Inspection Plan

Equipment Name: Gas Suction/Discharge (Main Skid), PED Category: II


Separator Stage 1_Stage 3, Separator Stage 1, Stage 2, Stage 3,
Drawing No.: 012.571.01 Rev. 08, 012.572.30 Rev. 08, 012.573.30 Rev. 08,
123.502.082.200 Rev.02, 1-125.109.156 Rev. b, 1-125.109.157 Rev. b,
Manufacturer: Burckhardt Compression (India) Pvt. Ltd.
Manufactured at: AWS Machine Tools Pvt Ltd.

Sr, MESSUREMENTS/EXAMINATIONS/ Manufacture Burckhardt TUV


place Compression Nord Remarks
No TESTS/RESULTS
Design examination and drawing
1. Drawing P P V
by Burckhardt
PMA for ASME material by
2. PMA for Materials: P P V
Burckhardt
W W W Raw Material identification of
3. Material Inspection Pressure parts.If material form
Non-PED, 3.2 testing by NoBo
R R R Review of Welding consumables
4. Records of welding consumables test certificates with valid
WPQR.
R R R Review for applicable
Qualification of welding personnel qualification made by NoBo
5.
As per DIN EN ISO 9606-1 Witness for new qualification by
TUV Nord
R R R Review for applicable
Qualification of operating procedures qualification made by NoBo
6.
As per DIN EN ISO 15614-1 Witness for new qualification by
TUV Nord
Records of NDT personnel/Level V V V Qualified Level 2 for applicable
7. As per DIN EN ISO 9712 / NDE standard
PED Annex –I 3.1.3
P P W 100% on external pressure weld
8. Non destructive tests. PT joints as per EN ISO 3452-1
(if applicable)
P R R 100% butt weld joints as per As
9. Non destructive tests. RT
per EN ISO 17636-1
Calibration of measuring and test R P R Review of Calibration certificate
10. equipment of Pressure gauges used for
testing before testing
Pressure Test of Equipment H H/W W By Water for 30 minutes
11
minimum
Visual examination / Dimensional W H P
12. check
13. Marking (name plate) P W H
14. Analysis of hazards and risks P P V
15. Operating instructions H P V
16. Declaration of Conformity / Draft H H V

Remarks:
P – Perform
H – Hold ,
A – Approval
W – Witness
V – Verification
R - Review

Notified Body 0045 for pressure equipment