BOOK OF STANDARDS
FORMWORKS SYSTEM
Approved By:
V 1.0 ©2016
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
FORMWORKS SYSTEM
TABLE
TABLEOFOF
CONTENTS
CONTENTS
General Application:
o Typical Hydraulic Ht = 2.4m (1st Lift)
o Applicable for succeeding lifts
o Not for Monolithic pouring with Slab
Notes: _______________________________________________________________
I. VERTICAL FORMWORKS
A. COLUMN FORMS
1. GANG FORMS
7. Lifting
Hook
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. COLUMN FORMS
1. GANG FORMS
Design Guidelines
1) Rebars must be aligned and concrete spacers must be fixed before closing the forms.
2) Plywood must be of good quality. Thickness must be at least 18mm.
3) Aluminum Beams must be spaced properly. Use a maximum spacing of 300mm.
A ≤ 300mm
B ≤ 600mm
C ≤ 900mm
D ≤ 1000mm
4) Steel Walers to be spaced according to designer’s specifications.
5) Aluminum Beams and Walers must be connected at all intersections using Aluminum Clips
2pcs per intersection.
6) Columns with width/length of 1 meter or greater must have tie rod passing through its face.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
A. COLUMN FORMS
1. GANG FORMS
Design Guidelines
7) All Tie Rods must be tightened properly. – Tie Rods at the corner and Tie Rods passing through
the Column.
8) Fix Turnbuckle to Column Waler and to ground. (At least 1 set (long and short) per side)
9) Ensure tightness of forms. (Bolts, clamps, tie rods.)
10) Platforms/Scaffoldings must be present during concrete pouring.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
A. COLUMN FORMS
2. PANEL FORMS
General Application:
o Hydraulic Ht = 2.4m – 3.3m
o Applicable for succeeding lifts
o Monolithic pouring properly designed
2. Integrated
Pin and
Wedge
3. Flat Ties
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
A. COLUMN FORMS
2. PANEL FORMS
5. Turn
Diagonal
Brace
Adaptor
Design Guidelines:
1) Rebars must be aligned and concrete spacers must be fixed before closing the forms.
2) Provide complete Pins and Wedges in each connecting side of Aluminum Panles
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
A. COLUMN FORMS
2. PANEL FORMS
Design Guidelines:
3) Provide Double Channel Walers for Pouring Height of more than 2.4m
4) Steel Walers to be spaced according to designer’s specifications
A ≤ 300mm
B ≤ 600mm
C ≤ 900mm
D ≤ 1000mm
5) Columns with width/length of 1 meter or greater must have tie rod passing through its face
6) All Tie Rods must be tightened properly. – Tie Rods at the corner and Tie Rods passing through
the Column
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
A. COLUMN FORMS
1. PANEL FORMS
7) Provide Turnbuckle fixed to the ground. At least 1 set (long and short) per side)
8) Platforms/Scaffoldings must be present during concrete pouring.
Notes: _______________________________________________________________
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL FORMS
1. GANG FORMS
2.
General Application:
o Typical Hydraulic Ht = 2.4m-3.3m (1st Lift)
o Applicable for succeeding lifts
o Not for Monolithic pouring with Skab
Notes: _______________________________________________________________
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. VERTICAL FORMWORKS
B. SHEARWALL FORMS
1. GANG FORMS
2.
7. Lifting
Hook
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
1. GANG FORMS
Design Guidelines
1) Rebars must be aligned and concrete spacers must be fixed before closing the forms.
2) Plywood must be of good quality. Thickness must be at least 18mm.
3) Aluminum Beams must be spaced properly. Use a maximum spacing of 300mm.
A ≤ 300mm
B ≤ 500mm
C ≤ 900mm
D ≤ 1000mm
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
A. SHEARWALL
1. GANG FORMS
6) Aluminum Beams and Walers must be connected at all intersections using Aluminum Clips
2pcs per intersection.
