MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY

GENERAL CONSULTANT

SYSTRA-CEG-SMCIPL CONSORTIUM
CONTRACTOR

J. KUMAR INFRAPROJECTS LTD.

Geotechnical Investigation Report at


Location-L9-P-15-BH-14

Project: MMRDA/ 9/ MMRP/ CA48:DESIGN AND CONSTRUCTION OF ELEVATED VIADUCT AND NINE (9)
ELEVATED STATIONS (EXCLUDING ARCHITECTURAL FINISHES AND PEB ROOF STRUCTURE) INCLUDING TWO (2)
FLYOVERS, AND UNDERGROUND TWIN TUNNEL, CUT AND COVER, RAMP AND ONE (1) UNDERGROUND
STATION (INCLUDING ARCHITECTURAL FINISHES AND PEB STRUCTURES) FOR CORRIDOR OF MUMBAI METRO
LINE 9 i.e. EXTENSION OF LINE 7 FROM DAHISAR (EAST) TO MIRA BHAYANDAR AND ANDHERI TO CSIA OF
MUMBAI METRO RAIL PROJECT OF MMRDA

Revision Description J. Kumar Infraprojects Ltd. General Consultant


Prepared by Checked by Checked by Approved by
R0 For Approval
J.Kumar Infraprojects Ltd.

FINAL REPORT ON GEOTECHNICAL


INVESTIGATION
FOR
MUMBAI METRO LINE 9/7A
MUMBAI, MAHARASHTRA

For Borehole No. L9-P-15-BH-14

FINAL REPORT-R0
MAY-2020

BY

®
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
B/301, Centaur House, Shantinagar Industrial Estate, Vakola,Santacruz (East),
Mumbai-400 055, India Tel.:+91-22-49663500
Fax: +91 22 49663605, URL : www.dbm.in, E-mail: dbm@dbm.in
ANNEXURES
ANNEXURE

BOREHOLE LOGS
CLIENT: J. KUMAR InfraProjects Ltd.
PROJECT : Geotechnical Investigation Work For Mumbai Metro Line-9/7A
BORE HOLE NO : L9-P-15-BH14 LOCATION: -- DRILLING FLUID: Water DATE OF START : 02-03-20
CHAINAGE : -- TYPE OF CORE BARREL: Double Tube CORE DIAMETER: 54mm DATE OF COMPLETION : 08-03-20
CO-ORDINATES : N 2114034.515, E 274209.281 TYPE OF BIT: Diamond core bit METHOD : Rotary Type
GROUND R. L.(m): 14.051 EQUIPMENT: Hydraulic rig CASING : HQ upto 8.50m B.G.L.
GROUND W. T. : 4.50 DRILLING ORIENTATION: Vertical BORING DEPTH : 18.00m B.G.L.
FIELD DATA LABORATORY TEST RESULTS

COMPOSITION, DEGREE OF WEATHERING


COLOUR, GRAIN SIZE, TEXTURE, MINERAL
DEPTH OF SAMPLING BELOW REFERENCE

S.P.T. BLOWS PER SHEAR CHEMICAL TEST RESULT CHEMICAL TEST RESULT OF
DEPTH IN METERS BELOW REFERENCE

TESTS ON ROCK CORES


15.00cm PARAMETERS OF SOIL SAMPLES. WATER SAMPLES.

DESCRIPTION OF CORE, ROCK TYPE,

TYPE OF TEST CONDUCTED IN THE


RATE OF PENETRATION (mm/min)

% NATURAL MOISTURE CONTENT


ROCK QUALITY DESIGNATION (%)
ELEVATION IN METERS (WRT.RL.)

LEVEL OF WATER TABLE/L.W.L.

SLAKE DURABILITY INDEX (%)


POINT LOAD INDEX, Kg/cm2
SOLID CORE RECOVERY (%)

SYMBOLIC PRESENTATION

SWELL PRESSURE, kg/cm2


COHESION'Cu' IN Kg/cm2
SAMPLE REFERENCE NO.

COMPRESSION INDEX CC
% SAND 4.75 - 0.075mm

UNIAXIALCOMPRESSIVE
% SILT 0.075-0.002mm

WATER ABSORPTION %
PLASTICITY INDEX, Ip %

BULK DENSITY, gm/cm3


NATURE OF SAMPLING

WET DENSITY, gm/cm3

DRY DENSITY , gm/cm3

DRY DENSITY, gm/cm3


FREE SWELL INDEX %
FRACTURE INDEX (FI)

% GRAVEL > 4.75mm


CORE RECOVERY (%)

SHRINKAGE LIMIT %

ANGLE OF FRICTION

INITIAL VOID RATIO


% CLAY <0.002mm

SPECIFIC GRAVITY

STRENGH, Kg/cm2
SPECIFIC GRAVITY
PLASTIC LIMIT %
LIQUID LIMIT %

Sulphates (ppm)
CLASSIFICATION
CORE PIECE NO.

Chlorides (ppm)
LABORATORY

Sulphates (%)
Chlorides (%)
DIA OF HOLE

POROSITY %
DEPTH(M)

REMARKS
N' VALUE

pH Value

pH Value
15.0cm

30.0cm

45.0cm

60.0cm
LEVEL

14.05 0.0 0.00


DS 1
3.00
CH 9 8 24 59 62 26 36 -- -- -- -- 2.63 8.10 0.030 0.010
13.55 0.5

13.05 1.0
150mm

12.55 1.5 Fill (Overburden soil with concrete and


0.00 to 3.00
boulders, etc)
12.05 2.0

11.55 2.5

11.05 3.0 SPT 3.00 1 12 52 - - R


10.55 3.5 3.30

10.05 4.0 40 NIL NIL SP -- -- 3.00 to 4.50

9.55 4.5 4.50

9.05 5.0
40 NIL NIL SP -- -- 4.50 to 6.00 Completely to highly weathered, brownish
8.55 5.5
grey, fractured BASALT (V-IV)
8.05 6.0 6.00

