x ( 2.45 x 0.30 x 0.30 )
Pantalla cara Interior = 1.00 x 1.00 x ( 2.45 x 2.10 x 0.50 - ( ( ¶x1.50^2 )/4 ) ) x 0.40 )

Pantalla cara Posterior = 1.00 x 1.00 x ( 2.45 x 2.10 x ( 0.30 + 0.50 )/2 - ( 0.90 + 1.20 )/2 x 0.30 x 0.30)

Total = 7.61 m3

503.A8 CONCRETO CLASE H (f'c = 100 kg/cm2)


Zapata (Solado) = 1.00 x 1.00 x ( 1.20 x 1.55 x 0.100 )

Total = 0.19 m3

504.B ENCOFRADO Y DESENCOFRADO


Zapata (base) = 1.00 x 1.00 x ( 2.00 x ( 2.20 + 2.45 ) x 0.60 )
Interior de Cajatoma = 1.00 x 1.00 x ( 2.00 x ( 1.85 + 1.20 ) x 2.10 )
Deductivo Cuneta = 1.00 x 2.00 x ( ( 1.20 x 0.40 )/2 )
Deductivo TMC = 1.00 x 1.00 x ( ¶ x 1.50^2 )/4 )
Deductivo Canal Post. = 1.00 x 1.00 x (( 0.90 + 1.20 )/2 x 0.30)
Interior de Cajatoma = 1.00 x 1.00 x ( 2.00 x ( 2.20 + 2.45 ) x 2.10 )
Deductivo Cuneta = 1.00 x 2.00 x ( ( 1.20 x 0.40 )/2 )
Deductivo TMC = 1.00 x 1.00 x ( ¶ x 1.50^2 )/4 )
Deductivo Canal Post. = 1.00 x 1.00 x (( 0.90 + 1.20 )/2 x 0.30)
Parapeto = 1.00 x 1.00 x ( 2.00 x ( 0.50 + 2.45 ) x 0.30 )
Total = 31.76 m2

TRAMO: BALZAPATA - MOLINOPAMPA - AM 111


ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS,
PROVINCIA DE RIOJA - SAN MARTIN

TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

AREA: OBRAS DE ARTE Y DRENAJE


SUSTENTO METRADO CABEZAL TIPO TMC Ø 1.50m

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

06.01.05.04 Concreto clase D (f'c=210 kg/cm²)


Zapata = 1.00 x 1.00 x ( ( 9.10 x 0.50 ) - ( 4.50 x 0.30 ) ) = 3.20 m3

Pantalla = 1.00 x 1.00 x ( 1.90 x ( ( 0.55 + 0.30 )/2 ) x 1.90 ) - ( ¶ x 1.50^2 /4) ) x 0.43 ) = 0.78 m3
Parapeto = 1.00 x 1.00 x ( 1.90 x 0.30 x 0.30)
Alero 1 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.20 )/2 + 1.90 x ( 0.35 + 0.20 )/2 ) x ( 2.29 + 2.51 )/2 )) = 0.93 m3

Alero 2 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.20 )/2 + 1.90 x ( 0.35 + 0.20 )/2 ) x ( 2.13 + 2.36 )/2 )) = 0.87 m3

Total = 5.95 m3

06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm


Solado = 1.00 x 1.00 x ( 1.56 x ( 4.03 + 1.74 )/2 ) x 0.10 = 0.45 m3

Total = 0.45 m3

06.01.05.01 Encofrado y desencofrado


Zapata = 1.00 x 1.00 x ( 13.31 x 0.50 ) = 6.65 m2
Pantalla = 1.00 x 2.00 x ( 1.90 x 1.90 - ( ¶ x 1.50^2 )/ 4 ) ) = 0.13 m2
Parapeto = 1.00 x 1.00 x ( 2 x (1.90 + 0.30 ) x 0.30 ) = 1.32 m2
Alero 1 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.29 + 2.51 )/2 ) + 1.00 x ( 0.30 + 0.20 )/2 = 7.21 m2

Alero 2 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.13 + 2.36 )/2 ) + 1.00 x ( 0.30 + 0.20 )/2 = 6.76 m2

Total = 22.08 m2

06.01.05.05 Acero de refuerzo fy=4200 kg/cm²

Cant. Long. Long. Total


Marca Tip. Ø s Cant. N° veces a b c d e t. Kg/m
total parcial total (Kg)