7) Tie Rods passing through the Wall must be spaced at 1.00m to 1.20m.
8) All Tie Rods must be tightened properly. – Tie Rods at the corner and Tie Rods passing through
the Column.
9) Fix Turnbuckle to Column Waler and to ground. (At least 1 set (long and short) per side)
10) Ensure tightness of forms. (Bolts, clamps, tie rods.)
11) Platforms/Scaffoldings must be present during concrete pouring.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
2. CLIMBING FORM (CRANE ASSISTED)
General Application:
o Typical Hydraulic Ht = 2.4m-3.3m (1st Lift)
o Applicable for Advance Corewall Concreting (2- 3 flrs ahead)
o Not for Monolithic pouring with Slab
o Tower Crane & Placing Boom must be taken into account
3. Climbing Point of
Cone anchorage of The
& Anchor climbing Form to
Rod the Concrete Wall
4. Internal
Platform
with Lifting
hooks
5. Flipper
arm and
Fabricated
Box for
Block out
3) Embedments are located appox. 300mm from top or as specified in the approved
fabrication drawings
4) Pocket block out depth should be at least 100mm for flipper arm to rest safely
5) Pockets can also be replaced with climbing cone if deemed necessary.
Notes: This serves as standard reference for climbing system. Refer to approved
plans specific to project for accurate details.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
2. CLIMBING FORM (CRANE ASSISTED)
Notes: This serves as standard reference for climbing system. Refer to approved
plans specific to project for accurate details.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
3. SELF CLIMBING FORM (PERI HYDRAULIC GUIDED RAIL SYSTEM – VARIO + RCS)
General Application:
o Typical Hydraulic Ht = 2.4m-3.3m (1st Lift)
o Applicable for Advance Corewall Concreting (2- 3 flrs ahead)
o Preferred for Highrise Buildings
o Not for Monolithic pouring with Slab
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
3. SELF CLIMBING FORM (PERI HYDRAULIC GUIDED RAIL SYSTEM – VARIO + RCS)
Parts & Components:
No. Equipment List Function Specification Illustration
1. Climbing Rail 348
11. Climbing Shoe
12. Wall Shoe
13. Anchoring
4. Climbing Rail
Extension
6. Diagonal Strut
7. Guardrail Post
8. Handrail Post
9. Climbing Rail
10. Extension
18. Concreting
platform
19. Carriage RCS
20. Guardrails
22. Hydraulic
Twin Hose
23. Hydraulic
Pump Unit
Design Guidelines
1) Rebars must be aligned and concrete spacers must be fixed before closing the forms
2) Typical arrangement for storey height of 3.00 up to 3.60 m
3) When recovering the lower climbing shoe during the climbing sequence, the
installed climbing rail extension must have reached the leading climbing shoe
4) For storey heights > 4.00 m, the finishing platform has to be suspended with
additional cClimbing Rail extensions
5) Distance of between Climbing Shoes where Climbing Device located: h= • 2.00 m
6) Anchor spacing = 40 cm
7) climbing rail Starter height min. = 3.60 m
8) The distance between the lowest decking and the building can be up to a maximum
of 5 cm.
Notes: Please refer to PERI Rail Climbing System RCS Handbook for complete
Design Guidelines
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
3. SELF CLIMBING FORM (PERI HYDRAULIC GUIDED RAIL SYSTEM – VARIO + RCS)
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
C. RETAINING WALL
1. AZ BEAM STRONGBACK SUPPORT (DIMENSION – ALL)
General Application:
o Typical Hydraulic Ht = 2.4m-3.3m (1st Lift)
o Applicable for succeeding lifts
o Not for Monolithic pouring with Skab
Notes: _______________________________________________________________
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
C. RETAINING WALL
1. AZ BEAM STRONGBACK SUPPORT (DIMENSION – ALL)
7. Lifting
Hook
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
C. RETAINING WALL
1. AZ BEAM STRONGBACK SUPPORT (DIMENSION – ALL)
Design Guidelines
1) Rebars must be aligned and concrete spacers must be fixed before closing the forms.