7.55 6.5 1 TO
NX
71 16 NIL 9 with -- -- 6.00 to 7.50 1.95 -- 2.88 2.86 0.68 -- 73.81
7.05 7.0
SP
6.55 7.5 7.50

6.05 8.0 10 TO
16
93 61 59 -- -- 7.50 to 9.00 0.16 -- 2.90 2.89 0.06 1256 --
5.55 8.5 with
SP Moderately weathered, brownish grey to
5.05 9.0 9.00 grey, fine grained BASALT (III)
17 TO 0.15 -- 2.91 2.91 0.05 1422 --
4.55 9.5
89 77 68 22 with -- -- 9.00 to 10.50
4.05 10.0 10.00 SP

NOTES : 1. Classification of soil shall be as per IS : 1498 5. Type of Core Barrel Used = Double Tube LEGENDS
2. Abbreviation used
FILL BASALT
DS = Disturbed Sample
UDS = Undisturbed Soil Sample
3. SPT = Standard Penetration Test
4. R = Refusal

Prepared by Checked By JOB NO. Page No.


Akshay Chavan Saurabh Deshpande 3973 1 of 2
CLIENT: J. KUMAR InfraProjects Ltd.
PROJECT : Geotechnical Investigation Work For Mumbai Metro Line-9/7A
BORE HOLE NO : L9-P-15-BH14 LOCATION: -- DRILLING FLUID: Water DATE OF START : 02-03-20
CHAINAGE : -- TYPE OF CORE BARREL: Double Tube CORE DIAMETER: 54mm DATE OF COMPLETION : 08-03-20
CO-ORDINATES : N 2114034.515, E 274209.281 TYPE OF BIT: Diamond core bit METHOD : Rotary Type
GROUND R. L.(m): 14.051 EQUIPMENT: Hydraulic rig CASING : HQ upto 8.50m B.G.L.
GROUND W. T. : 4.50 DRILLING ORIENTATION: Vertical BORING DEPTH : 18.00m B.G.L.
FIELD DATA LABORATORY TEST RESULTS

COMPOSITION, DEGREE OF WEATHERING


COLOUR, GRAIN SIZE, TEXTURE, MINERAL
DEPTH OF SAMPLING BELOW REFERENCE

S.P.T. BLOWS PER SHEAR CHEMICAL TEST RESULT CHEMICAL TEST RESULT OF
DEPTH IN METERS BELOW REFERENCE

TESTS ON ROCK CORES


15.00cm PARAMETERS OF SOIL SAMPLES. WATER SAMPLES.

DESCRIPTION OF CORE, ROCK TYPE,

TYPE OF TEST CONDUCTED IN THE


RATE OF PENETRATION (mm/min)

% NATURAL MOISTURE CONTENT


ROCK QUALITY DESIGNATION (%)
ELEVATION IN METERS (WRT.RL.)

LEVEL OF WATER TABLE/L.W.L.

SLAKE DURABILITY INDEX (%)


POINT LOAD INDEX, Kg/cm2
SOLID CORE RECOVERY (%)

SYMBOLIC PRESENTATION

SWELL PRESSURE, kg/cm2


COHESION'Cu' IN Kg/cm2
SAMPLE REFERENCE NO.

COMPRESSION INDEX CC
% SAND 4.75 - 0.075mm

UNIAXIALCOMPRESSIVE
% SILT 0.075-0.002mm

WATER ABSORPTION %
PLASTICITY INDEX, Ip %

BULK DENSITY, gm/cm3


NATURE OF SAMPLING

WET DENSITY, gm/cm3

DRY DENSITY , gm/cm3

DRY DENSITY, gm/cm3


FREE SWELL INDEX %
FRACTURE INDEX (FI)

% GRAVEL > 4.75mm


CORE RECOVERY (%)

SHRINKAGE LIMIT %

ANGLE OF FRICTION

INITIAL VOID RATIO


% CLAY <0.002mm

SPECIFIC GRAVITY

STRENGH, Kg/cm2
SPECIFIC GRAVITY
PLASTIC LIMIT %
LIQUID LIMIT %

Sulphates (ppm)
CLASSIFICATION
CORE PIECE NO.

Chlorides (ppm)
LABORATORY

Sulphates (%)
Chlorides (%)
DIA OF HOLE

POROSITY %
DEPTH(M)

REMARKS
N' VALUE

pH Value

pH Value
15.0cm

30.0cm

45.0cm

60.0cm
LEVEL

89 77 68 -- -- 9.00 to 10.50
3.55 10.5 10.50

3.05 11.0 23 TO
27
84 78 69 -- -- 10.50 to 12.00 0.09 -- 2.89 2.89 0.03 723 --
2.55 11.5 with
Moderately weathered, brownish grey to
SP
2.05 12.0 12.00 grey, fine grained BASALT (III)

1.55 12.5 28 TO
37
1.05 13.0 67 43 23 -- -- 12.00 to 13.50 0.08 -- 2.90 2.90 0.03 1429 --
with
0.55 13.5 13.50 SP

0.05 14.0 38 TO
NX

41
-0.45 14.5 92 91 91 -- -- 13.50 to 15.00 0.11 -- 2.89 2.89 0.04 2106 --
with
SP
-0.95 15.0 15.00

-1.45 15.5 42 TO
50 Moderately to slightly weathered, grey, fine
95 66 64 -- -- 15.00 to 16.50 0.14 -- 2.90 2.89 0.05 995 --
-1.95 16.0 with grained, compact BASALT (III-II)
SP
-2.45 16.5 16.50

-2.95 17.0 51 TO
59
-3.45 17.5 96 89 63 -- -- 16.50 to 18.00 0.48 -- 2.90 2.89 0.16 1937 --
with
-3.95 18.0 18.00 SP
NOTES : 1. Classification of soil shall be as per IS : 1498 5. Type of Core Barrel Used = Double Tube LEGENDS
2. Abbreviation used
FILL BASALT
DS = Disturbed Sample
UDS = Undisturbed Soil Sample
3. SPT = Standard Penetration Test
4. R = Refusal

Prepared by Checked By JOB NO. Page No.


