Contractors: Re: Quotation For Shed Structure Around The Toilets
Contractors: Re: Quotation For Shed Structure Around The Toilets
Quotation To;
Give Power Kenya Ltd
Mtongwe Works Site
Dear Sir,
Attn. Alex
NO DESCRIPTION AMOUNT
1 Metal works (galvanized tubbing) 55,000
Metal frame work( including cutting/fitting to ground/welding and
painting)
2 Sed covering 35,980
top and side covering with heavy duty canvas lining to protect from
heat
3 Cement / sand works 25,400
base plate cementing/attach to ground including digging/ concreating
and making good disturbed areas,
sub- total 116,380
vat 18,620
TOTAL 135,000