Geotechnical Investigation Report at Location-: L9-P-15-BH-14
Geotechnical Investigation Report at Location-: L9-P-15-BH-14
Geotechnical Investigation Report at Location-: L9-P-15-BH-14
GENERAL CONSULTANT
SYSTRA-CEG-SMCIPL CONSORTIUM
CONTRACTOR
Project: MMRDA/ 9/ MMRP/ CA48:DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT AND NINE (9)
ELEVATED STATIONS (EXCLUDING ARCHITECTURAL FINISHES AND PEB ROOF STRUCTURE) INCLUDING TWO (2)
FLYOVERS, AND UNDERGROUND TWIN TUNNEL, CUT AND COVER, RAMP AND ONE (1) UNDERGROUND
STATION (INCLUDING ARCHITECTURAL FINISHES AND PEB STRUCTURES) FOR CORRIDOR OF MUMBAI METRO
LINE 9 i.e. EXTENSION OF LINE 7 FROM DAHISAR (EAST) TO MIRA BHAYANDAR AND ANDHERI TO CSIA OF
MUMBAI METRO RAIL PROJECT OF MMRDA
FINAL REPORT-R0
MAY-2020
BY
®
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
B/301, Centaur House, Shantinagar Industrial Estate, Vakola,Santacruz (East),
Mumbai-400 055, India Tel.:+91-22-49663500
Fax: +91 22 49663605, URL : www.dbm.in, E-mail: dbm@dbm.in
ANNEXURES
ANNEXURE
BOREHOLE LOGS
CLIENT: J. KUMAR InfraProjects Ltd.
PROJECT : Geotechnical Investigation Work For Mumbai Metro Line-9/7A
BORE HOLE NO : L9-P-15-BH14 LOCATION: -- DRILLING FLUID: Water DATE OF START : 02-03-20
CHAINAGE : -- TYPE OF CORE BARREL: Double Tube CORE DIAMETER: 54mm DATE OF COMPLETION : 08-03-20
CO-ORDINATES : N 2114034.515, E 274209.281 TYPE OF BIT: Diamond core bit METHOD : Rotary Type
GROUND R. L.(m): 14.051 EQUIPMENT: Hydraulic rig CASING : HQ upto 8.50m B.G.L.
GROUND W. T. : 4.50 DRILLING ORIENTATION: Vertical BORING DEPTH : 18.00m B.G.L.
FIELD DATA LABORATORY TEST RESULTS
S.P.T. BLOWS PER SHEAR CHEMICAL TEST RESULT CHEMICAL TEST RESULT OF
DEPTH IN METERS BELOW REFERENCE
SYMBOLIC PRESENTATION
COMPRESSION INDEX CC
% SAND 4.75 - 0.075mm
UNIAXIALCOMPRESSIVE
% SILT 0.075-0.002mm
WATER ABSORPTION %
PLASTICITY INDEX, Ip %
SHRINKAGE LIMIT %
ANGLE OF FRICTION
SPECIFIC GRAVITY
STRENGH, Kg/cm2
SPECIFIC GRAVITY
PLASTIC LIMIT %
LIQUID LIMIT %
Sulphates (ppm)
CLASSIFICATION
CORE PIECE NO.