Akshay Chavan Saurabh Deshpande 3973 2 of 2
ANNEXURE

CORELOGS
CORE LOG
Project: Geotechnical Investigation Work For J.Kumar InfraProjects Ltd. Diameter of Hole: = 76.0mm
Borehole no: L9-P-15-BH14 Depth of borehole (m): = 18.00m
Location : -- R.L.(m) = 14.051
Co-ordinates N 2114034.515, E 274209.281

Length of Nature of Angle of


Core Rock Quality
Core Length of Fracture at Joint with Fracture Weathering Other Test /
Core Dril Run (m) Serial No. of Core Pieces Piece No. Recovery Designation Petrographic Description
Recovered Piece (cm) Lower End Vertical Index Grade Observations
(%) (%)
(cm ) of Piece (Degree)

1 2 3 4 5 6 7 8 9 10 11 12 13
0.00 to 3.00 -- -- -- -- -- -- -- -- -- Overburden Soil - -

3.00 to 4.50 SP 60.0 SP 60.00 -- -- 40 NIL N.I. V-IV -

4.50 to 6.00 SP 60.0 SP 60.00 -- -- 40 NIL N.I. V-IV -

1 6.00 N 35
2 6.00 M -
3 7.00 M -
Completely to highly weathered,
4 12.00 N 18
brownish grey, fractured BASALT
5 12.00 N 15
6.00 to 7.50 1 to 9 with SP 107.0 6 9.00 M - 71 NIL 7 V-IV -
7 11.00 N 4
SP 13.00 - -
8 14.00 N 48
SP 10.00 - -
9 7.00 M -
SP 8.00 - -
10 6.00 N 18
11 6.00 N 2
12 27.00 M -
7.50 to 9.00 10 to 16 with SP 140.0 13 15.00 M - 93 59 5 III -
14 12.00 N 6
SP 4.00 - - Moderately weathered, brownish
15 37.00 M - grey to grey, fine grained BASALT
16 25.00 M -
17 7.00 M -
18 A 16.00 M -
9.00 to 10.50 17 to 22 with SP 134.0 SP 8.00 - - 89 68 2 III
18 B 15.00 M -
19 10.00 M -
Prepared By: Akshay Job No. 3973
DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Checked By: Saurabh Page No. 1 of 3
LEGENDS: M-Mechanical Joint; N-Natural Joint; SP-Small Pieces, I - Inclined, H - Horizontal
CORE LOG
Project: Geotechnical Investigation Work For J.Kumar InfraProjects Ltd. Diameter of Hole: = 76.0mm
Borehole no: L9-P-15-BH14 Depth of borehole (m): = 18.00m
Location : -- R.L.(m) = 14.051
Co-ordinates N 2114034.515, E 274209.281

Length of Nature of Angle of


Core Rock Quality
Core Length of Fracture at Joint with Fracture Weathering Other Test /
Core Dril Run (m) Serial No. of Core Pieces Piece No. Recovery Designation Petrographic Description
Recovered Piece (cm) Lower End Vertical Index Grade Observations
(%) (%)
(cm ) of Piece (Degree)

1 2 3 4 5 6 7 8 9 10 11 12 13
SP 5.00 - -
20 45.00 M - Moderately weathered, brownish
9.00 to 10.50 17 to 22 with SP 134.0 89 68 2 III -
21 6.00 M - grey to grey, fine grained BASALT
22 22.00 M -
23 41.00 M -
24 3.00 N 55
SP 5.00 - -
10.50 to 12.00 23 to 27 with SP 126.0 84 69 3 III -
25 42.00 M -
26 27.00 N 12
27 8.00 M -
SP 7.00 - -
28 4.00 M
29 16.00 M - Moderately weathered, grey, fine
30 13.00 M - grained, BASALT
31 4.00 N 8
SP 8.00 - -
12.00 to 13.50 28 to 37 with SP 100.0 67 23 5 III -
32 8.00 M -
33 6.00 M -
34 9.00 N 16
35 3.00 N 4
36 9.00 M -
37 13.00 M -
38 71 M -
Moderately to slightly weathered,
13.50 to 15.00 38 to 40 138.0 39 54 M - 92 91 NIL III-II -
grey, fine grained, compact BASALT
40 13 M -

Prepared By: Akshay Job No. 3973


DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Checked By: Saurabh Page No. 2 of 3
LEGENDS: M-Mechanical Joint; N-Natural Joint; SP-Small Pieces, I - Inclined, H - Horizontal
CORE LOG
Project: Geotechnical Investigation Work For J.Kumar InfraProjects Ltd. Diameter of Hole: = 76.0mm
Borehole no: L9-P-15-BH14 Depth of borehole (m): = 18.00m
Location : -- R.L.(m) = 14.051
Co-ordinates N 2114034.515, E 274209.281

Length of Nature of Angle of


Core Rock Quality
Core Length of Fracture at Joint with Fracture Weathering Other Test /
Core Dril Run (m) Serial No. of Core Pieces Piece No. Recovery Designation Petrographic Description
Recovered Piece (cm) Lower End Vertical Index Grade Observations
(%) (%)
(cm ) of Piece (Degree)

