Chapter 6 Quiz
Chapter 6 Quiz
9. A move ticket
a. is the formal plan and authority to begin production
b. specifies the materials and production required for each batch
c. records the work done in each work center
d. authorizes the storekeeper to release materials to work centers
10. The internal control significance of the excess materials requisition is that it
a. indicates the amount of material released to work centers
b. identifies materials used in production that exceed the standard amount allowed
c. indicates the standard quantities required for production
d. documents the return to raw materials inventory of unused production materials
13. Which of the following is not an assumption of the Economic Order Quantity model?
a. demand for the product is known with certainty
b. total cost per year of placing orders is fixed
c. lead time is known and is constant
d. there are no quantity discounts
16. If the daily demand is 40 units and the lead time is 12 days, the reorder point is
a. 40 units
b. 48 units
c. 480 units
d. none of the above
18. Which of the following is not a problem associated with standard cost accounting?
a. Standard costing motivates management to produce large batches of products and
build inventory.
b. Applying standard costing leads to product cost distortions in a lean environment.
c. Standard cost data are associated with excessive time lags that reduce its
usefulness.
d. The financial orientation of standard costing may promote bad decisions.
e. All of the above are problems with standard costing.
19. Computer integrated manufacturing includes all of the following technologies except
a. robotics
b. materials requirements planning
c. automated storage and retrieval systems
d. computer aided design
20. Which of the following would not be included as a value stream cost?
a. Labor costs of employees who simply transport the product from cell to cell.
b. Labor costs of employees who design the product.
c. A charge per square foot for the value stream production facility including cost of
rent and building maintenance.
d. All of the above are value stream costs
21. Which situation violates the segregation of functions control procedure?
a. production planning and control is located apart from the work centers
b. inventory control maintains custody of inventory items
c. cost accounting has custody of and makes entries on cost records
d. work centers record direct labor on job tickets
22. All of the following are internal control procedures that should be in place in the conversion
cycle except
a. calculation and analysis of direct material and direct labor variances
b. retention of excess materials by work centers
c. physical count of inventory items on hand
d. limited access to raw material and finished goods inventories
24. A manufacturing process that is organized into group technology cells utilizing no human labor
is called
a. islands of technology
b. process simplification
c. computer integrated manufacturing
d. traditional manufacturing
ANSWER KEY:
1. d
2. b
3. c
4. c
5. b
6. b
7. c
8. d
9. c
10. b
11. b
12. c
13. b
14. b
15. b
16. a
17. c
18. a
19. e
20. b
21. d
22. b
23. a
24. a
25. a