Chlorides (ppm)
LABORATORY
Sulphates (%)
Chlorides (%)
DIA OF HOLE
POROSITY %
DEPTH(M)
REMARKS
N' VALUE
pH Value
pH Value
15.0cm
30.0cm
45.0cm
60.0cm
LEVEL
13.05 1.0
150mm
11.55 2.5
9.05 5.0
40 NIL NIL SP -- -- 4.50 to 6.00 Completely to highly weathered, brownish
8.55 5.5
grey, fractured BASALT (V-IV)
8.05 6.0 6.00
7.55 6.5 1 TO
NX
71 16 NIL 9 with -- -- 6.00 to 7.50 1.95 -- 2.88 2.86 0.68 -- 73.81
7.05 7.0
SP
6.55 7.5 7.50
6.05 8.0 10 TO
16
93 61 59 -- -- 7.50 to 9.00 0.16 -- 2.90 2.89 0.06 1256 --
5.55 8.5 with
SP Moderately weathered, brownish grey to
5.05 9.0 9.00 grey, fine grained BASALT (III)
17 TO 0.15 -- 2.91 2.91 0.05 1422 --
4.55 9.5
89 77 68 22 with -- -- 9.00 to 10.50
4.05 10.0 10.00 SP
NOTES : 1. Classification of soil shall be as per IS : 1498 5. Type of Core Barrel Used = Double Tube LEGENDS
2. Abbreviation used
FILL BASALT
DS = Disturbed Sample
UDS = Undisturbed Soil Sample
3. SPT = Standard Penetration Test
4. R = Refusal
S.P.T. BLOWS PER SHEAR CHEMICAL TEST RESULT CHEMICAL TEST RESULT OF
DEPTH IN METERS BELOW REFERENCE
SYMBOLIC PRESENTATION
COMPRESSION INDEX CC
% SAND 4.75 - 0.075mm
UNIAXIALCOMPRESSIVE
% SILT 0.075-0.002mm
WATER ABSORPTION %
PLASTICITY INDEX, Ip %
SHRINKAGE LIMIT %
ANGLE OF FRICTION
SPECIFIC GRAVITY
STRENGH, Kg/cm2
SPECIFIC GRAVITY
PLASTIC LIMIT %
LIQUID LIMIT %
Sulphates (ppm)
CLASSIFICATION
CORE PIECE NO.
Chlorides (ppm)
LABORATORY
Sulphates (%)
Chlorides (%)
DIA OF HOLE
POROSITY %
DEPTH(M)
REMARKS
N' VALUE
pH Value
pH Value
15.0cm
30.0cm
45.0cm
60.0cm
LEVEL
89 77 68 -- -- 9.00 to 10.50
3.55 10.5 10.50
3.05 11.0 23 TO
27
84 78 69 -- -- 10.50 to 12.00 0.09 -- 2.89 2.89 0.03 723 --
2.55 11.5 with
Moderately weathered, brownish grey to
SP
2.05 12.0 12.00 grey, fine grained BASALT (III)
1.55 12.5 28 TO
37
1.05 13.0 67 43 23 -- -- 12.00 to 13.50 0.08 -- 2.90 2.90 0.03 1429 --
with
0.55 13.5 13.50 SP
0.05 14.0 38 TO
NX
41
-0.45 14.5 92 91 91 -- -- 13.50 to 15.00 0.11 -- 2.89 2.89 0.04 2106 --
with
SP
-0.95 15.0 15.00
-1.45 15.5 42 TO
50 Moderately to slightly weathered, grey, fine
95 66 64 -- -- 15.00 to 16.50 0.14 -- 2.90 2.89 0.05 995 --
-1.95 16.0 with grained, compact BASALT (III-II)
SP
-2.45 16.5 16.50
-2.95 17.0 51 TO
59
-3.45 17.5 96 89 63 -- -- 16.50 to 18.00 0.48 -- 2.90 2.89 0.16 1937 --
with
-3.95 18.0 18.00 SP
NOTES : 1. Classification of soil shall be as per IS : 1498 5. Type of Core Barrel Used = Double Tube LEGENDS
2. Abbreviation used
FILL BASALT
DS = Disturbed Sample
UDS = Undisturbed Soil Sample
3. SPT = Standard Penetration Test
4. R = Refusal
CORELOGS
CORE LOG
Project: Geotechnical Investigation Work For J.Kumar InfraProjects Ltd. Diameter of Hole: = 76.0mm
Borehole no: L9-P-15-BH14 Depth of borehole (m): = 18.00m
Location : -- R.L.(m) = 14.051
Co-ordinates N 2114034.515, E 274209.281
1 2 3 4 5 6 7 8 9 10 11 12 13
0.00 to 3.00 -- -- -- -- -- -- -- -- -- Overburden Soil - -
1 6.00 N 35
2 6.00 M -
3 7.00 M -
Completely to highly weathered,
4 12.00 N 18
brownish grey, fractured BASALT
5 12.00 N 15
6.00 to 7.50 1 to 9 with SP 107.0 6 9.00 M - 71 NIL 7 V-IV -
