DETALIU "a" V1 V1 Pozitionare fundatii pasj de trecere "PT"

MODUL M (M ) ELEVATIE
3.5
3.5
3.0
3.5 "a" DETAIL 4 - 100 "A" DETAIL Ax C.F.
4 - 100 Sc. 1:100 Railway axis
Sc. 1:10
POZITIONARE PANOURI FATA DE LINIA C.F. 3.5 3.0
M (M ) ELEVATION MODULUS
3.5 3.5
Panouri fonoabsorbante

distanta "D"
affar off "D"
POSITIONING OF THE PANELS WITH RESPECT TO THE RAILWAY LINE Sc. 1:50 Placuta inglobata
S 4.4 in aliniament curent
Sc. 1:50
EP 3.50 in prefabricat EP
Sound absorbing panels D
stalp sustinere Plate included in
+3.50 (+3.00) det."a" +3.50 (+3.00) 1.00 1.50 1.00 in current alignment C
supporting pole prefabricate EP
EP 1.10
1Ø10 L=0.1m EP 3.50 EP 2.00 B
EP 3.50

.90
A
Indice Data Modificare Proiectant Aprobat Consultant Aprobat CFR
Index Date Modification/Revision Designer Approved Consultant Approved CFR
panouri fonoabsorbante Stalp S 4.40 sau S 3.90 S 4.4
sound absorbing panels
350 (3.00)

Pole S 4.40 or S 3.90


S 4.4
3.5
Modul M 3.5 in plan retras cu 90 cm GUVERNUL ROMANIEI PROIECT FINAN ŢAT DE UNIUNEA EUROPEAN Ă
3.5 ROMANIAN GOVERNMENT EUROPEAN UNION FINANCED PROJECT
M 3.5 modulus retreated with 90 cm

350(3.00)
10 distanta "D"
BUILDING THE FUNDATION
affar off "D"
umplutura pamant
V1 - V1 2 4-100 1. - The lawer level of the concrete fondation is -1.40, from the rail
30 25 Sc. 1:10
±0.00
earth filling
±0.00 Placuta inglobata in stalp upper level (RUL).
±0.00
Niv. med. Plate included in pole Under this level, a well compacted filling laver made out of crushed

20 5
fundatie prefabricata

5
-0.25 -0.20 25

45 20 20
prefabricated foundation teren natural
Medium stone and sand of minimum thickness 15 cm is to be placed.(The bottom
85

ground level of the excavation must be compacted rightly.)


-0.90 -0.90
In case the proper fondation soil is situated lower the layer thikness

120
5

5
40

is to be increased accordingly 10 cm tickness equilizing concrete will be

10 40
-1.40 Placuta inglobata in EP
-1.40
Plate included in EP poured over that layer.
10

12.5 75 12.5 Data Semnătură


bloc beton simplu C 6/7.5 40 40 270 40 40 1Ø10 - L=0.10m 2. - The FP1 prefab cylinder is mounted by suspending it with two Date Signature
beton egalizare C 2.8/3.5 100 C 6/7.5 plain concrete block Ø89x5mm pipes, each of them supported by two adjustable beanings Aprobat Şef proiect
C2.8/3.5equalizing concrete 40 350 40 Approved Project manager
R. Liuzza 12. 2011
(jack type) placed at max.2.00 mdistance one from the another. Aprobat Coordonator Secţiune 1
Approved Section 1 Coordinator C. Gambelli 12. 2011
After attachement of FP1, pref on horizontal and vertical direction Verificat

PDF created with pdfFactory Pro trial version www.pdffactory.com


Verificator
the C6/7.5 concrete black is cast. The support are removed after the Checked Giuseppe Fioravanti 12. 2011
Verifier
MONTARE PAHAR DE FUNDATIE PF1 cast in place concrete handening.
Caracteristici beton conf. NEO12-99
SECTIUNE 1-1 DETALIU MONOLITIZARE STALP FUNDATIE - Marca beton: SUBCONTRACTANT / SUBCONTRACTOR
ASSEMBLING OF THE U-SHAPED FOUNDATION PF1 MONOLITH DETAIL OF FOUNDATION POLE REALIZAREA FUNDATIEI
Teava Ø 89 x 5 pentru montaj 1-1 SECTION C4/5; C6/7.5; C 16/20 - P 4 - T3- II/A - S32.5 (SR 1500) Aprobat Responsabil Subconsultant
12. 2011
Bloc beton simplu 0.80 x 1.00 m Sc. 1:25 Pipe Ø 89 x 5 for assembling Sc. 1:25 Sc. 1:25 Approved Subconsultant Responsible A.Stanciu - Dinulescu
plain concrete block 0.80 x 1.00 m max. 2.00 Stalp S 4.40 1. - Nivelul inferior al fundatiei de beton este -1.40, fata - OL37-2
Pole S 4.40 Întocmit Proiectant
Monolitizare cu beton C 20/25 - Calitatea imbinarilor sudate, conform Indicativ C150 Andreea Staicu 12. 2011
de nivelul superior al sinei (NSS). Designer

12.5
Elaborated
C 20/25 monolith concrete - Nivelul de acceptare a imbinarilor sudate "B"
Sub acest nivel se realizeaza un strat de umplutura bine Reabilitarea liniei de cale ferata Braşov - Simeria, parte componentă a coridorului
Proiect/Project

15
IV Pan European, pentru circulaţia trenurilor cu viteza maximă de 160 km/h,
compactata din piatra sparta si nisip cu grosimea de minimum 15 cm. Concrete characteristics conf. NEO12-99

35
Tronsonul : Braşov - Sighişoara

20
FP1 2004/RO/16/P/PA/003
1 1 2 reazeme reglabile FP1 (Fundul sapaturii trebuie sa fie bine compactat cu maiul). - Concrete mark:

100

75
2 adjustable supports C4/5; C6/7.5; C 16/20 - P 4 -- TII/A
3 - S32.5 (SR 1500) , Faza / Phase:
25 In cazul in care terenul bun de fundare se afla mai jos, grosimea
- OL37-2 Section : Braşov - Sighişoara D.E. / E.D.

45
acestui start se mareste corespunzator. Peste acesta se toarna betonul
- The quality of welde joints, according to Code C150

120
de egalizare de 10 cm grosime. Denumire desen / Drawing Title :

12.5
Bloc beton C 6/7.5
- The acceptance level of welded joints "B"

5
C 6/7.5 concrete block 2. - Paharul prefabricat FP1 se monteaza prin suspendarea acestuia de
5 70 5
Caracteristici: GARD FONOABSORBANT - Detalii montare
doua tevi Ø89x5mm, sustinute fiecare de catre doua reazeme reglabile

40
80
* Clasa de importantã (P 100/92): III;
Beton egalizare C 2.8/3.5 (tip cric) asezate la max.2.00 m distanta unul de altul. SOUNDABSORBING FENCE - Assembling details
C 2.8/3.5 equalizing concrete * Categoria de importantã (HG 766/97): " C" - normalã

10
Dupa calarea prefabricatului FP1 pe orizontala si verticala, se toarna
80 blocul de beton cu marca C6/7.5. Sustinerile se inlatura dupa intarirea Characteristics: Codificare / Codification System Scara / Scale
LOT / LOT
Nr. / No
1 : 20 01 / 01
betonului monolit. * Importance class (P 100/92): III ;
* Importance category (HG 766/97): " C" - normal
E A 5 1 0 1 E 0 0 B C P M 0 0 0 1 0 0 3 0