Unit IG2: Risk assessment

Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).

Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Learning Partner should provide you with a copy, but it can also be downloaded from the relevant resources
section for this qualification on the NEBOSH website.

Part 1: Background

You should aim to complete this section in 150 - 200 words.


Topic Comments
Name of organisation* A K textile industrial
Site location* It is located on main Shorkot road near Chenab garden, Toba Tek Singh Pakistan
Number of workers 70
I visit this company on 29 November 2021. This company has consist of two floor. First floor is
working area and the second is storage area. This company product vegetable net and thread.
Cotton are used in production of thread. Spreading area of mills is 2000sq.meter.Parking area is
arranging in ground floor .There are four types of machinery are use in working area. Those are
General description of the organisation net machine, sewing machine, Trulzschler TD-8 Machine and recycle machine. Workers are
working from 8:00AM to 5:00PM in single shift and Friday is off. Workers works 54 hour in a
week. Typically activity include repair machine, recycling machine, vegetable net machine,
electrical machinery, are activities on this workplace. Different types of chemicals are used to
change clout of thread.
Description of the area to be included in the
Whole company area where are all activity are occur, in general description.
risk assessment
Any other relevant information Mil director and safety officer will responsible of health and safety.
* If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be
factual.

You should aim to complete this section in 100 - 200 words.


Note: this section can be completed after you have competed your risk assessment.
Outline how the risk assessment was carried First of all, when I started writing this risk assessment for external sources, I often visited the site
out this should include: of ILO to find hazard on my site but i did not find any I stated by looking to see the HSE series
 sources of information consulted; code:rr835

Learner number: 00611764 Learner name: USMAN SAJJAD Page 1 of 19


http://www.hsegov.uk/research/rrhtm/rr835.htm.
The HSE book helped me a lot.
I visit the company to get internal source of this organization, I went to this workplace and
interviewed with the worker. They told me about the hazard are present there, those are left in
visual inspection and they are tell me PPE are also provide to protect ourselves from the danger
 who you spoke to; and of electricity. But mostly people don’t know anything about it. For example workers wear the mask
 how you identified: in textile mill. If workers doesn’t wear mask at work can cause serious damage to their lungs.
- the hazards; Dust substance hazard can be control by wearing mask, good housekeeping and passing fresh
- what is already being done; and air in company.
- any additional controls/actions that After this inspection, I picked the accident book, audit record, maintenance report and risk
may be required. assessment. And check the record of last 6 month and whether I check what accident are
happening again what steps have been taken to address these dangers. I also checked what
disease present in worker. Due to which absence of workers in company. And they are being
treated are not.
After this process, I referred notes those made during inspection. I help myself and decide all
action those are control all measure hazard.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 2 of 19


Part 2: Risk Assessment

Organisation name: A K Textile Industry


Date of assessment: 29 November 2021
Scope of risk assessment: Whole company area where are all activity are occur, in general description.

Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
1. Load Forklift operator and the Personal protective 1. Conveyor belt system must 1 month Transport
handling workers work near forklift equipment’s like helmet and installed that carry material manager( res
equipment machine gloves already provided the from one place to another. ponsible for
forklift operator. action 1,3
Turnover of The forklift operator carry and 4
forklift due to heavy load and overloaded 2. Should load the forklift 1 day
overloading which result balance machine by their safe work
of forklift doesn’t well, this can cause load level.
of accident. This accident Safety officer
could have broken his legs, responsible
head injuries and small cuts 3. Only third party certified for action 2
on body. person can operate a 1 week and 5.
forklift machine.

HSE
4. Must inspect the area of 2 days supervisor
forklift machine no responsible
potholes present in the for action 6
way of forklift machine.

5. On daily basis pre use 1 day


inspection of fork lift must
be performed.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 3 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)

6. On weekly basis 1 week


maintenance of forklift
must be performed and
check oil and tyre quality.