CA1 A 1/2" @.250 5.00 2.00 10.00 .15 3.67 .15 3.97 39.70 1.00 39.70
A 1/2" @.250 1.00 2.00 2.00 .15 5.18 .15 5.48 10.95 1.00 10.95
CA2 A 1/2" @.250 8.00 2.00 16.00 .15 .73 .15 1.03 16.48 1.00 16.48
A 1/2" @.250 9.00 2.00 18.00 .15 1.46 .15 1.76 31.68 1.00 31.68
A 1/2" @.250 7.00 2.00 14.00 .15 .73 .15 1.03 14.42 1.00 14.42
CA3 1/2" 2.00 1.00 2.00 .40 7.08 .40 .35 .35 8.58 17.15 1.00 17.15
CA4 1/2" 2.00 1.00 2.00 .35 4.93 .35 5.63 11.26 1.00 11.26
V1 K 3/8" @.200 31.00 1.00 31.00 .40 .20 .20 .40 .30 1.50 46.50 .56 26.04
V2 A 1/2" 12.00 1.00 12.00 .45 5.03 .45 5.93 71.18 1.00 71.18
A1 F 3/8" @.250 10.00 2.00 20.00 .15 1.69 .20 2.04 40.80 .56 22.85
F 3/8" @.250 9.00 2.00 18.00 .15 1.69 .20 2.04 36.72 .56 20.56
A2 F 1/2" @.250 10.00 2.00 20.00 .15 1.69 .20 2.04 40.80 1.00 40.80
F 1/2" @.250 9.00 2.00 18.00 .15 1.69 .20 2.04 36.72 1.00 36.72
A3 A 3/8" @.200 5.00 2.00 10.00 .15 2.24 .20 2.59 25.87 .56 14.49
A 3/8" @.200 5.00 2.00 10.00 .15 1.09 .20 1.44 14.44 .56 8.08
A 3/8" @.200 5.00 2.00 10.00 .15 2.08 .20 2.43 24.33 .56 13.62
A 3/8" @.200 5.00 2.00 10.00 .15 1.02 .20 1.37 13.67 .56 7.65
A4 A 1/2" 2.00 1.00 2.00 .30 2.41 .20 2.91 5.82 1.00 5.82
A 1/2" 2.00 1.00 2.00 .30 2.27 .20 2.77 5.53 1.00 5.53
M1 A 3/8" @.200 9.00 2.00 18.00 .15 .30 .15 .60 10.73 .56 6.01
A 3/8" @.200 2.00 2.00 4.00 .15 2.05 .20 2.40 9.60 .56 5.38
M2 A 3/8" @.200 3.00 2.00 6.00 .20 1.80 .20 2.20 13.22 .56 7.40
A 3/8" @.200 9.00 4.00 36.00 .20 .48 .15 .83 29.73 .56 16.65
M3 M 1/2" 2.00 1.00 2.00 R= 1.50 .50 9.95 19.90 1.00 19.90

615.A ACERO DE REFUERZO (kg) DELTALLES DE DOBLEZ DE REFUERZOS 470.34


Ø Parcial (Kg) b a
3/8" 148.74 a
1/2" 321.59 CROQUIS b c b a c a c
5/8" 0.00 a
3/4" 0.00 c b

TOTAL 470.34 kg TIPO A B F M K

AREA: OBRAS DE ARTE Y DRENAJE


ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)
ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

06.01.05 Cabezales y cajas colectoras de alcantarillas


06.01.05.01 Encofrado y desencofrado 117.65 m²

Cabezal de alcantarilla de TMC abovedada de 3.53 x 2.29


Descripción Número Largo Ancho Altura Total (m²)
Caja colectora 58.82
Muro central 2.00 4.42 3.09 27.28
Vacio de la tuberia -2.00 Area cad= 6.30 -12.60
Aleros 2.00 3.22 2.34 15.07
2.00 2.85 2.34 13.34
2.00 0.35 1.59 1.11
Uña 1.00 Perimetro Cad = 20.91 0.50 10.46
1.00 Perimetro Cad = 13.88 0.30 4.16

06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm 14.28 m²

Solado de alcantarilla abovedada de 3.53x2.29


Descripción Número Largo Ancho Alto Área Total
Cabezal 7.14
1.00 Area=((3.76+6.30) x 1.42)/2= 7.14 7.14