7 11.00 N 4
SP 13.00 - -
8 14.00 N 48
SP 10.00 - -
9 7.00 M -
SP 8.00 - -
10 6.00 N 18
11 6.00 N 2
12 27.00 M -
7.50 to 9.00 10 to 16 with SP 140.0 13 15.00 M - 93 59 5 III -
14 12.00 N 6
SP 4.00 - - Moderately weathered, brownish
15 37.00 M - grey to grey, fine grained BASALT
16 25.00 M -
17 7.00 M -
18 A 16.00 M -
9.00 to 10.50 17 to 22 with SP 134.0 SP 8.00 - - 89 68 2 III
18 B 15.00 M -
19 10.00 M -
Prepared By: Akshay Job No. 3973
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Checked By: Saurabh Page No. 1 of 3
LEGENDS: M-Mechanical Joint; N-Natural Joint; SP-Small Pieces, I - Inclined, H - Horizontal
CORE LOG
Project: Geotechnical Investigation Work For J.Kumar InfraProjects Ltd. Diameter of Hole: = 76.0mm
Borehole no: L9-P-15-BH14 Depth of borehole (m): = 18.00m
Location : -- R.L.(m) = 14.051
Co-ordinates N 2114034.515, E 274209.281
1 2 3 4 5 6 7 8 9 10 11 12 13
SP 5.00 - -
20 45.00 M - Moderately weathered, brownish
9.00 to 10.50 17 to 22 with SP 134.0 89 68 2 III -
21 6.00 M - grey to grey, fine grained BASALT
22 22.00 M -
23 41.00 M -
24 3.00 N 55
SP 5.00 - -
10.50 to 12.00 23 to 27 with SP 126.0 84 69 3 III -
25 42.00 M -
26 27.00 N 12
27 8.00 M -
SP 7.00 - -
28 4.00 M
29 16.00 M - Moderately weathered, grey, fine
30 13.00 M - grained, BASALT
31 4.00 N 8
SP 8.00 - -
12.00 to 13.50 28 to 37 with SP 100.0 67 23 5 III -
32 8.00 M -
33 6.00 M -
34 9.00 N 16
35 3.00 N 4
36 9.00 M -
37 13.00 M -
38 71 M -
Moderately to slightly weathered,
13.50 to 15.00 38 to 40 138.0 39 54 M - 92 91 NIL III-II -
grey, fine grained, compact BASALT
40 13 M -
1 2 3 4 5 6 7 8 9 10 11 12 13
41 37.00 M -
42 7.00 N 18
43 13.00 M -
44 25.00 M -
45 21.00 M -
15.00 to 16.50 41 to 50 143.0 95 64 4 III-II -
46 4.00 N 26
47 14.00 N 48
48 5.00 M -
49 4.00 N 12
50 13.00 M -
Moderately to slightly weathered,
51 16.00 N 12
grey, fine grained, compact BASALT
52 7.00 M -
53 18.00 M -
54 24.00 M -
SP 3.00 - -
16.50 to 18.00 51 to 59 with SP 144.0 55 4.00 M - 96 63 3 III-II -
56 22.00 M -
57 7.00 M -
58 21.00 M -
59 12.00 N 2
SP 10.00 - -
Rock Piece in cm
Type of Sample
UNCONFINED COMPRESSION
TRIAXIAL
Bore hole No.
Depth in m.
Sample No
HYDROMETER ANALYSIS
SHRINKAGE LIMIT(SL)
ATTERBERG LIMIT(LL)
MOISTURE CONTENT
UNCONSOLIDATED
FREE SWELL INDEX
SPECIFIC GRAVITY
SPECIFIC GRAVITY
POISSOn'S RATIO
CONSOLIDATION
SIEVE ANALYSIS
POROSITY TEST
DIRECT SHEAR
BULK DENSITY
DRY DENSITY
UNDRAINED
SULPHATES
SULPHATES
CHLORIDES
CHLORIDES
TEST
pH
pH
4.50 - 5.10 SPT 2 200.5 GM Y Y Y Y Y Y Y Y
6.00 - 6.60 SPT 3 170.0 GM Y Y Y Y Y
10.50 - 12.00 ROCK 2 7.0 CM Y
12.00 - 13.50 ROCK 8 5.0 CM Y
P-14
13.50 - 15.00 ROCK 10 20.0 CM Y Y Y
15.00 - 16.50 ROCK 14 16.0 CM Y Y Y
16.50 - 18.00 ROCK 26 16.0 CM Y Y Y
18.00 - 19.50 ROCK 42 13.0 CM Y Y Y
PROJECT : MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai Metro Rail Project of MMRDA
SAMPLE RECEIVED ON : 06.05.2020 TESTING DURATION : 18.05.2020 TO 20.05.2020 NABL ACCREDITED LAB
CONDITION OF SAMPLES : ACCEPTABLE TYPE & NUMBER OF SAMPLES RECEIVED : SAMPLE BAG, 1 No. Certificate No.:TC-6479
Sample Type
Depth in m.