.
2. Electricity Site supervisor, machine Safety rubber gloves 1. Must replace the damaged 3 week
operator and all other provided the machine wire of Trulzschler TD-8 Site
Electrocution workers that work near operator. machine and installed supervisor
due to machine double insulated wire with responsible
damage wire machine. for action 1
of Trulzschler The machine operator use and 2
TD-8 the Trulzschler TD-8
Machine machine which wire is 2. Should installed fuse 1 week
totally damaged and may system with machine.
be electrocution of Safety officer
operators and others responsible
worker happen and result 3. On daily basis pre use for action 3,
burning of skin, damage of inspection of machine 2 days 4 and 6
nervous system and death must performed.
due to high voltage of
machine.
4. Once a week full HSE
maintenance of machine supervisor
performed in which responsible
machine wire quality and 1 week for action 5
their motor check.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 4 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
5. Proper training related to
electricity hazard must be 2 week
given the all workers and
machine operator.

6. Electric hazard sign board 1 day


paste near machine.
3. Noise Site supervisor, visitors and Job rotation technique 1. Silencer must be installed 1 week Site
all worker work near adopted to minimize the with generator which supervisor
High noise generator exposure of workers with minimize the noise of responsible
generated high frequency noise. generator. for action 1
from The generator is use when and 2
unmaintained electricity off due to not
generator proper maintenance of 2. Ear muff must be provided 1 week
generator the generator the workers that worker
produces high frequency near generator. Safety officer
noise, which cause the responsible
most common health for action 3
problem ‘Noise induced and 7
hearing loss” (NHL) and 3. Once a week proper
air drum damage. maintenance of generator 2 week
performed in which oil
quality and motor of HSE
generator should checked. supervisor
responsible
for action 4,5
4. Rest break must be 2 days and 6
provided the workers that
work near generator.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 5 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)

5. Sound level meter should 3 days


be installed the area where
generator operate.

6. Once a month health


surveillance must be given 2 week
all the workers that
regularly contact with high
frequency sound.

7. Noisy area sign board 1 day


installed all the area

4. Slip and Site supervisor, visitors and Proper lightening already 1. Instead of using mug to
Trip all other workers that work installed in the walking area carry oil should use top 1 week Site
in machine operating from where worker walk. close buckets to carry oil supervisor
Oil is spread section for generator filling. responsible
in the way of for action 1
pedestrian Safety gloves provided the and 2
path The worker carry generator workers already 2. Slip resistance shoes must
oil in mugs and fill the be provided all the workers 5 days
generator and some oil fall that work in machine
in the pedestrian walkway section. Safety officer
and the walkway is slippery responsible
and result slipping of for action 3
workers and they face 3. On daily basis should 1 day and 4
multiples consequences clean the area.
like bruises, bone fracture

Learner number: 00611764 Learner name: USMAN SAJJAD Page 6 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
and head injuries
4. Slip hazard sign board 1 day HSE
must be paste all the area. supervisor
responsible
for action 5
5. Competent worker should 2 week and 6
be hire for carry oil for
generator filling.

6. Separate route must be


develop for pedestrian 1 week
walking and oil carry
workers.

5. Working at Site Supervisor, welder, Safety helmet already 1. Should installed the guard 2 week Site
height helpers and all other provide the workers that work rail around the scaffold. supervisor
workers that work near at height. responsible
Welder weld scaffold for action 1
guard rail on 2. Full body harness must be 1 week and 2
second floor given the workers that
with the help The welder weld the guard Proper training regarding work on scaffold.
of unguarded rail on second floor by work at height provide the Safety officer
scaffold using unguarded scaffold workers that performed work responsible
which may result falling of at height activity 3. Permit to work must be 1 week for action 4,5
worker and material and issue before staring of and 6
result many problems face work at height activity

Learner number: 00611764 Learner name: USMAN SAJJAD Page 7 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
by workers like head performed.
injuries, bone fracture and
death of worker. HSE
4. Safety net must be supervisor
installed under the 1 day responsible
scaffold. for action 3
and 7

5. Work at height activity 1 day


performed sign board
should paste around the
scaffold area.