Solado
1.42

3.76

6.30
e=0.10m SOLADO

1.42

06.01.05.04 Concreto clase D (f'c=210 kg/cm²) 42.06 m³

Cabezal de alcantarilla de TMC abovedada de 3.53 x 2.29

.30 .50
.15

3.52
1.50

5.09
4.80
3.59
2.29

4.51
1.59
.50 .30.30

.30

4.03
.20
.50

.50
.10
.20
1.42 .30

1.40 1.42 .40


.40

7.83

4.03
1.50

AREA CAD = 15.84m²


3.59

2.29
1.59

3.53
.20
.50

.10
.30

.48 1.90 4.03 1.90 .48


8.80

A.CAD = 1.73m² A.CAD = 1.41m² A.CAD = 1.11m²


ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

A.CAD = 1.40m²
A.CAD = 2.13m²
A.CAD = 1.73m² A.CAD = 1.41m² A.CAD = 1.11m²

A.CAD = 3.53m²

Descripción Número Largo Ancho Altura Total

Cabezal 21.03

Losa de cabezal 1 5.03 1.42 0.2 1.43

Muro central 1 3.53 2.13 3.14 8.89

1 2.13 0.15 0.32

Vacio de la tuberia -1 Area Cad= 6.30 0.50 -4.10

Aleros 2 1.73 1.41 1.44 4.51

2 1.41 1.11 0.75 1.89

2 1.11 0.08 0.17

Uña de losa de cimentacio 1 Area Cad= 15.84 0.50 7.92

06.01.05 Cabezales y cajas colectoras de alcantarillas


06.01.05.06 Curado de concreto con aditivo tipo membrana 113.55 m²

Cabezal de alcantarilla de TMC abovedada de 3.53 x 2.29


Descripción Número Largo Ancho Altura Total
Cabezal 56.78
Losa en cabezal 1.00 5.93 2.12 12.57
Muro central 2.00 4.42 3.09 27.28
Vacio de la tuberia -2.00 Area cad= 6.30 -12.60
Aleros 2.00 3.22 2.34 15.07
2.00 2.85 2.34 13.34
2.00 0.35 1.59 1.11
OBRAS DE ARTE - ALCANTARILLAS TMC
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22


06.01.05 Cabezales y cajas colectoras de alcantarillas

06.01.05.05 Acero de refuerzo fy=4200 kg/cm² 904.04 kg

Cabezal de alcantarilla de TMC abovedada de 3.53 x 2.29


Descripción Número Largo kg/m Total
Cabezal 904.04
Losa de Cabezal/Uña
Acero vertical negativo
1/2" 1 5.51 0.996 5.49
1/2" 1 6.00 0.996 5.98
1/2" 1 6.40 0.996 6.37
1/2" 1 6.80 0.996 6.77
1/2" 1 7.20 0.996 7.17
0.25 0.25 1/2" 1 7.60 0.996 7.57
1/2" 1 8.00 0.996 7.97
1/2" 1 8.40 0.996 8.37
1/2" 1 8.80 0.996 8.76
1/2" 1 8.94 0.996 8.90
1/2" 1 8.27 0.996 8.24
Acero horizontal negativo
1/2" 18 3.57 0.996 64.00
1/2" 2 3.07 0.996 6.12
0.25 0.25 1/2" 2 2.62 0.996 5.22
1/2" 2 2.17 0.996 4.32
1/2" 2 1.72 0.996 3.43
1/2" 2 1.07 0.996 2.13
Acero vertical positivo
1/2" 1 12 0.996 11.95
y 1/2" 1 8.8 0.996 8.76
1/2" 1 10.75 0.996 10.71
1/2" 1 10.21 0.996 10.17
Ojo: Traslape min = 0.50m para d> 1/2" 1 8.72 0.996 8.69
x
9.00m 1/2" 1 7.27 0.996 7.24
1/2" 1 8.88 0.996 8.84

Acero horizontal positivo


1/2" 12 1.78 0.996 21.27
0.2 1/2" 2 1.93 0.996 3.84
1/2" 2 1.7 0.996 3.39
x 0.3 1/2" 2 1.66 0.996 3.31
1/2" 2 1.61 0.996 3.21
1/2" 2 1.57 0.996 3.13
0.2 1/2" 2 1.53 0.996 3.05
OBRAS DE ARTE - ALCANTARILLAS TMC
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22


