Tie Down Requirements For Timber Frames
Tie Down Requirements For Timber Frames
\
Advanced Diploma of Building Surveying Research and evaluate construction methods and materials for
commercial buildings up to 3 storeys CPCCBS6001 Data sheet/Assessment nº ___
Name:__________________________
Design all the necessary tie-downs for the following examples.
Example 1. TRUSS-SHEET GABLE ROOF 22.5 Degree pitch. Single storey ,No-eave. Truss spacing 900mm
Batten Tie-down___________________
Truss to top-plate__________________
Top-plate to stud__________________
10m
- - - - - - - -- - - -- -- - - - -- - - - - -- -- - - -- - - -- -
Bot-plate to stud __________________
24m
Example2 . TRUSS-SHEET GABLE ROOF 22.5 Degree pitch. Single storey ,600mm eave.Truss spacing 600mm
Batten Tie-down___________________
Truss to top-plate__________________
Top-plate to stud__________________
12m
- - - - - - - -- - - -- -- - - - -- - - - - -- -- - - -- - - -- -
Bot-plate to stud __________________
24m
Example3 . TRUSS-TILE GABLE ROOF 22.5 Degree pitch. Single storey ,600mm eave.Truss spacing 600mm
Batten Tie-down___________________
Truss to top-plate__________________
Top-plate to stud__________________
12m
- - - - - - - -- - - -- -- - - - -- - - - - -- -- - - -- - - -- -
Bot-plate to stud __________________
24m