1 2 3 4 5 6 7 8 9 10 11 12 13
41 37.00 M -
42 7.00 N 18
43 13.00 M -
44 25.00 M -
45 21.00 M -
15.00 to 16.50 41 to 50 143.0 95 64 4 III-II -
46 4.00 N 26
47 14.00 N 48
48 5.00 M -
49 4.00 N 12
50 13.00 M -
Moderately to slightly weathered,
51 16.00 N 12
grey, fine grained, compact BASALT
52 7.00 M -
53 18.00 M -
54 24.00 M -
SP 3.00 - -
16.50 to 18.00 51 to 59 with SP 144.0 55 4.00 M - 96 63 3 III-II -
56 22.00 M -
57 7.00 M -
58 21.00 M -
59 12.00 N 2
SP 10.00 - -

Prepared By: Akshay Job No. 3973


DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.
Checked By: Saurabh Page No. 3 of 3
LEGENDS: M-Mechanical Joint; N-Natural Joint; SP-Small Pieces, I - Inclined, H - Horizontal
ANNEXURE

LABORATORY TEST RESULTS


Project : J.KUMAR MUMBAI METRO LINE-9/7A

DBM Job No. 3973 LOT - 11 DATE: 06.05.2020

Weight of soil sample in gm/ Length of


TESTS ON SOIL SAMPLES CHEMICAL ANALYSIS

POINT LOAD STRENGTH INDEX


UNIAXIAL COMPRESSION TEST
CHEMICAL ANALYSIS CHEMICAL ANALYSIS

Rock Piece in cm
Type of Sample

UNCONFINED COMPRESSION
TRIAXIAL
Bore hole No.

Depth in m.

MODULUS OF ELASITCITY &


SOIL WATER

Sample No

HYDROMETER ANALYSIS

WATER ABSORPTION &


ATTERBERG LIMIT(PL)

SHRINKAGE LIMIT(SL)
ATTERBERG LIMIT(LL)
MOISTURE CONTENT

UNCONSOLIDATED
FREE SWELL INDEX

SPECIFIC GRAVITY
SPECIFIC GRAVITY

POISSOn'S RATIO
CONSOLIDATION
SIEVE ANALYSIS

POROSITY TEST
DIRECT SHEAR
BULK DENSITY

DRY DENSITY
UNDRAINED

SULPHATES

SULPHATES
CHLORIDES

CHLORIDES
TEST

pH

pH
4.50 - 5.10 SPT 2 200.5 GM Y Y Y Y Y Y Y Y
6.00 - 6.60 SPT 3 170.0 GM Y Y Y Y Y
10.50 - 12.00 ROCK 2 7.0 CM Y
12.00 - 13.50 ROCK 8 5.0 CM Y
P-14
13.50 - 15.00 ROCK 10 20.0 CM Y Y Y
15.00 - 16.50 ROCK 14 16.0 CM Y Y Y
16.50 - 18.00 ROCK 26 16.0 CM Y Y Y
18.00 - 19.50 ROCK 42 13.0 CM Y Y Y

0.00 - 3.00 DS 1 450.5 GM Y Y Y Y Y Y Y Y


6.00 - 7.50 ROCK 5 7.0 CM Y
7.50 - 9.00 ROCK 12 23.0 CM Y Y Y
9.00 - 10.50 ROCK 22 12.0 CM Y Y Y
P-15 BH-14 10.50 - 12.00 ROCK 25 37.0 CM Y Y Y
12.00 - 13.50 ROCK 29 10.0 CM Y Y Y
13.50 - 15.00 ROCK 41 15.0 CM Y Y Y
15.00 - 16.50 ROCK 50 15.0 CM Y Y Y
16.50 - 18.00 ROCK 58 16.0 CM Y Y Y

3.00 - 3.60 SPT 1 514.0 GM Y Y Y Y Y Y Y Y


4.50 - 5.10 SPT 2 400.5 GM Y Y Y Y Y
9.00 - 10.50 ROCK 8 18.0 CM Y Y Y
10.50 - 12.00 ROCK 14 16.0 CM Y Y Y
P-21 BH-15
12.00 - 13.50 ROCK 22 14.0 CM Y Y Y
13.50 - 15.00 ROCK 28 22.0 CM Y Y Y
15.00 - 16.50 ROCK 34 23.0 CM Y Y Y
16.50 - 18.00 ROCK 41 33.0 CM Y Y Y

4.50 - 5.10 SPT 2 300.0 GM Y Y Y Y Y Y Y Y


6.00 - 6.60 SPT 3 360.5 GM Y Y Y Y Y
6.00 - 7.50 ROCK 2 7.0 CM Y
9.00 - 10.50 ROCK 10 12.0 CM Y Y Y
ST-11 BH-01 10.50 - 12.00 ROCK 15 9.0 CM Y
12.00 - 13.50 ROCK 26 7.0 CM Y
13.50 - 15.00 ROCK 37 8.0 CM Y
15.00 - 16.50 ROCK 53 26.0 CM Y Y Y
16.50 - 18.00 ROCK 63 14.0 CM Y Y Y
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.
TEST REPORT
ULR. : TC647920000000862F REPORT DATE : 25.05.2020
CLIENT : J.KUMAR INFRAPROJECTS LTD. REPORT NUMBER : DBM/3973/2020-21/033

PROJECT : MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai Metro Rail Project of MMRDA
SAMPLE RECEIVED ON : 06.05.2020 TESTING DURATION : 18.05.2020 TO 20.05.2020 NABL ACCREDITED LAB
CONDITION OF SAMPLES : ACCEPTABLE TYPE & NUMBER OF SAMPLES RECEIVED : SAMPLE BAG, 1 No. Certificate No.:TC-6479

MECHANICAL TEST RESULTS (SOIL)


Tests Performed and References

Soil Classification (I.S)


IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 IS 2720 P-
IS 2720 P-4 IS 2720 P-5
P-7,8 P-2 P-20 P-6 P-14 P-11/12/13 P-10 P-41 P-40 P-15 3(S1)
Bore Hole No.

Sample Type
Depth in m.