2) Plywood must be of good quality. Thickness must be at least 18mm.
3) Aluminum Beams must be spaced properly. Use a maximum spacing of 300mm.
ELEV. VIEW
PLAN VIEW
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
I. VERTICAL FORMWORKS
B. SHEARWALL
1. AZ BEAM STRONGBACK SUPPORT (DIMENSION – ALL)
2.
6) Tie Rods used as Tieback anchor must be spaced at 1.00m to 1.20m. or according to
designer’s specification
7) Fix Turnbuckle to Vertical and Horizontal Strongback (1 set composed of long and short)
8) Ensure tightness of forms. (Bolts, clamps, tie rods.)
9) Platforms/Scaffoldings must be present during concrete pouring.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
1. H-Frames (Conventional Forms)
2.
General Application:
o Slab Thickness of 125mm to 200mm
o Cast-In-Place & Translab Methodology
o Not for Monolithic pouring with Walls & Columns
o For High Elevation (max 9.0m ceiling height)
Notes: _______________________________________________________________
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
1. H-Frames (Conventional Forms)
2.
No. Equipment Function Specification Illustration
List
3. Cross Serves as Bracings
Brace for the H-Frames
4. Base Jack
5. U-Head
6. Joint Pin
7. Aluminum Connects
Clip Aluminum Beams
Joists to Girts
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
1. H-Frames (Conventional Forms)
2.
No. Equipment Function Specification Illustration
List
8. Double Servers as Beam
Pipe Side form waler
Design Guidelines
1) Ensure proper indication of location/position markings.
2) Plywood must be of good quality. Thickness must be at least 18mm.
3) For Cast-in-place Slab Thickness of 125mm to 200mm, use maximum Aluminum beam
spacing of 400mm.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
1. H-Frames (Conventional Forms)
2.
4) Overhang Length of Aluminum Beams must not be more than half of the supported length.
5) Base Jacks and U-Heads must not be extended more than half of its length.
6) Scaffolding Pipes may be used at beam sides. Use Tie Rods spaced maximum at 1.0m to
1.20m to fix the pipe walers.`
7) Set Minimum Aluminum beam Joist for Girders/Beams equal to 3 pcs. (4 or more for wider
beams)
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
1. H-Frames (Conventional Forms)
2.
8) Ensure adequate bracings both ways (horizontal & diagonal) especially on floor elevation 4.0
meter and above (max 9.0m).
rosette at spaced
at0.5 meters
4. Ringlock
ledger
6. Joint Pin
4) Overhang Length of Aluminum Beams must not be more than half of the supported length.
5) Base Jacks and U-Heads must not be extended more than half of its length.
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
2. Ringlock System
3.
6) Scaffolding Pipes may be used at beam sides. Use Tie Rods spaced maximum at 1.0m to
1.20m to fix the pipe walers.`
7) Set Minimum Aluminum beam Joist for Girders/Beams equal to 3 pcs. (4 or more for wider
beams)
2. Aluma
Truss
3. Truss
Crossbrace
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
3. Table Form
4.
No. Equipment Function Specification Illustration
List
4. Extension Serves both as Depth: 122mm,
Staff Joists for Phenolic Allowable Bending:
and Girt as 40.4 kN-m
primary support
5. U-Pin
6. Adjustable
Base Jack
7. Steel
Packer/Slab
Bearer
BOOK OF STANDARDS COSG Innovative Technology Division
Formworks System FORMWORKS DEPARTMENT
II. HORIZONTAL FORMWORKS
A. Beams and Slabs
3. Table Form (Accessories)
4.
No. Equipment Function Specification Illustration
List
8. Lowering Used to lower
Device Table Forms.
1.2m maximum
travel distance in
a two step
process.