06.01.05 Cabezales y cajas colectoras de alcantarillas
1/2" 2 1.48 0.996 2.95
0.4 0.25 1/2" 2 1.44 0.996 2.87
1/2" 2 1.4 0.996 2.79
0.3 1/2" 2 1.03 0.996 2.05
1/2" 22 1.15 0.996 25.20
OBRAS DE ARTE - ALCANTARILLAS TMC
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22


06.01.05 Cabezales y cajas colectoras de alcantarillas
Acero de refuerzo vertical positivo
1/2" 1 4.27 0.996 4.25
1/2" 1 4.92 0.996 4.90
1/2" 1 5.37 0.996 5.35
0.25 0.25 1/2" 1 6.17 0.996 6.15
1/2" 1 6.52 0.996 6.49
1/2" 1 6.83 0.996 6.80
1/2" 1 7.11 0.996 7.08
1/2" 1 7.63 0.996 7.60
Acero horizontal de refuerzo positivo
1/2" 12 2.03 0.996 24.26
1/2" 2 1.89 0.996 3.76
0.2 0.15 1/2" 2 1.49 0.996 2.97
1/2" 2 1.22 0.996 2.43
1/2" 2 0.82 0.996 1.63

Muro Central
Acero vertical
0.1 0.1 5/8" 17 3.50 1.552 92.34
5/8" 17 3.48 1.552 91.82

3.2 3.18

0.2 0.2
Acero horizontal
3/8" 10 5.61 0.56 31.42
5.11 3/8" 10 5.01 0.56 28.06
0.25 0.25

4.51
0.25 0.25

Refuerzo radial
3/8" 1 9.33 0.56 5.22
P= 9.33 m

Aleros y Viga Sardinel


Acero vertical
1/2" 2 1.59 0.996 3.17
1/2" 2 1.66 0.996 3.31
OBRAS DE ARTE - ALCANTARILLAS TMC
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22


06.01.05 Cabezales y cajas colectoras de alcantarillas
1/2" 2 1.78 0.996 3.55
1/2" 2 1.89 0.996 3.76
1/2" 2 2.02 0.996 4.02
1/2" 2 2.13 0.996 4.24
OBRAS DE ARTE - ALCANTARILLAS TMC
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE
RIOJA - SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22


06.01.05 Cabezales y cajas colectoras de alcantarillas
1/2" 2 2.26 0.996 4.50
1/2" 2 2.38 0.996 4.74
1/2" 2 2.51 0.996 5.00
1/2" 2 2.63 0.996 5.24
1/2" 2 2.75 0.996 5.48
1/2" 2 2.87 0.996 5.72
0.25 x 1/2" 2 2.99 0.996 5.96
1/2" 2 1.59 0.996 3.17
1/2" 2 1.69 0.996 3.37
1/2" 2 1.81 0.996 3.61
1/2" 2 1.93 0.996 3.84
1/2" 2 2.05 0.996 4.08
1/2" 2 2.18 0.996 4.34
1/2" 2 2.3 0.996 4.58
1/2" 2 2.42 0.996 4.82
1/2" 2 2.55 0.996 5.08
1/2" 2 2.67 0.996 5.32
1/2" 2 2.79 0.996 5.56
1/2" 2 2.91 0.996 5.80
Acero horizontal
3/8" 12 3.37 0.56 22.65
3/8" 2 2.75 0.56 3.08
x 0.25 3/8" 2 2.23 0.56 2.50
0.06 3/8" 2 1.72 0.56 1.93
3/8" 2 1.21 0.56 1.36
3/8" 2 0.69 0.56 0.77
3/8" 12 3.43 0.56 23.05
3/8" 2 2.85 0.56 3.19
3/8" 2 2.34 0.56 2.62
0.05 x 3/8" 2 1.83 0.56 2.05
3/8" 2 1.32 0.56 1.48
3/8" 2 0.81 0.56 0.91
Viga Sardinel
5/8" 3 5.61 1.552 26.12
5.11 5/8" 2 5.19 1.552 16.11
0.25 0.25 5/8" 3 5.01 1.552 23.33
4.69
0.25 0.25
4.51
0.25 0.25
Estribos
3/8" 17 1.88 0.56 17.90

L= 1.88
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
OBRA :MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA -
SAN MARTIN
TRAMO : EMP.PE 05N (RIOJA - YORONGOS)
SUSTENTO METRADO CABEZAL TIPO TMC Ø 1.50m