Shrinkage Limit %
Density
Compression Test
Consistency Vertical
*Relative Density
Pressure kg/cm2
Natural Moisture
Linear Shrinkage
Specific Gravity
Lab Id
Content, w %
gm/ cm3 Limits Consolidation
Unconfined
*Swelling
Remarks
Cu from
Kg/cm2
Comp. Index
Cohesion Cu
Wet Density
Dry Density
Initial Void
Index, Ip %
Ccv (Lab)
Plasticity
Plastic %
Gravel %
Liquid %
%
Sand %
kg/cm2
Clay %
Silt %
Ratio
Degree
Type
P-15 BH-14 0.00 - 3.00 DS 1 S-1302 CH ----- ----- ----- 9 8 24 59 62 26 36 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.63
NOTE: 1 The above results refer/ relate only to the sample submitted for testing.
2 No report shall be reproduced in part or full without written approval of this laboratory.
3 Any query regarding report may be reported immediately.
4 Any correction invalidates this report.
5 Tests performed under controlled room temperature/ humidity. Authorised Signatory
6 * Not under NABL Scope. (K. SHYAMSUNDER)
Head Geotech
100
Location : -----
90
80
70
60
50
40
20
10
0
GRAIN SIZE DISTRIBUTION CURVE
オ10%
オ30%
オ60%
( IS ) D10
10)
Plastic Limit, Wp
Liquid Limit, WL
Plasticity Index, Ip
% % % % mm mm mm
MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar
Job No.
P-15 BH-
:
0.00 - 3.00 CH 9 8 24 59 ----- ----- ----- ----- ----- 62 26 36 DS 1
14
3973
Certificate No. : TC-6479
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
TEST REPORT
ULR. : TC647920000000861F REPORT DATE : 25.05.2020
CLIENT : J.KUMAR INFRAPROJECTS LTD. REPORT NUMBER : DBM/3973/2020-21/032
MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai Metro Rail
PROJECT :
Project of MMRDA
SAMPLES RECEIVED ON : 06.05.2020 TESTING DURATION : 18.05.2020 TO 20.05.2020 NABL ACCREDITED LAB
CONDITION OF TYPE & NUMBER OF SAMPLES
SAMPLES
: ACCEPTABLE
RECEIVED
: CORE, 8 No.s Certificate No.:TC-6479
*Triaxial Compression
Modulus of Elasticity
Water Absorption
Point Load Index
Brazilian Test
Strength Test
Bulk Density
Dry Density
Poisson's Ratio ( )
Strength
Porosity
Condition of Test
Specific Gravity
Remarks
Sr. Bore Hole Core Depth, (RL)
Lab Id
No. No. No. m
Cohesion
gm/cm3
gm/cm3
kg/cm2
kg/cm2
kg/cm2
kg/cm2
Degree
GPa
CU
%
1 P-15-BH-14 5 6.00 - 7.50 C-5579 Soaked ----- ----- ----- ----- ----- 73.81 ----- ----- 1.95 0.68 2.86 2.88 -----
2 P-15-BH-14 12 7.50 - 9.00 C-5580 Soaked 1256 ----- ----- ----- ----- ----- ----- ----- 0.16 0.06 2.89 2.90 -----
3 P-15-BH-14 22 9.00 - 10.50 C-5581 Soaked 1422 ----- ----- ----- ----- ----- ----- ----- 0.15 0.05 2.91 2.91 -----
4 P-15-BH-14 25 10.50 - 12.00 C-5582 Soaked 723 ----- ----- ----- ----- ----- ----- ----- 0.09 0.03 2.89 2.89 -----
5 P-15-BH-14 29 12.00 - 13.50 C-5583 Soaked 1429 ----- ----- ----- ----- ----- ----- ----- 0.08 0.03 2.90 2.90 -----
6 P-15-BH-14 41 13.50 - 15.00 C-5584 Soaked 2106 ----- ----- ----- ----- ----- ----- ----- 0.11 0.04 2.89 2.89 -----
7 P-15-BH-14 50 15.00 - 16.50 C-5585 Soaked 995 ----- ----- ----- ----- ----- ----- ----- 0.14 0.05 2.89 2.90 -----
8 P-15-BH-14 58 16.50 - 18.00 C-5586 Soaked 1937 ----- ----- ----- ----- ----- ----- ----- 0.48 0.16 2.89 2.90 -----
NOTE: 1 The above results refer/ relate only to the sample submitted for testing.