Shrinkage Limit %
Density

Compression Test
Consistency Vertical

*Relative Density

Pressure kg/cm2
Natural Moisture

Linear Shrinkage

Free swell index

Specific Gravity
Lab Id

Mechanical Analysis Shear Test

Content, w %
gm/ cm3 Limits Consolidation

Unconfined

*Swelling

Remarks
Cu from

Kg/cm2

Comp. Index
Cohesion Cu
Wet Density

Dry Density

Initial Void
Index, Ip %

Ccv (Lab)
Plasticity
Plastic %
Gravel %

Liquid %

%
Sand %

kg/cm2
Clay %
Silt %

Ratio
Degree
Type
P-15 BH-14 0.00 - 3.00 DS 1 S-1302 CH ----- ----- ----- 9 8 24 59 62 26 36 ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- ----- 2.63

NOTE: 1 The above results refer/ relate only to the sample submitted for testing.
2 No report shall be reproduced in part or full without written approval of this laboratory.
3 Any query regarding report may be reported immediately.
4 Any correction invalidates this report.
5 Tests performed under controlled room temperature/ humidity. Authorised Signatory
6 * Not under NABL Scope. (K. SHYAMSUNDER)
Head Geotech

Lab Address : DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.


L-63, MIDC, TALOJA, TAL.-PANVEL,DIST.-RAIGAD,MAHARASHTRA - 410208
PH - 022 27410652, 022 49663500, EMAIL - lab@dbm.in,WEB : www.dbm.in
Particle GRAVEL SAND SILT CLAY
C F C M F
Size(mm)
80.0 20.0 4.75 2.00 0.425 75x10-3 2x10-3
Project :

100
Location : -----
90

80

70

60

50

40

PERCENTAGE FINER THAN


30

20

10

0
GRAIN SIZE DISTRIBUTION CURVE

DBM GEOTECHNICS & CONSTRUCTIONS PVT. LTD.


100 10 1 0.1 0.01 0.001 0.0001
PARTICLE SIZE ( mm )
and Andheri to CSIA of Mumbai Metro Rail Project of MMRDA

Tel.:+91-22-49663500, Fax: +91 22 49663605, E-mail: dbm@dbm.in, URL: www.dbm.in


Coeff. Of
Gravel Sand Silt Clay Coeff. of
Classifi- Curvature

オ10%
オ30%
オ60%

Bore Hole Uniformity,


Symbol Depth in m. -cation Cc =
No. Cu = D60 /
D302/(D60*D
Remarks

( IS ) D10
10)
Plastic Limit, Wp

Liquid Limit, WL
Plasticity Index, Ip

% % % % mm mm mm
MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar

Job No.
P-15 BH-

:
0.00 - 3.00 CH 9 8 24 59 ----- ----- ----- ----- ----- 62 26 36 DS 1
14

3973
Certificate No. : TC-6479
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

TEST REPORT
ULR. : TC647920000000861F REPORT DATE : 25.05.2020
CLIENT : J.KUMAR INFRAPROJECTS LTD. REPORT NUMBER : DBM/3973/2020-21/032
MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai Metro Rail
PROJECT :
Project of MMRDA
SAMPLES RECEIVED ON : 06.05.2020 TESTING DURATION : 18.05.2020 TO 20.05.2020 NABL ACCREDITED LAB
CONDITION OF TYPE & NUMBER OF SAMPLES
SAMPLES
: ACCEPTABLE
RECEIVED
: CORE, 8 No.s Certificate No.:TC-6479

MECHANICAL TEST RESULTS (ROCK)


Test Method References: IS 9143 IS 9221 IS 13047 IS 8764 IS 10082 IS 10050 IS 13030

*Triaxial Compression

Slake Durability Index


Uniaxial Compressive

Modulus of Elasticity

Water Absorption
Point Load Index

Brazilian Test
Strength Test

Bulk Density
Dry Density
Poisson's Ratio ( )
Strength

Porosity
Condition of Test

Specific Gravity

Remarks
Sr. Bore Hole Core Depth, (RL)
Lab Id
No. No. No. m

Cohesion

gm/cm3

gm/cm3
kg/cm2

kg/cm2
kg/cm2
kg/cm2

Degree
GPa

CU

%
1 P-15-BH-14 5 6.00 - 7.50 C-5579 Soaked ----- ----- ----- ----- ----- 73.81 ----- ----- 1.95 0.68 2.86 2.88 -----

2 P-15-BH-14 12 7.50 - 9.00 C-5580 Soaked 1256 ----- ----- ----- ----- ----- ----- ----- 0.16 0.06 2.89 2.90 -----

3 P-15-BH-14 22 9.00 - 10.50 C-5581 Soaked 1422 ----- ----- ----- ----- ----- ----- ----- 0.15 0.05 2.91 2.91 -----

4 P-15-BH-14 25 10.50 - 12.00 C-5582 Soaked 723 ----- ----- ----- ----- ----- ----- ----- 0.09 0.03 2.89 2.89 -----

5 P-15-BH-14 29 12.00 - 13.50 C-5583 Soaked 1429 ----- ----- ----- ----- ----- ----- ----- 0.08 0.03 2.90 2.90 -----

6 P-15-BH-14 41 13.50 - 15.00 C-5584 Soaked 2106 ----- ----- ----- ----- ----- ----- ----- 0.11 0.04 2.89 2.89 -----

7 P-15-BH-14 50 15.00 - 16.50 C-5585 Soaked 995 ----- ----- ----- ----- ----- ----- ----- 0.14 0.05 2.89 2.90 -----

8 P-15-BH-14 58 16.50 - 18.00 C-5586 Soaked 1937 ----- ----- ----- ----- ----- ----- ----- 0.48 0.16 2.89 2.90 -----

NOTE: 1 The above results refer/ relate only to the sample submitted for testing.
2 No report shall be reproduced in part or full without written approval of this laboratory. Authorised Signatory
3 Any query regarding report may be reported immediately. (K. SHYAMSUNDER)
4 Any correction invalidates this report. Head Geotech
5 Tests performed under controlled room temperature/ humidity.
6 * Not under NABL Scope.