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

06.01.05.04 Concreto clase D (f'c=210 kg/cm²)


Zapata = 1.00 x 1.00 x ( ( 6.09 x 0.50 ) - ( 1.35 x 0.30 ) ) = 2.64 m3

Pantalla = 1.00 x 1.00 x ( 1.44 x ( ( 0.45 + 0.35 )/2 ) x 1.90 ) - ( ¶ x 0.90^2 /4) ) x 0.38 ) = 0.85 m3

Alero 1 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.25 )/2 + 1.90 x ( 0.50 + 0.33 )/2 ) x ( 1.65 + 1.80 )/2 )) = 0.92 m3

Alero 2 = 1.00 x 1.00 x ( ( 1.00 x ( 0.30 + 0.25 )/2 + 1.90 x ( 0.50 + 0.33 )/2 ) x ( 1.65 + 1.80 )/2 )) = 0.92 m3

Total = 5.33 m3

06.01.05.02 Concreto clase H (f'c=140 kg/cm²) e = 10 cm


Solado = 1.00 x 1.00 x ( 0.77 x ( 2.39 + 1.11 )/2 ) x 1.00 = 1.35 M2

Total = 1.35 m2

06.01.05.01 Encofrado y desencofrado


Zapata = 1.00 x 1.00 x ( 10.24 x 0.50 + 5.50 x 0.50 ) = 7.87 m2

Pantalla = 1.00 x 2.00 x ( 1.90 x 1.90 - ( ¶ x 0.90^2 )/ 4 ) ) = 5.96 m2

Alero 1 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.29 + 2.51 )/2 ) + 1.00 x ( 0.30 + 0.25 )/2 = 5.28 m2

Alero 2 = 1.00 x 2.00 x ( (1.00 + 1.90 )/2 x ( 2.13 + 2.36 )/2 ) + 1.00 x ( 0.30 + 0.25 )/2 = 5.28 m2

Total = 24.39 m2

615.A ACERO DE REFUERZO (f'y = 4200 kg/cm2)

Cant. Long. Long. Total


DESCRIPCION Tip. Ø s Cant. N° veces a b c d e t. Kg/m
total parcial total (Kg)

UÑA F 1/2" @.250 10.00 1.00 10.00 .20 .33 .20 .15 .88 8.80 1.00 8.80
A 1/2" 2.00 1.00 2.00 .25 2.87 .25 3.37 6.74 1.00 6.74
A 1/2" 2.00 1.00 2.00 .25 3.37 .25 3.87 7.74 1.00 7.74
1/2" 1.00 1.00 1.00 1.49 1.18 1.49 4.16 4.16 1.00 4.16
1/2" 1.00 1.00 1.00 1.61 1.37 1.61 4.59 4.59 1.00 4.59
1/2" 1.00 1.00 1.00 1.74 1.58 1.74 5.06 5.06 1.00 5.06
1/2" 1.00 1.00 1.00 1.85 1.84 1.85 5.54 5.54 1.00 5.54
F 1/2" @.250 6.00 2.00 12.00 .20 .64 .30 .15 1.29 15.48 1.00 15.48
F 1/2" @.250 7.00 1.00 7.00 .20 .70 .30 .15 1.35 9.45 1.00 9.45
LOSA DE FONDO A 1/2" 1.00 1.00 1.00 .25 3.95 .25 4.45 4.45 1.00 4.45
A 1/2" 1.00 1.00 1.00 .25 3.53 .25 4.03 4.03 1.00 4.03
A 1/2" 2.00 1.00 2.00 .25 3.31 .25 3.81 7.62 1.00 7.62
A 1/2" 1.00 1.00 1.00 .25 2.68 .25 3.18 3.18 1.00 3.18
A 1/2" 1.00 1.00 1.00 .25 2.25 .25 2.75 2.75 1.00 2.75
A 1/2" 1.00 1.00 1.00 .25 3.73 .25 4.23 4.23 1.00 4.23
B 1/2" 6.00 1.00 6.00 .27 1.77 2.04 12.24 1.00 12.24
B 1/2" 2.00 1.00 2.00 .27 1.72 1.99 3.98 1.00 3.98
B 1/2" 2.00 1.00 2.00 .27 1.30 1.57 3.14 1.00 3.14
B 1/2" 2.00 1.00 2.00 .27 .87 1.14 2.28 1.00 2.28
PANTALLA F 1/2" 10.00 1.00 10.00 .20 1.47 .05 1.72 17.20 1.00 17.20
A 3/8" 8.00 1.00 8.00 .15 1.70 .15 2.00 16.00 .56 8.96
A 1/2" 2.00 1.00 2.00 .15 2.24 .15 2.54 5.08 1.00 5.08
A 1/2" 2.00 1.00 2.00 .15 2.03 .15 2.33 4.66 1.00 4.66
F 3/8" 7.00 1.00 7.00 .26 .26 .20 .20 .92 6.44 .56 3.61
M 3/8" 2.00 1.00 2.00 1.41 .20 .20 1.81 3.63 .56 2.03
ALEROS A 1/2" 6.00 1.00 6.00 .20 1.46 .20 1.86 11.16 1.00 11.16
A 1/2" 6.00 1.00 6.00 .20 1.20 .20 1.60 9.60 1.00 9.60
A 1/2" 4.00 1.00 4.00 .20 .95 .20 1.35 5.40 1.00 5.40
A 1/2" 6.00 1.00 6.00 .20 1.42 .20 1.82 10.92 1.00 10.92
A 1/2" 4.00 1.00 4.00 .20 1.17 .20 1.57 6.28 1.00 6.28
A 1/2" 4.00 1.00 4.00 .20 .99 .20 1.39 5.56 1.00 5.56
A 3/8" 6.00 1.00 6.00 .20 1.72 .20 2.12 12.72 .56 7.12
A 3/8" 2.00 1.00 2.00 .20 1.04 .20 1.44 2.88 .56 1.61
A 3/8" 2.00 1.00 2.00 .20 .30 .20 .70 1.40 .56 .78
A 3/8" 6.00 1.00 6.00 .20 1.85 .20 2.25 13.50 .56 7.56
A 3/8" 2.00 1.00 2.00 .20 .17 .20 .57 1.14 .56 .64
A 3/8" 2.00 1.00 2.00 .20 .43 .20 .83 1.66 .56 .93
615.A ACERO DE REFUERZO (kg) DELTALLES DE DOBLEZ DE REFUERZOS
Ø Parcial (Kg) b a
3/8" 33.25 a
1/2" 191.32 CROQUIS b c b a c ac
5/8" 0.00 a d
3/4" 0.00 c b