6. Regular inspection of 2 days


scaffold must be
performed.

7. Should barricade the area 1 day


where work at height
activity performed.
Site supervisor, machine “Hazardous substance” sign 1. Local exhaust ventilation 3 week Site
6. operators, visitors and all board paste in near recycle system should installed supervisor
Hazardous other workers that work in machine. above the machine that responsible
substance mill area move out tiny particles for action 1
directly. and 2
From recycle
machine tiny During working of recycle
particles of machine the tiny particles 2. Should segregate the 1 month
thread fly in of thread spread in air and machine and develop Safety officer

Learner number: 00611764 Learner name: USMAN SAJJAD Page 8 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
air and affect worker inhale these separate area for recycle responsible
workers particles through air this machine working. for action 3
may cause serious problem
for workers like lung
diseases, respiratory 3. Respiratory protective
system damage, asthma equipment mask must 1 week
problem and heart diseases provide all the workers that HSE
by large exposure. work in recycle machine supervisor
area. responsible
for action 4,5
and 6
4. Job rotation technique 1day
adopted to minimize the
workers exposure with
thread particles.

5. Rest break must be given 1 day


the workers.

6. Once a month health


surveillance must be given 1 week
the workers.
7. Work Machine operator and Worker wear tight clothes 1. Safety guard rail must be 2 week Site
equipment machine helper already. installed around net supervisor
machine. responsible
Rolling of for action 1
worker body The workers installed
due to thread in machine and 2. Only “authorized person 1 day
absence of machine run due to use” machine, sign board

Learner number: 00611764 Learner name: USMAN SAJJAD Page 9 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
safety guard absence of safety guard paste on machine. Safety officer
around net around net machine the responsible
machine workers clothe and body for action
part may come in contact 3. Proper training regarding 2 week 2,4,and 5
with net machine and result machine hazard must be
amputation of body part, given the workers.
deep wound and death
HSE
4. Active supervision of 2 days supervisor
workers must be responsible
performed during working. for action 3
and 6
5. Safety gloves must be 2 days
provided the workers.

6. Company should hire 2 weeks


competent workers that
has efficient knowledge of
operating net machine.
8. Fire Site supervisor, visitors and No action taken already 1. Should built separate 3 week Site
all the workers that work in ventilated area for storage supervisor
Worker mill of diesel drum responsible
smoke near for action 1
the diesel and 3
drum and During the break time the 2. “No smoking” sign board
that nay worker smoke near the paste around boiler. 1 day
cause fire diesel drums that is used
when smoke for machine running and Safety officer
spark hit that may cause fire or 3. Separate area must be responsible
diesel drums explosion when smoke built for smoking of worker. 1 month for action 2,5

Learner number: 00611764 Learner name: USMAN SAJJAD Page 10 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
spark hit diesel drums then and 6
the worker face many
consequences like body 4. Proper training must be
burning of workers, eye given the worker about fire 1 week
loss, body paralysis and hazard. HSE
death of workers occur. supervisor
responsible
5. Regular supervision of for action 4
diesel drums through 1 day
CCTV cameras must
performed.

6. Fire extinguisher should be 4 days


installed near boiler.

9. Manual Worker only Safety gloves and shoes 1. Forklift truck should be 3 week Site
handling already provided the workers given for carry heavy net supervisor
The worker carry heavy net rolls into swing machine responsible
Worker carry rolls manually and dumb area. for action 1
heavy net near swing machine during only
rolls the transporting of net may
manually net rolls fall and during 2. Proper training regarding 2 week
dumb into carry load many problems manual handling must be Safety officer
near swing may face by worker like provided the workers. responsible
machine back pain, Musculoskeletal for action 3
disorder, bone fracture and only
Injuries of legs and arm. 3. Company should lift only 1 day
that weight from worker
which worker lift easily.
HSE

Learner number: 00611764 Learner name: USMAN SAJJAD Page 11 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
supervisor
4. Monthly health surveillance 2 week responsible
must be given the worker for action 2,
that carry load manually. 4, 5 and 6

5. Job rotation should be 2 days


adopted to minimize the
exposure of workers with
heavy load carrying.