Lab Address : DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.


L-63, MIDC, TALOJA, TAL.-PANVEL,DIST.-RAIGAD,MAHARASHTRA - 410208
PH - 022 27410652, 022 49663500, EMAIL - lab@dbm.in,WEB : www.dbm.in
DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.

TEST REPORT
ULR. : TC647920000000863F REPORT DATE : 25.05.2020

CLIENT : J.KUMAR INFRAPROJECTS LTD. REPORT NUMBER : DBM/3973/2020-21/034

MUMBAI METRO LINE 9 extension of line 7 from Dahisar (East) to Mira Bhayandar and Andheri to CSIA of Mumbai
PROJECT :
Metro Rail Project of MMRDA
SAMPLES RECEIVED ON : 06.05.2020 TESTING DURATION : 18.05.2020 TO 20.05.2020 NABL ACCREDITED LAB
TYPE & NUMBER OF SAMPLES
CONDITION OF SAMPLES : ACCEPTABLE
RECEIVED
: SAMPLE BAG, 1 No. Certificate No.:TC-6479

CHEMICAL ANALYSIS OF SOIL


Test Method Reference: IS 2720 P-26 IS 2720 P-27 BS 1377 P-3 IS 2720 P-22

Bore Hole Sulphate as Chloride as *Organic Matter


Sr. No. Lab Id Depth (m) Type of Sample pH Remarks
No. SO3 (%) Cl (%) (%)

1 P-15 BH-14 S-1302 0.00 - 3.00 DS - 01 8.10 0.010 0.030 ------

NOTE: 1 The above results refer/ relate only to the sample submitted for testing.
2 No report shall be reproduced in part or full without written approval of this laboratory.
3 Any query regarding report may be reported immediately. Authorised Signatory
4 Any correction invalidates this report.
(MANISH DAVE)
5 Tests performed under controlled room temperature/ humidity.
TECHNICAL MANAGER
6 * Not under NABL Scope.

Lab Address : DBM GEOTECHNICS AND CONSTRUCTIONS PVT. LTD.


L-63, MIDC, TALOJA, TAL.-PANVEL,DIST.-RAIGAD,MAHARASHTRA - 410208
PH - 022 27410652, 022 49663500, EMAIL - lab@dbm.in,WEB : www.dbm.in
ANNEXURE

SUB SURFACE PROFILE


G.L.16.00m P-1 5 -BH -1 4 G.L.16.00m

15.00 15.00

14.00 G.L.14.051 m 14.00

13.00 13.00
(I ) DS1 (I )
12.00 12.00

11.00 N=R 11.00


TCR% RQD%

10.00 40 NIL
G.W.T.@ 10.00
4.50m GL
9.00 9.00
40 NIL
8.00 8.00

7.00 71 NIL 7.00

6.00 6.00
93 59
5.00 5.00

4.00 89 68 4.00
(I V )
3.00 3.00
84 69 (I V )
2.00 2.00

1.00 67 23 1.00

LEGEND :
±0.00 ±0.00 LAY ERS
92 91
( I ) FILL ( III ) BOULDERS
-1.00 -1.00
( II ) RESIDUAL SOIL ( IV ) BASALT
( SAND / CLAY )

-2.00 95 64 -2.00
ABBREV I AT I ONS :
GL GROUND
: LEVEL R : REFUSAL 'N' VALUE
-3.00 -3.00 DS DISTURBED
:
UDS UNDISTURBED
:
SAMPLE
SOIL SAMPLE
RQD
CR
:
:
ROCK QUALITY DESIGNATION (%)
CORE RECOVERY (%)
96 63 N SPT
: VALUE(30cm PENETRATION) GWT : GROUND WATER TABLE

-4.00 -4.00 CLI ENT :


(-3.949m) J . K U M AR I N FRAPROJ ECT S Ltd.
-5.00 -5.00
T I T LE :
Sub Surface Profile Through Bore Holes for Geotechnical Investigation Work for
Mumbai Metro Line-9/7A
-6.00 -6.00
DBM GEOT ECH N I CS AN D CON ST RUCT I ONS PVT . LT D.
DBM B-301, Centaur House, 3rd Floor, Shantinagar Industrial Estate, Vakola,Santacruz (E),
Mumbai- 400 055 Tel.:+91-22-49663500.Fax: +91 22 33863605,
E-mail: dbm@dbm.in, URL : www.dbm.in
Drawn By : Akshay Chavan Date : May-2020
Checked By : Saurabh Deshpande Scale : H:- NTS, V:- 1.100
Appr. by. : Dhiraj Patil Drg.No. : DBM/drg/3973/J/K/SSP-15
ANNEXURE

COREBOX PHOTOGRAPHS
Geotechnical Investigation For Mumbai Metro Line 9/7A
(COREBOX PHOTOGRAPHS)

BORE HOLE NO. L9-P-15-BH-14 (0.00m – 10.50m)]

BORE HOLE NO. L9-P-15-BH-14 (10.50m – 15.00m)


Geotechnical Investigation For Mumbai Metro Line 9/7A
(COREBOX PHOTOGRAPHS)

BORE HOLE NO. L9-P-15-BH-14 (15.00m – 18.00m)


APPENDICES
APPENDIX

FIELD BORELOG
Scanned with CamScanner
Scanned with CamScanner
APPENDIX

LAB TEST RAW DATA


Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1
Vertical Pile Capacity: (as per IRC 78 2014)
Pile Type = Bored Cast In Situ Pile Socket Length = 1 D
Pier No = P-15 BH- 14 Length of socket/Diameter, L/D = 1
Reference borehole = P-15 BH- 14 Depth factor = 1 + 0.4 (L/D) = 1.4
Diameter of pile = 1000 mm Depth Factor, df = 1.2
C/s Area of pile = 785398 mm 2 Selected Design Method = I
Grade of Concrete = M 35 Nc = 9
Grade of Steel = Fe 500 Cub = 1.2
Density of concrete = 2.50 T/m 3 Cus = 0.7
Start of rock = 6.00 m
Depth of borehole = 18.00 m
Thickness of drill run = 1.5 m
No of sections required = 8 Nos