TOTAL 224.57 kg TIPO A B F M K


ENTIDAD : MINISTERIO DE TRANSPORTES Y COMUNICACIONES - PROVIAS NACIONAL
OBRA : REHABILITACION Y MEJORAMIENTO DE LA CARRETERA PE3N LONGITUDINAL DE LA SIERRA NORTE.
TRAMO : COCHABAMBA - CUTERVO - SANTO DOMINGO DE LA CAPILLA - CHIPLE.

OBRA: "REHABILITACION Y MEJORAMIENTO DE LA CARRETERA PE3N LONGITUDINAL DE LA SIERRA NORTE


TRAMO COCHABAMBA - CUTERVO - SANTO DOMINGO DE LA CAPILLA - CHIPLE"
SUSTENTO METRADO CABEZAL TIPO TMC Ø 1.50m

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

610.D1 CONCRETO CLASE D (f'c = 210 kg/cm2)


Zapata =1.00 x 1.00 x ( 12.79 x 0.25 ) = 3.20 m3

Pantalla =1.00 x 1.00 x ( ( ( 1.71 + 1.92 ) / 2 ) x 2.02 x 0.25 - ( ( ¶ x 1.52^2 ) / 4 ) ) x 0.25 ) = 0.46 m3

Alas =1.00 x 1.00 x ( ( ( ( 2.02 + 0.65 ) / 2 ) x 0.25 ) + ( ( 3.32 + 3.23 ) / 2 ) x 0.25 ) ) ) + ( ( ( 0.65 + 2.02 ) / 2 ) x 0.25 ) + ( 3.12 + 3.01 ) / 2 ) x 0.25 ) ) ) ) = 2.12 m3

Uña =1.00 x 1.00 x ( ( 6.12 + 0.50 + 0.50 ) x 0.30 x 0.75 ) = 1.60 m3

Total = 7.38 m3

610.H1 CONCRETO CLASE H (f'c = 100 kg/cm2)


Zapata =1.00 x 1.00 x ( 12.79 x 0.08 ) = 0.96 m3
Cuña =1.00 x 1.00 x ( 0.13 x ( 0.50 + 6.12 + 0.50 ) ) = 0.93 m3
Total = 1.89 m3