6. Rest break must be given 1 day


the workers.
10. Site supervisor, visitors and 1. Should develop separate 3 week Site
Movement of all others workers that work Proper lightening already path for forklift and worker supervisor
vehicle and in mill area. installed in area where moving. responsible
people vehicle and workers move for action 1

Collision of The forklift and people 2. Traffic route design should 2 weeks
vehicle and moving in mill area in a Regular maintenance of be built and should provide
people due same path and there is no forklift vehicle performed knowledge every workers Safety officer
to no proper proper path way for vehicle already about traffic route. responsible
path way for and workers that may for action 3
forklift and cause collision of workers and 5
pedestrian and result bone fracture, 3. “Vehicle area” Sign board 1 day
moving bruises, deep injuries and must installed.
death by high speed
collision of fork lift and HSE
worker 4. Should provide proper supervisor
training to forklift operator 2 week responsible

Learner number: 00611764 Learner name: USMAN SAJJAD Page 12 of 19


Hazard Who might be harmed What are you already What further controls/actions Time scales
category and how? doing? are required? for further Responsible
and hazard actions to be person’s job
completed title
(within …)
and worker about collision for action 2,4
hazard in path way. and 6

5. Should minimize the speed 1 day


of forklift vehicle.

6. Should installed mirrors at 3 days


blind corners.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 13 of 19


Part 3: Prioritise 3 actions with justification for the selection
Suggested word counts
Moral and financial arguments for all actions: 300 to 350 words
For EACH action:
Specific legal arguments: 100 to 150 words
Likelihood AND severity: 75 to 150 words
How effective the action is likely to be in controlling the risk: 100 to 150 words

Moral and financial arguments for ALL actions

Moral, general legal and financial Moral argument:


arguments
It is moral responsibility of company to ensure all worker those worked who work in organization. It
will be up to care of duty if organization wants the health and safety of their worker. Any worker is
doing work he is dependent on his family for source of income and food. Any worker didn’t consider
alone, Rather his injuries effect his entire family. Besides, there is no one to earn at home. He may
also be completely disable due to accident. His wife may also have to work to support the family.
Society does not accept unsafe condition of company. It can also damage the company reputation.
Worker did not feel safe themselves physically and mental. Moral will be down of all worker. It
becomes the moral responsibility of employer ensure the health and safety of worker.
Legal Argument:
It is the company responsibility to operate in accordance with international standard law. It is also
the responsibility of company. All of them follow rules and regulation is apply to all company
employer those are ensure health and safety for worker. Strict action should be taken against
anyone employer those fail to perform his duties. If the law is broken, So, warning letter are also
issued against employer in the shape of prohibition action and corrective notice. Besides that, legal
agency employer of company or related person can also call by court. He could be jailed or fined.
The chance of will be close due to catastrophic condition.
Financial word:
Due to sudden accident, mall has face big financial loss. Money that the mall spends on accident
prevention will be spent before the accident after the accident loss is greater. After the accident,
mall will be give sick pay to injured person. Machinery and equipment those was damage spend
more on it. Due to accident, company will hire a new staff, and it will take a lot of time to train him.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 14 of 19


Due to an accident, company reputation will be down, and it became difficult to gets contracts in
future. Morale of worker will be effective they will not feel safe workplace. Lots of time will spend to
prepare accident reports and enforcement. Meeting. Injured person will claim compensation. All
expenses will be paid by company has not taken any kind of information. Mall will have to bear all
these costs because mall does not have its own insurance policy.

