RK350-2 20000103TF

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

BOOM LIFTING CAPACITIES

Main Boom Lifting Capacities with Outriggers


With outriggers in 6.6m position With outriggers in 6.2m position With outriggers in 5.2m position
MAIN 360˚ swing area
Boom length in meters
Over the side
Boom length in meters
Over the side
Boom length in meters
Operating radius (m) 9.4 15.8 22.2 28.6 35.0 9.4 15.8 22.2 28.6 35.0 9.4 15.8 22.2 28.6 35.0
3.0 35.00 22.50 15.50 35.00 22.50 15.50 35.00 22.50 15.50
3.5 30.60 22.50 15.50 30.60 22.50 15.50 30.60 22.50 15.50
4.0 27.50 22.50 15.50 10.00 27.50 22.50 15.50 10.00 27.50 22.50 15.50 10.00
4.5 24.70 20.70 15.50 10.00 24.70 20.70 15.50 10.00 24.70 20.70 15.50 10.00
5.0 22.30 19.20 15.50 10.00 7.00 22.30 19.20 15.50 10.00 7.00 21.50 19.20 15.50 10.00 7.00
5.5 20.30 17.85 14.00 10.00 7.00 20.30 17.85 14.00 10.00 7.00 18.70 17.50 14.00 10.00 7.00
6.0 18.60 16.70 13.00 10.00 7.00 18.60 16.70 13.00 10.00 7.00 15.70 14.80 13.00 10.00 7.00
6.5 16.40 15.60 12.15 10.00 7.00 16.40 15.60 12.15 10.00 7.00 13.40 12.55 12.15 10.00 7.00
6.8 9.00 15.00 11.70 10.00 7.00 9.00 15.00 11.70 10.00 7.00 9.00 11.40 11.70 10.00 7.00
7.0 14.70 11.40 10.00 7.00 14.70 11.40 10.00 7.00 10.70 11.40 10.00 7.00
8.0 12.65 10.15 8.80 7.00 11.95 10.15 8.80 7.00 8.10 8.90 8.80 7.00
9.0 10.40 9.05 7.85 6.25 9.70 9.05 7.85 6.25 6.50 7.30 7.85 6.25
10.0 8.40 8.15 7.05 5.65 7.70 8.15 7.05 5.65 5.20 6.00 6.60 5.65
11.0 6.85 7.40 6.35 5.15 6.10 7.10 6.35 5.15 4.25 4.95 5.55 5.15
12.0 5.50 6.45 5.80 4.70 4.80 6.15 5.80 4.70 3.45 4.15 4.70 4.70
12.5 5.05 5.95 5.50 4.45 4.35 5.65 5.50 4.45 3.10 3.80 4.30 4.50
13.0 4.56 5.55 5.30 4.30 3.95 5.20 5.30 4.30 2.85 3.50 4.00 4.20
13.2 3.70 5.40 5.20 4.20 3.25 5.10 5.20 4.20 2.80 3.40 3.85 4.05
14.0 4.80 4.85 3.95 4.50 4.65 3.95 2.95 3.45 3.65
15.0 4.15 4.45 3.65 3.85 4.15 3.65 2.45 2.95 3.15
16.0 3.55 4.00 3.40 3.25 3.70 3.40 2.05 2.55 2.75
17.0 3.10 3.55 3.15 2.80 3.25 3.15 1.65 2.20 2.40
18.0 2.70 3.15 2.95 2.40 2.85 2.95 1.35 1.85 2.10
19.0 2.35 2.75 2.75 2.05 2.45 2.65 1.10 1.60 1.80
19.6 2.20 2.50 2.65 1.90 2.20 2.50 1.00 1.45 1.65
20.0 2.40 2.60 2.10 2.40 1.35 1.60
21.0 2.10 2.35 1.80 2.15 1.10 1.35
22.0 1.80 2.10 1.50 1.90 0.90 1.15
23.0 1.60 1.90 1.30 1.70 0.70 0.95
24.0 1.40 1.70 1.10 1.45 0.75
25.0 1.25 1.50 0.95 1.25 0.60
26.0 1.10 1.35 0.80 1.10
27.0 1.15 0.90
28.0 1.00 0.75
29.0 0.90 0.65
30.0 0.75 0.50
31.0 0.60 0.40
32.0 0.50
32.5 0.45
Min. boom angle 0˚ 0˚ 0˚ 0˚ 0˚ 0˚ 0˚ 0˚ 0˚ 18˚ 0˚ 0˚ 0˚ 28˚ 39˚