612.A ENCOFRADO Y DESENCOFRADO


Zapata =1.00 x 1.00 x ( 15.89 x 0.25 ) = 3.97 m2
Pantalla =1.00 x 1.00 x ( 1.71 x 2.02 + 1.92 x 2.02 - 2 x ( ( ¶ x 1.52^2 ) / 4 ) ) = 3.70 m2

Alas =1.00 x 1.00 x ( ( ( 2.02 + 0.65 ) / 2 ) x ( 3.32 + 3.23 ) / 2 ) + ( (0.65 + 2.02 ) / 2 ) x ( (3.12 + 3.01 ) / 2 + 2 x (0.25
= 17.25 m2

Uña =1.00 x 2.00 x ( ( 6.12 + 0.50 + 0.50 ) x 0.75 + 0.30 x 0.75 ) = 11.13 m2

Total = 36.05 m2

615.A ACERO DE REFUERZO (f'y = 4200 kg/cm2)

Cant. Long. Long. Total


Marca Tip. Ø s Cant. N° veces a b c d e t. Kg/m
total parcial total (Kg)

CA1 A 1/2" @.250 7.00 2.00 14.00 .15 4.29 .15 4.59 64.20 1.00 64.20
A 1/2" @.250 1.00 2.00 2.00 .15 6.28 .15 6.58 13.17 1.00 13.17
CA2 A 1/2" @.250 11.00 2.00 22.00 .15 1.05 .15 1.35 29.70 1.00 29.70
A 1/2" @.250 8.00 2.00 16.00 .15 2.10 .15 2.40 38.40 1.00 38.40
A 1/2" @.250 10.00 2.00 20.00 .15 1.05 .15 1.35 27.00 1.00 27.00
CA3 1/2" 2.00 1.00 2.00 .40 8.57 .40 .35 .35 10.07 20.15 1.00 20.15
CA4 1/2" 2.00 1.00 2.00 .35 6.02 .35 6.72 13.44 1.00 13.44
V1 K 3/8" @.200 36.00 1.00 36.00 .90 .20 .20 .90 .30 2.50 90.00 .56 50.40
A1 F 3/8" @.250 14.00 2.00 28.00 .15 1.58 .20 1.93 53.90 .56 30.18
F 3/8" @.250 13.00 2.00 26.00 .15 1.58 .20 1.93 50.05 .56 28.03
A2 F 1/2" @.250 14.00 2.00 28.00 .15 1.58 .20 1.93 53.90 1.00 53.90
F 1/2" @.250 13.00 2.00 26.00 .15 1.58 .20 1.93 50.05 1.00 50.05
A3 A 3/8" @.200 3.00 2.00 6.00 .15 3.18 .20 3.53 21.15 .56 11.85
A 3/8" @.200 7.00 2.00 14.00 .15 1.56 .20 1.91 26.78 .56 15.00
A 3/8" @.200 3.00 2.00 6.00 .15 2.96 .20 3.31 19.85 .56 11.12
A 3/8" @.200 7.00 2.00 14.00 .15 1.45 .20 1.80 25.26 .56 14.14
A4 A 1/2" 2.00 1.00 2.00 .30 3.45 .20 3.95 7.91 1.00 7.91
A 1/2" 2.00 1.00 2.00 .30 3.26 .20 3.76 7.51 1.00 7.51
M1 A 3/8" @.200 9.00 2.00 18.00 .15 .40 .15 .70 12.60 .56 7.06
A 3/8" @.200 2.00 2.00 4.00 .15 2.17 .20 2.52 10.08 .56 5.64
M2 A 3/8" @.200 3.00 2.00 6.00 .20 1.61 .20 2.01 12.06 .56 6.75
A 3/8" @.200 9.00 4.00 36.00 .20 .43 .15 .78 27.99 .56 15.67
M3 M 1/2" 2.00 1.00 2.00 R= 1.52 .50 10.05 20.10 1.00 20.10

615.A ACERO DE REFUERZO (kg) DELTALLES DE DOBLEZ DE REFUERZOS 625.62


Ø Parcial (Kg) b a
3/8" 195.84 a
1/2" 429.78 CROQUIS b c b a c ac
5/8" 0.00 a
3/4" 0.00 c b