Justification for action 1

1. Must replace the damaged wire of Trulzschler TD-8 machine and installed double insulated
Action
wire with machine. (Electricity).
Specific legal arguments The ILO C167- safety and health in construction convention 1988, clearly mention that it is
employer responsibility to protect live cables from electricity shock hazard and installed cables
which are fully insulated and same convention article 26 mention it is employer responsibility to
fully maintenance the electric cables and provide safe system to workers.
Also Pakistan factories act 1934 Article 33-l bound employer to check the machine parts like
cables and motors and if it defective then replace it and give worker healthy environment.
Consideration of likelihood AND severity Likelihood of harm occurring is very high because maintenance electric team come daily and
check machine brake down. And works four to five hours in a shift. In this team 20 people
involved and all are at high risk when they contact with highly damaged machine wire, due to
no proper supervision increases likelihood of hazrd
I categories the severity into four categories:
Minimal: minor injuries/ no property loss
Minor: first aid required in injuries/ very low level of property loss.
Major: loss time injuries/ high loss of property.
Catastrophic: permanent disability or death/ irreplaceable property loss.

The severity lies between major to catastrophic. The maintenance work team those attend
machine brake down without isolation power of supply. When the maintenance team work and
they may face electric current due to damage wire then they may get serious injuries like body
burning, side paralysis, nervous system damage and death by paralysis of heart due to high
voltage. Also due to short circuit the machine is totally damage. So this severity is in between
major to catastrophic.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 15 of 19


How effective the action is likely to be in
The action will control Hazard by installed new double insulated wire of Trulzscheler TD-8 Machine
controlling the risk. This should include:
by change damage wire to double insulated wire will protect maintenance team work with direct
 the intended impact of the action; contact of live wire current wire and safe workers from electric shock hazard. .
 justification for the timescale that you I have given time scale for three week because company Trulzscheler TD-8 Machine wire is fully
indicated in your risk assessment; damage. Then site supervisor talk to general manager and agree them to purchase double
and insulated new wire then company purchase Trulzscheler TD-8 Machine wire and hire contractor to
 whether you think the action will fully installed new wire in machine so in all these process three week spend.
control the risk.
This action may not fully control hazard for fully control hazard proper inspection and maintenance
of machine should be performed.

Justification for action 2

1. Should built separate ventilated area for storage of diesel drum. (Fire)
Action

Specific legal arguments According to ILO C167 Article 29 it is a responsibilities of employer to make sure a separated area
for flammable material like solid, liquid and gases that catch fire and to protect their worker from fire
hazard.
Also ILO Recommendation R164-occupational safety and health clearly mention that it is employer
responsibility to protect explosive material from heat and fire.
According to Pakistan factories act 1934 article 33-L clearly mention that employer must barricade
the area where explosive material place and no heat activity performed near flammable material.
Consideration of likelihood AND severity The likelihood of this hazard is very high because during the break time workers continuously
smoke near the area where diesel drum place, and also there is no sufficient control to fire like fire
extinguishers. And also 70 workers work in area that performed 10 hours duty and all are at high
risk of fire. So this hazard has very high likelihood.
I categories the severity into four categories:
Minimal: minor injuries/ no property loss

Learner number: 00611764 Learner name: USMAN SAJJAD Page 16 of 19


Minor: first aid required in injuries/ very low level of property loss.
Major: loss time injuries/ high loss of property.
Catastrophic: permanent disability or death/ irreplaceable property loss.

The severity lies between major to catastrophic. The worker smoke near diesel drum and there is
no barricading around diesel drum and this may cause explosion when smoke spark hit diesel
drums and result burning of workers body, permanent disability and death occur and also with that
the mill machines are destroy totally.
How effective the action is likely to be in
By develop separated ventilated area for diesel drum storage result no direct contact of worker
controlling the risk. This should include:
smoke spark and diesel drum and smoke spark not hit diesel drums by this way no explosion and
 the intended impact of the action; fire occur.
 justification for the timescale that you To accomplish this target I give 3 week timescale. The site supervisor talk to company general
indicated in your risk assessment; manager and agree him for importance of separated ventilated area for diesel drum storage then
and proper documentation proceed and company hire certified contractor that built separated area for
 whether you think the action will fully diesel drum storage. So in all documentation and proceeding three week spend.
control the risk.
By my opinion by taken this step the action may not fully control hazard, for control hazard fully
regular supervision of storage area and separated area for smoking of worker is necessary.

