kW Rating Specs Qty Unit Rate Purch cost kW Rating Specs Qty Unit Rate Purch cost

589 92-01-00 : Motors


590 92-01-01 : LT motors 1041.4 1068.4
BFW Pump 225 2 2 225 2 2
ID fan 110 6 1 132 6 1
FD fan 280 4 1 285 4 1
PA fan 90 2 1 90 2 1
ACW Pump 30 4 2 30 4 2
CT Make up pump 3.7 2 2 3.7 2 2
DM WATER transfer pump 22 2 2 22 2 2
SOFT WATER TRANSFER PUMP 11 2 2 11 2 2

591 92-01-02 : HT Motors

592 92-02-00 : Cables & Accessories

2 HT CABLES 550 MTR 1 500 MTR 1

Power Cables and Control Cables (BOILER 30500 MTR 1 30000 MTR 1
2
+ FHS+TG+ASH+ CT + OTHER BOP)

Electrical Cables & Accessories


3 (Glands,Lugs,ties,Ferruls,Sleeve with 1 1 1 1
Catrage)
Electrical Cables Trays with Accessories
4 ( Tray Supports,Penel Base Frame Support 1 1 1 1
materials)

2 Instruments & Control Cables 1 1

C&I Cables & Accessories


3 (Glands,Lugs,ties,Ferruls,Sleeve with 1 1
Catrage)
C&I Cables Trays with Accessories ( Tray
4 Supports,Penel Base Frame Support 1 1
materials)
596 92-03-00 : Earthing
597 92-03-01 : Above Ground Level Earthing 1 1 1
598 92-03-02 : Under Groung Earthing 0 0
599 92-04-00 : Panels
LT Busduct 15 MTR 3 15 MTR 3
600 92-04-01 : VFD with Panel
BOILER VFD PANEL FOR BFWP 450 1 450 1
BOILER VFD PANEL FOR FANS 480 1 507 1
VFD PANEL FOR FUEL FFEDER 8.8 1 8.8 1
601 92-04-02 : Soft Starters 0 0
602 92-04-03 : LT - MCC panel
BOILER MCC 200 1 280 1
APFC panel 100 1 200 1
TG MCC 30 1 71 1
FHS MCC 45 1 116 1
CT MCC 40 1 73 1
603 92-04-04 : LT- PCC panel
PCC for Cogen 2500 KW 1 2500 KW 1
PCC for Distillery 2500 KW 2 2500 KW 2
604 92-04-05 : HT - MCC panel 0
605 92-04-06 : HT- Panel 1 1
606 92-04-07 : LPBS
VFD PUSH BUTTON FOR 30 32
DOL/STARTER
VFD PUSH BUTTON 9 12
Supervision of commissioning 1
607 92-05-00 : MISCELLENEOUS
608 92-05-01 : Lighting Materials 1 1

609 92-05-02 : Lightning Arrestor /Aviation Lamp 0 0


610 92-05-03 : Diesel Generator 1 1
611 92-05-04 : Generator Transformer 0 0
612 92-05-05 : Auxilary Transformer 1.5 MVA , 2 X 3.5 MVA 3 3150 KVA 3
613 92-05-06 : Distribution Board
MLDB +DB 30 1 30 1
MOVDB 4 4
SLDB 6 8
614 92-05-07 : UPS
615 92-05-08 : DC Battery and Charger 1 100AH 1
616 92-05-09 : SwitchYard Package 0 0
kW Rating Specs Qty Unit Rate Purch cost
93-00-00 : CONTROLS AND INSTRUMENTATION -
617 BOUGHT OUT
623 93-01-01 : Junction Box 1
622 93-02-00 : Local instruments
623 93-02-01 : Level Gauges (LG) 5
624 93-02-02 : Temperature Gauges (TG) 5
625 93-02-03 : Pressure Gauges 58
626 93-02-04 : Draught Gauge 13
Diffrential DG 2
627 93-03-00 : Instruments (Digital)
628 93-03-01 : Temperature Elements 45
93-03-02 : Transmitters
629 ( TT,PT,DPT,LT,FT,Maganatic Type) 31
630 93-03-03 : Switches ( Level ,pressure ,DPS/limit) 3
631 93-04-00 : FITTINGS
632 93-04-01 : IBR Instruments Fitting 1
633 93-04-02 : SS & CU fitting 1
634 93-04-03 : GI pipe Fitting 1
635 93-05-00 : Indicators
636 93-05-01 : Float Level Indicators 1
637 93-05-02 : Large Dispay Indicators 2
638 93-05-03 : Electronic Drum Level Indicator
639 93-06-00 : Panels
640 93-06-01 : PLC with Scada 1
641 93-06-02 : DCS With Scada
642 93-06-03 : PID Control Panel
643 93-07-00 : ANALYZER
644 93-07-01 : Oxygen Analyzer 1

645 93-07-02 : Continous Emission Monitoring System


93-07-03 : Amient Air Quality Measurement
646 System
647 93-07-04 : SPM Analyzer 1
648 93-07-05 : SWAS
649 93-08-00 : MISCELLENEOUS
650 93-08-01 : Flow Elements 4
651 93-08-02 : Rorameter Flow Meters
652 93-08-03 : Vortex and Liquid Flow Meters
653 93-08-04 : Pnematic Damper Actuator 4
654 93-08-05 : UPS With Battery 1
655 93-08-06 : CCTV with Accessories
656 93-08-07 : Electrical Actuator
657 93-08-08 : Temperature Scanner
658 93-08-09 : Thermowell Pockets 34
659 93-08-10 : Public Address System
660 93-08-11 : Manifolds 22
Purch cost kW Rating Specs Qty Unit Rate Purch cost

5
23
41
8

21
35
2

1
1
1

1
3

3
1

35
29