TOTAL 625.62 kg TIPO A B F M K

OBRA: "REHABILITACION Y MEJORAMIENTO DE LA CARRETERA PE3N LONGITUDINAL DE LA SIERRA NORTE


TRAMO COCHABAMBA - CUTERVO - SANTO DOMINGO DE LA CAPILLA - CHIPLE"
ENTIDAD : PROYECTO ESPECIAL ALTO MAYO
:MEJORAMIENTO DEL CAMINO VECINAL SM-609; TRAMO: EMP.PE 08N (RIOJA - YORONGOS), DISTRITO DE RIOJA Y YORONGOS, PROVINCIA DE RIOJA - SAN MARTIN
OBRA

TRAMO : EMP.PE 05N (RIOJA - YORONGOS)

SUSTENTO METRADOS

ALCANTARILLA TMC. ABOVEDADA 3.53X2.29 m KM. 8+037.22

503.A4 CONCRETO ESTRUCTURAL CLASE D (f'c= 210 Kg/cm2)


Losa de Fondo = 1.00 x 1.00 x ( 2.50 x 3.52 x 0.40 ) = 3.52 m3

Paredes Laterales = 2.00 x 1.00 x ( 2.50 x 1.00 x 0.50 ) = 2.50 m3

Vertedero = 1.00 x 1.00 x ( 2.52 x 1.70 ) = 4.28 m3

Uña = 1.00 x 1.00 x ( ( 0.40 + 0.80 / 2 ) x 0.80 ) x 3.52 = 0.77 m3

Total = 11.08 m3

503.A8 CONCRETO CLASE H (f'c= 100 Kg/cm2)


Zapata (Solado) = 0.00 x 0.00 x ( 0.00 x 0.00 x 0.000 ) = 0.00 m3

Total = 0.00 m3

504.B ENCOFRADO Y DESENCOFRADO


Losa de Fondo = 1.00 x 1.00 x ( 2.00 x ( 2.50 + 3.52 ) x 0.40 ) = 4.82 m2
Paredes Laterales = 2.00 x 2.00 x ( 2.00 x ( 2.50 + 0.50 ) x 1.00 ) = 24.00 m2

Vertedero = 1.00 x 2.00 x ( 2.52 x 0.40 ) = 2.02 m2

Uña = 1.00 x 1.00 x ( 3.52 x 0.80 + 3.52 x 0.89 + 2.00 x 0.48 ) = 2.65 m2

Total = 33.48 m2

504.A ACERO CORRUGADO GRADO 60 fy= 4200 Kg/cm2

Cant. Long. Long. Total


Marca Tip. Ø s Cant. N° veces a b c d e t. Kg/m
total parcial total (Kg)
D1 B 1/2" 13.00 1.00 13.00 3.42 - - - - - 3.42 44.46 1.00 44.46
D2 A 1/2" 18.00 1.00 18.00 0.20 2.42 - - - - 2.62 47.16 1.00 47.16
D3 B 1/2" 13.00 1.00 13.00 3.42 - - - - - 3.42 44.46 1.00 44.46
D4 A 1/2" 18.00 1.00 18.00 0.20 2.42 - - - - 2.62 47.16 1.00 47.16
D5 A 1/2" 18.00 1.00 18.00 1.11 0.32 - - - - 1.43 25.74 1.00 25.74
D6 B 1/2" 6.00 1.00 6.00 3.42 - - - - - 3.42 20.52 1.00 20.52
D7 B 1/2" 4.00 1.00 4.00 3.42 - - - - - 3.42 13.68 1.00 13.68
D8 1/2" 18.00 1.00 18.00 1.63 - - - - - 1.63 29.34 1.00 29.34
D9 B 1/2" 6.00 1.00 6.00 3.42 - - - - - 3.42 20.52 1.00 20.52
D10 A 1/2" 52.00 1.00 52.00 0.35 1.30 - - - - 1.65 85.80 1.00 85.80
D11 B 3/8" 40.00 1.00 40.00 2.40 - - - - - 2.40 96.00 0.56 53.76

432.60
615.A ACERO DE REFUERZO (kg) DELTALLES DE DOBLEZ DE REFUERZOS
Ø Parcial (Kg) b a
3/8" 53.76 a
1/2" 378.84 CROQUIS b c a c c
a
(5/8") 0.00 a
(3/4") 0.00 c b

TOTAL 432.60 kg TIPO A B F M K

OBRA: "REHABILITACION Y MEJORAMIENTO DE LA CARRETERA PE3N LONGITUDINAL DE LA SIERRA NORTE


TRAMO COCHABAMBA - CUTERVO - SANTO DOMINGO DE LA CAPILLA - CHIPLE"