PROJECT: AMAIA STEPS ALABANG ESPERANZA AREA: EE AND AUXILARY ROOM


SUBJECT:ARCHITECTURAL AND MEPFS PUNCHLIST FLOOR LEVEL:2ND FLOOR
DATE: OCTOBER 14, 2022
PUNCHLIST FORM

ACCEPTED/CLOSED BY:
DATE
ITEM ANNEX/ DATE DATE
SPECIFIC FINDINGS/COMMENTS Sub-Contractor/ General APMC-TG (Close-out CLOSED-OUT REMARKS
NO. PAGE INSPECTED RECTIFIED BY APMC-TG
Supplier Contractor Signature)

1 Check EE and Aux Room doors threshhold gaps A1 14/10/2022

No provided fire extinguisher with signages and mounting


2 A1 14/10/2022
Pedestal at EE and AUX Room

3 Replace corroded screws in electrical panel boards A1 14/10/2022

Presence of dust accumulation inside tha panel. Provide


4 A2 14/10/2022
vacuum cleaning for all control panels.

5 Provide name tagging for auxiliary panels. A2 14/10/2022

No provided phase separator for the main circuit breakers


6 A2 14/10/2022
at electrical panel boards

7 Provide cable tagging. A2 14/10/2022

8 Remove splash paint at junction box A3 14/10/2022

Remove smoke detector covers and masking tape at EE


9 A3 14/10/2022
and AUX Room

10 Provide bonding jumpers at all electrical panel boards A3 14/10/2022

11 Provide wire nut connectors at all splice wires A3 14/10/2022

All electrical conduits must provide "ORANGE" color bond


12 tape at EE room and "YELLOW" color bond tape at AUX A4 14/10/2022
room

13 EE Room shall have explosion proof lighting as per Plan A4 14/10/2022

Rev. 05
Punchlisted by: Witnessed by: Fully Closed-Out by APMC-TG
REMARKS:

HENRY JOSEPH L. FULAY _________________________ ______________________________


APMC-TG Representative Contractor Representative Signature Over Printed name / Date