2 No report shall be reproduced in part or full without written approval of this laboratory. Authorised Signatory
3 Any query regarding report may be reported immediately. (K. SHYAMSUNDER)
4 Any correction invalidates this report. Head Geotech
5 Tests performed under controlled room temperature/ humidity.
6 * Not under NABL Scope.
TEST REPORT
ULR. : TC647920000000863F REPORT DATE : 25.05.2020
MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai
PROJECT :
Metro Rail Project of MMRDA
SAMPLES RECEIVED ON : 06.05.2020 TESTING DURATION : 18.05.2020 TO 20.05.2020 NABL ACCREDITED LAB
TYPE & NUMBER OF SAMPLES
CONDITION OF SAMPLES : ACCEPTABLE
RECEIVED
: SAMPLE BAG, 1 No. Certificate No.:TC-6479
NOTE: 1 The above results refer/ relate only to the sample submitted for testing.
2 No report shall be reproduced in part or full without written approval of this laboratory.
3 Any query regarding report may be reported immediately. Authorised Signatory
4 Any correction invalidates this report.
(MANISH DAVE)
5 Tests performed under controlled room temperature/ humidity.
TECHNICAL MANAGER
6 * Not under NABL Scope.
15.00 15.00
13.00 13.00
(I ) DS1 (I )
12.00 12.00
10.00 40 NIL
G.W.T.@ 10.00
4.50m GL
9.00 9.00
40 NIL
8.00 8.00
6.00 6.00
93 59
5.00 5.00
4.00 89 68 4.00
(I V )
3.00 3.00
84 69 (I V )
2.00 2.00
1.00 67 23 1.00
LEGEND :
±0.00 ±0.00 LAY ERS
92 91
( I ) FILL ( III ) BOULDERS
-1.00 -1.00
( II ) RESIDUAL SOIL ( IV ) BASALT
( SAND / CLAY )
-2.00 95 64 -2.00
ABBREV I AT I ONS :
GL GROUND
: LEVEL R : REFUSAL 'N' VALUE
-3.00 -3.00 DS DISTURBED
:
UDS UNDISTURBED
:
SAMPLE
SOIL SAMPLE
RQD
CR
:
:
ROCK QUALITY DESIGNATION (%)
CORE RECOVERY (%)
96 63 N SPT
: VALUE(30cm PENETRATION) GWT : GROUND WATER TABLE
COREBOX PHOTOGRAPHS
Geotechnical Investigation For Mumbai Metro Line 9/7A
(COREBOX PHOTOGRAPHS)
FIELD BORELOG
Scanned with CamScanner
Scanned with CamScanner
APPENDIX
Uplift Pile Capacity = (0.7 X Ultimate frictional Resistrence)/2.5 + Dead weight of Pile
= 920.9 kN
Lateral Load, H (T) = 92.09 T
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1
= 357.4 kN
Lateral Load, H (T) = 35.74 T
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1
Vertical Pile Capacity: (as per IRC 78 2014)
Pile Type = Bored Cast In Situ Pile Socket Length = 1 D
Pier No = P-15 BH- 14 Length of socket/Diameter, L/D = 1
Reference borehole = P-15 BH- 14 Depth factor = 1 + 0.4 (L/D) = 1.4
Diameter of pile = 1200 mm Depth Factor, df = 1.2
2
C/s Area of pile = 1130973 mm Selected Design Method = I
Grade of Concrete = M 35 Nc = 9
Grade of Steel = Fe 500 Cub = 1.2
Density of concrete = 2.50 T/m 3 Cus = 0.7
Start of rock = 6.00 m
Depth of borehole = 18.00 m
Thickness of drill run = 1.5 m
No of sections required = 8 Nos
Uplift Pile Capacity = (0.7 X Ultimate frictional Resistrence)/2.5 + Dead weight of Pile
= 1233 kN
Lateral Load, H (T) = 123.3 T
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1
= 478.5 kN
Lateral Load, H (T) = 47.85 T