Section Section Section Metho


CR RQD (CR+RQD)/ UCS Check Ksp End Bearing Cus Friction Cub End Bearing Cus Friction
No Start End d
2
m % % MPa Mpa T/m 2 Mpa Mpa T/m 2 Mpa Mpa T/m 2 Mpa Mpa T/m 2
1 6.00 7.50 16 0 8.00 No II 1.2 3.60 366.97 0.7 0.7 11.89
2 7.50 9.00 61 59 60.00 125.6 Yes I 0.69 5.00 509.68 2.522 2.522 42.84
3 9.00 10.50 77 68 72.50 142.2 Yes I 0.85 5.00 509.68 2.68 2.68 45.58
4 10.50 12.00 78 69 73.50 72.3 Yes I 0.86 5.00 509.68 1.91 1.91 32.50
5 12.00 13.50 43 23 33.00 142.3 Yes I 0.34 5.00 509.68 2.68 2.68 45.60
6 13.50 15.00 91 91 91.00 210.6 Yes I 1.09 5.00 509.68 3.27 3.00 50.97
7 15.00 16.50 66 64 65.00 99.5 Yes I 0.75 5.00 509.68 2.24 2.24 38.13
8 16.50 18.00 89 63 76.00 193.7 Yes I 0.89 5.00 509.68 3.13 3.00 50.97
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1

Recommended Pile Design Parameters :

Start of socket = 8.25 m


End bearing stress = 509.00 T/m 2
Frictional Stress = 32.50 T/m 2

Uplift Pile Capacity:

Uplift Pile Capacity = (0.7 X Ultimate frictional Resistrence)/2.5 + Dead weight of Pile

Pile End Bearing


Sr Socket Pile Length Frictional Capacity Pile Capacity Uplift Capacity
Dia Capacity
No Considered (m) (MT) (MT) (MT)
(mm) (MT)
1 1000 1 D 9.25 400 71.47 471 131
2 1000 2 D 10.25 400 173.57 573 304
3 1000 3 D 11.25 400 275.67 675 476
4 1000 4 D 12.25 400 377.78 778 649
5 1000 5 D 13.25 400 479.88 880 822
6 1000 6 D 14.25 400 581.98 982 995
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1

Lateral Pile Capacity: (As per IS 2911 Part 1,Section 2 )

Diameter of pile = 1.00 m


29580 2
E = N/mm
29580 2
= MN/m
= 29580399 KN/m 2
I = π / 64 D4
I = 0.0491 m4

Stratification Fixed Headed


Depth (m) Stratum Water SPT nh T k1 K R L1 (e) L1/R Lf/R Lf
Sr No Stratum
From To Type Table N m L1/T Lf/T m
1 Filled up soil 0.00 3.00 C-Phi Sub 20 2.84 3.481 0.00 0.00 2.20 7.66
2 Highly Weathered Rock 3.00 7.50 C-Phi Sub 30 4.28 3.207 0.00 0.00 2.20 7.06
3 Moderately Weathered Rock 7.50 18.00 C-Phi Sub 50 12 2.61 0.00 0.00 2.20 5.74

Pile Head Deflection, y (mm) = H (L1 + Lf )^3 /12EI x 10^3

Permissible Deflection, y (mm) = 10 mm


Governing stratum = 3
Design depth of Fixity, Lf (m) = 5.741 m
Cantilever length above ground, L1 (m) = 0 m

Lateral Load, H (kN) = y x 12EI x 10^-3 / (L1 + Lf )^3

= 920.9 kN
Lateral Load, H (T) = 92.09 T
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1

Lateral Pile Capacity: (As per IS 2911 Part 1,Section 2 )

Diameter of pile = 1.00 m


29580 2
E = N/mm
29580 2
= MN/m
= 29580399 KN/m 2
I = π / 64 D4
I = 0.0491 m4

Stratification Free Headed


Depth (m) Stratum Water SPT nh T k1 K R L1 (e) L1/R Lf/R Lf
Sr No Stratum
From To Type Table N m L1/T Lf/T m
1 Filled up soil 0.00 3.00 C-Phi Sub 20 2.84 3.481 0.00 0.00 1.90 6.61
2 Highly Weathered Rock 3.00 10.50 C-Phi Sub 30 4.28 3.207 0.00 0.00 1.90 6.09
3 Moderately Weathered Rock 10.50 19.50 C-Phi Sub 50 12 2.61 0.00 0.00 1.90 4.96

Pile Head Deflection, y (mm) = H (L1 + Lf )^3 /3EI x 10^3

Permissible Deflection, y (mm) = 10 mm


Governing stratum = 3
Design depth of Fixity, Lf (m) = 4.958 m
Cantilever length above ground, L1 (m) = 0m

Lateral Load, H (kN) = y x 3EI x 10^-3 / (L1 + Lf )^3

= 357.4 kN
Lateral Load, H (T) = 35.74 T
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1
Vertical Pile Capacity: (as per IRC 78 2014)
Pile Type = Bored Cast In Situ Pile Socket Length = 1 D
Pier No = P-15 BH- 14 Length of socket/Diameter, L/D = 1
Reference borehole = P-15 BH- 14 Depth factor = 1 + 0.4 (L/D) = 1.4
Diameter of pile = 1200 mm Depth Factor, df = 1.2
2
C/s Area of pile = 1130973 mm Selected Design Method = I
Grade of Concrete = M 35 Nc = 9
Grade of Steel = Fe 500 Cub = 1.2
Density of concrete = 2.50 T/m 3 Cus = 0.7
Start of rock = 6.00 m
Depth of borehole = 18.00 m
Thickness of drill run = 1.5 m
No of sections required = 8 Nos