Justification for action 3

1. Should installed the guard rail around the scaffold. (Work at Height)
Action

Specific legal arguments The ILO Recommendation R175 state that “Every scaffold should be properly design and
fully maintain for prevent of collapse”. The working platform of scaffold are fully protected
and must guardrail around scaffold.

Also the Article 18 of ILO Convention C167 clearly mention that it is employer prime
responsibility to take suitable steps to protect workers that work on height the scaffold is
fully guarded so worker protect from falling during height.

Consideration of likelihood AND severity The likelihood of this hazard is very high the worker performed welding at height on scaffold without
guard rail and also no body harness given the workers and they performed continuously welding

Learner number: 00611764 Learner name: USMAN SAJJAD Page 17 of 19


about 9 hours and there are 38 workers around scaffold and 5 workers on scaffold. They all affect
when some material or worker fall from scaffold.
I categories the severity into four categories:
Minimal: minor injuries/ no property loss
Minor: first aid required in injuries/ very low level of property loss.
Major: loss time injuries/ high loss of property.
Catastrophic: permanent disability or death/ irreplaceable property loss.

The severity lies between major to catastrophic. The worker work on scaffold and there is no guard
rail around scaffold and maybe worker and material fall from height and result many consequences
face by workers like head injuries, bone fracture and death. Also with that the material fall from
height is fully damaged and unrecoverable.
How effective the action is likely to be in
The action protect the workers from falling from height by installing of guard rail around the scaffold
controlling the risk. This should include:
protect the workers and also material from falling from the height. The guard rail hold the workers
 the intended impact of the action; from falling from height.
 justification for the timescale that you For completion of this action I give 2 week time period because the site supervisor talk to general
indicated in your risk assessment; manager of company and then they issue financial budget to purchase guard rail. Then company
and hire certified contractor that installed guard around scaffold so 1 week spend in this action.
 whether you think the action will fully
control the risk. For my opinion the action may not fully control hazard by fully control hazard must provide full body
harness to the worker and also installed safety net under scaffold.
Part 4: Review, communicate and check
Suggested word counts for each section:
 Planned review date or period and reasoning for this: 50 - 100 words
 How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words
 Follow up on the risk assessment: 100 - 150 words.

Planned review date/period with It is include in company, I will review risk assessment after 1 year on 29 November 2022. Other state to review
reasoning the risk assessment, If I will change new equipment and material then I will review risk assessment. If I will
change work procedure before 29 November 2022 then I review risk assessment. If I changed mall policy and
legal standard then I will review my risk assessment. Suddenly any accident or incident and maybe I will hire a

Learner number: 00611764 Learner name: USMAN SAJJAD Page 18 of 19


new staff, then I will review risk assessment.
How the risk assessment findings will be After completed fully process, First of all I will request for meeting with director of the mall. In this meeting, I will
communicated AND who you need to tell discuss about risk assessment those are present and share minutes of meeting with my finding. So, I will arrange
meeting with supervisor and share all information of hazard which are occur in this company. After meeting with, I
will inform to director of company, I have told the supervisor all the things about risk assessment that I have consult
with you. Then I will arrange a meeting with all worker. In this meeting, I will tell about tool box talk and informed
whose hazard are present in this mall. I will inform everyone about hazard by give training, assigned notice board
and related poster.
How you will follow up on the risk I will ensure to my suggestion where they are being act upon or not. I will write in personal dairy or Microsoft
assessment to check that the actions Excel. In diary, I will write include all detail of my suggestion those are implement. I will cost my mall before time
have been carried out those will give to worker to clear default. I will hire a responsible person those send photography or written verbal
through email on this place whether it has improved are not. If anything are in control whose deadline are passed
but work it remain to be seen. I will ask to concern person what reason will occur and I will try to get the work done
as soon as possible. If there is a shortage of delay carriage worker or may be it is a financial problem. So, I will
concern inform the concern department.

Learner number: 00611764 Learner name: USMAN SAJJAD Page 19 of 19