Main Boom Lifting Capacities without Outriggers Unit: metric ton


Stationary Pick & Carry (under 2 km/h)
MAIN 360˚ swing area Over the front
Boom length in meters
360˚ swing area Over the front
Boom length in meters
Operating radius (m) 9.4 15.8 22.2 9.4 15.8 22.2 9.4 15.8 22.2 9.4 15.8 22.2
3.0 9.00 8.00 5.00 16.00 13.00 10.00 6.80 6.00 3.70 12.00 10.00 7.50
3.5 7.50 6.70 5.00 16.00 13.00 10.00 5.70 5.20 3.70 12.00 10.00 7.50
4.0 6.00 5.15 5.00 14.40 13.00 10.00 4.80 4.35 3.70 10.80 10.00 7.50
4.5 4.80 4.00 4.90 13.05 11.80 10.00 4.10 3.65 3.70 9.75 9.15 7.50
5.0 3.85 3.15 4.00 11.85 10.80 10.00 3.50 3.00 3.70 8.85 8.35 7.50
5.5 3.15 2.45 3.25 10.80 9.90 10.00 3.00 2.45 3.15 8.05 7.60 7.50
6.0 2.55 1.90 2.70 10.00 9.10 10.00 2.50 1.90 2.65 7.30 6.95 6.90
6.5 2.10 1.45 2.20 8.70 8.15 8.80 2.10 1.45 2.20 6.60 6.10 6.35
6.8 1.85 1.20 1.95 7.95 7.50 8.15 1.85 1.20 1.95 5.95 5.60 6.05
7.0 1.10 1.80 7.10 7.80 1.10 1.80 5.35 5.85
8.0 0.50 1.15 5.45 6.20 0.50 1.15 4.10 4.65
9.0 0.70 4.20 5.00 0.70 3.20 3.75
10.0 3.30 4.05 2.55 3.05
11.0 2.55 3.30 2.00 2.50
12.0 1.95 2.70 1.50 2.05
13.0 1.50 2.20 1.10 1.65
13.2 1.40 2.10 1.05 1.55
14.0 1.80 1.35
15.0 1.45 1.10
16.0 1.15 0.85
17.0 0.90 0.60
18.0 0.65
Min. boom angle 0˚ 51˚ 60˚ 0˚ 0˚ 24˚ 0˚ 51˚ 60˚ 0˚ 0˚ 30˚

344
RK350
Unit: metric ton
With outriggers in 3.8m position With outriggers in 2.21m position
Over the side Over the side
Boom length in meters Boom length in meters
9.4 15.8 22.2 28.6 35.0 9.4 15.8 22.2 28.6 35.0
35.00 22.50 15.50 14.20 13.30
26.00 22.50 15.50 10.70 9.90 11.20
19.60 18.50 15.50 10.00 8.40 7.80 8.90 9.50
15.40 15.15 15.50 10.00 6.80 6.20 7.20 7.80
12.60 12.30 13.20 10.00 7.00 5.65 5.00 5.90 6.50 6.75
10.60 10.30 11.00 10.00 7.00 4.70 4.10 5.00 5.50 5.75
9.00 8.50 9.50 10.00 7.00 3.90 3.45 4.25 4.70 4.95
7.70 7.25 8.15 8.70 7.00 3.40 2.85 3.60 4.10 4.20
7.00 6.60 7.45 7.95 7.00 3.00 2.50 3.25 3.70 3.80
6.35 7.10 7.60 7.00 2.35 3.10 3.50 3.60
4.85 5.55 6.15 5.90 1.60 2.30 2.65 2.70
3.75 4.40 4.85 5.00 0.95 1.70 1.95 2.05
2.90 3.55 3.95 4.15 1.20 1.45 1.60
2.25 2.90 3.25 3.45 0.70 1.10 1.25
1.60 2.35 2.70 2.90 0.75 0.95
1.30 2.10 2.50 2.65 0.80
1.15 1.90 2.30 2.45 0.70
1.80 2.20 2.35
1.50 1.90 2.05
1.15 1.55 1.75
0.80 1.25 1.45
0.95 1.20
0.70 0.95
0.70
0.55
0.50

0˚ 13˚ 35˚ 45˚ 50˚ 0˚ 46˚ 54˚ 61˚ 65˚

Working Ranges
25˚ 45˚

60

13.5m Jib offset 5˚


35.0m Boom+13.5m Jib 13.5m Jib offset 25˚
13.5m Jib offset 45˚
50
8.1m Jib offset 5˚
35.0m Boom+8.1m Jib 8.1m Jib offset 25˚
8.1m Jib offset 45˚

40
35.0m Boom 75˚
70˚
65˚
60˚
83.1˚
Hook Height (m)

55˚
28.6m Boom 50˚
45˚ 30
40˚
22.2m Boom
35˚
30˚
15.8m Boom 20
25˚
20˚
9.4m Boom 15˚

10˚ 10

0
0 10 20 30 40
Operating Radius (m)

*Boom/jib bending with load is not involved in figure of working ranges.

345

You might also like