Professional Documents
Culture Documents
The Getaway (Villa 3) : Caroline Hofer Suarez
The Getaway (Villa 3) : Caroline Hofer Suarez
The Getaway (Villa 3) : Caroline Hofer Suarez
A A
GENERAL NOTES :
B B
1. ALL PLUMBING WORKS INCLUDED HEREIN SHALL BE EXECUTED ACCORDING
TO THE PROVISIONS OF THE PHILIPPINE PLUMBING CODE, THE NATIONAL
BUILDING CODE AND THE RULES AND REGULATIONS OF PASIG CITY.
C C
2. COORDINATE THE DRAWING WITH OTHER RELATED DRAWINGS AND
SPECIFICATIONS. THE ENGINEER SHALL BE NOTIFIED IMMEDIATELY
OF ANY DISCREPANCY FOUND THEREIN.
3. ALL PIPES SHALL BE INSTALLED AS INDICATED. ANY RELOCATION
REQUIRED FOR PROPER EXECUTION OF OTHER TRADES SHALL BE
PRIOR APPROVAL OF THE ARCHITECT AND ENGINEER.
4. PROPOSED SANITARY UTILITIES SHALL CONFORM TO THE ACTUAL
LOCATION, DEPTH AND INVERT ELEVATION OF ALL EXISTING PIPES
AND STRUCTURES AS VERIFIED BY THE CONTRACTOR. VILLA 3 VILLA 3
5. ALL SEWER LINES SHALL BE POLYVINYL CHLORIDE (PVC) PIPE CLASS DWV.
1 G/F WATERLINE LAYOUT 2 G/F DRAINAGE & SEWERLINE LAYOUT
P1 P1
CWL
COLD WATER LINE GATE VALVE
BRANCH VENT
BRANCH VENT CHECK VALVE
DS DOWN SPOUT
PLAN
SECTION
VILLA 3
4 AREA DRAIN DETAIL
P1
PROJECT TITLE: OWNER: ARCHITECT : REVISIONS: PURPOSE OF ISSUANCE: SHEET CONTENTS: SHEET NO.:
GENERAL NOTES
NO. DATE DESCRIPTION LEGEND & SYMBOLS
G/F WATERLINE LAYOUT
LOCATION: LOT 284 PUROK 6, KAYMISAS GEN AGUINALDO, CAVITE TIN NO. ISSUED ON: DATE: PLUMBING