Section Section Section Metho


CR RQD (CR+RQD)/ UCS Check Ksp End Bearing Cus Friction Cub End Bearing Cus Friction
No Start End d
2
m % % MPa Mpa T/m 2 Mpa Mpa T/m 2 Mpa Mpa T/m 2 Mpa Mpa T/m 2
1 6.00 7.50 16 0 8.00 No II 1.2 3.60 366.97 0.7 0.7 11.89
2 7.50 9.00 61 59 60.00 125.6 Yes I 0.69 5.00 509.68 2.522 2.522 42.84
3 9.00 10.50 77 68 72.50 142.2 Yes I 0.85 5.00 509.68 2.68 2.68 45.58
4 10.50 12.00 78 69 73.50 72.3 Yes I 0.86 5.00 509.68 1.91 1.91 32.50
5 12.00 13.50 43 23 33.00 142.3 Yes I 0.34 5.00 509.68 2.68 2.68 45.60
6 13.50 15.00 91 91 91.00 210.6 Yes I 1.09 5.00 509.68 3.27 3.00 50.97
7 15.00 16.50 66 64 65.00 99.5 Yes I 0.75 5.00 509.68 2.24 2.24 38.13
8 16.50 18.00 89 63 76.00 193.7 Yes I 0.89 5.00 509.68 3.13 3.00 50.97
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1

Recommended Pile Design Parameters :

Start of socket = 8.25 m


End bearing stress = 509.00 T/m 2
Frictional Stress = 32.50 T/m 2

Uplift Pile Capacity:

Uplift Pile Capacity = (0.7 X Ultimate frictional Resistrence)/2.5 + Dead weight of Pile

Pile End Bearing


Sr Socket Pile Length Frictional Capacity Pile Capacity Uplift Capacity
Dia Capacity
No Considered (m) (MT) (MT) (MT)
(mm) (MT)
1 1200 1 D 9.45 576 110.28 686 201
2 1200 2 D 10.65 576 257.32 833 450
3 1200 3 D 11.85 576 404.37 980 699
4 1200 4 D 13.05 576 551.41 1127 949
5 1200 5 D 14.25 576 698.45 1274 1198
6 1200 6 D 15.45 576 845.50 1421 1447
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1

Lateral Pile Capacity: (As per IS 2911 Part 1,Section 2 )

Diameter of pile = 1.20 m


29580 2
E = N/mm
29580 2
= MN/m
= 29580399 KN/m 2
I = π / 64 D4
I = 0.1018 m4

Stratification Fixed Headed


Depth (m) Stratum Water SPT nh T k1 K R L1 (e) L1/R Lf/R Lf
Sr No Stratum
From To Type Table N m L1/T Lf/T m
1 Filled up soil 0.00 3.00 C-Phi Sub 20 2.84 4.028 0.00 0.00 2.20 8.86
2 Highly Weathered Rock 3.00 7.50 C-Phi Sub 30 4.28 3.711 0.00 0.00 2.20 8.16
3 Moderately Weathered Rock 7.50 18.00 C-Phi Sub 50 12 3.019 0.00 0.00 2.20 6.64

Pile Head Deflection, y (mm) = H (L1 + Lf )^3 /12EI x 10^3

Permissible Deflection, y (mm) = 10 mm


Governing stratum = 3
Design depth of Fixity, Lf (m) = 6.642 m
Cantilever length above ground, L1 (m) = 0 m

Lateral Load, H (kN) = y x 12EI x 10^-3 / (L1 + Lf )^3

= 1233 kN
Lateral Load, H (T) = 123.3 T
Client : MMRDA Date Designed By Checked By
Contractor : M/s. J KUMAR INFRAPROJECTS LTD 28-01-2021 Samidha Nalin
Project : CA-48 Design and construction of elevated viaduct and nine (9) elevated stations (excluding architectural finishes and PEB roof structure ) including
two (2) flyovers,and underground twin tunnel, cut and cover ,ramp and one (1) underground station ( including architectural finishes and PEB
structures ) for corridor of Mumbai Metro line 9.i.e extension of line 7 from Dahisar (East) to ,Mira Bhayandar and Andheri to CSMI airport of
Mumbai Metro rail project of MMRDA .
Subject : Pile Capacity Calculation Location : P-15 BH- 14 Document No. : (CCTPL/GT/269/158) Rev No R1

Lateral Pile Capacity: (As per IS 2911 Part 1,Section 2 )

Diameter of pile = 1.20 m


29580 2
E = N/mm
29580 2
= MN/m
= 29580399 KN/m 2
I = π / 64 D4
I = 0.1018 m4

Stratification Free Headed


Depth (m) Stratum Water SPT nh T k1 K R L1 (e) L1/R Lf/R Lf
Sr No Stratum
From To Type Table N m L1/T Lf/T m
1 Filled up soil 0.00 3.00 C-Phi Sub 20 2.84 4.028 0.00 0.00 1.90 7.65
2 Highly Weathered Rock 3.00 7.50 C-Phi Sub 30 4.28 3.711 0.00 0.00 1.90 7.05
3 Moderately Weathered Rock 7.50 19.50 C-Phi Sub 50 12 3.019 0.00 0.00 1.90 5.74

Pile Head Deflection, y (mm) = H (L1 + Lf )^3 /3EI x 10^3

Permissible Deflection, y (mm) = 10 mm


Governing stratum = 3
Design depth of Fixity, Lf (m) = 5.737 m
Cantilever length above ground, L1 (m) = 0m

Lateral Load, H (kN) = y x 3EI x 10^-3 / (L1 + Lf )^3

= 478.5 kN
Lateral Load, H (T) = 47.85 T