I.

DATA PROYEK

1 Pemilik Proyek : PT. INDAH KIAT KARAWANG Tbk.


: ( OKI PULP AND PAPER MILL )
2 Alamat Pemilik Proyek : Jl. Prof. Dr. Ir. H Soetami No. 88 Adiarsa , Kec. Karawang
: Timur , Kab. Karawang - Jawa Barat 41311
3 Nama Proyek : OKI - Civil Work Package 2 ( WTP , WHP and Power Plant )
4 Alamat Lokasi Proyek : OKI Pulp & Paper Mill Desa Bukit Batu
: Kec. Air Sugihan Kab. Ogan Komering Ilir - Sumatera Selatan
a Koordinat : - 2.7536541 ; 105.2746415
b Jarak Palembang - OKI Mill Jetty : 75 Km ( Jalur Sungai )
c Jarak Muara Sugihan - OKI Mill Jetty : 92 Km ( Jalur Sungai )
5 Waktu Pelaksanaan : 480 Hari Kalender ( 16 Bulan )
6 Waktu Pemeliharaan : 360 Hari Kalender ( 12 Bulan )
7 Harga Kontrak : Rp. 966,644,352,774.00
8 Cara Pembayaran : 10 % Uang Muka + 80 % Progress + 10 % Retensi
9 Jenis Kontrak : Unit Price

II. LINGKUP PEKERJAAN

1 Jarak Jetty - Site / Lokasi : ± 5.6 Km


2 Jarak Batching Plan - Site / Lokasi : ± 2.0 Km
3 Jarak Tanjung Priok - Jetty OKI : ± 11 Jam

4 WATER TREATMENT PLANT Dan EFFLUENT


TREATMENT PLANT ( WTP & ETP )
A Rencana Pelaksanaan : 450 Hari Kalender ( 15 Bulan )
B Harga Kontrak : Rp. 284,304,778,650.00
C Water Treatment Plan ( ada dalam 3 bagian ) : Pre - Treatment , RO dan Demin
a Water Intake Sump and Pump Station : 25.00 m x 21.00 m x 9.6 mH
b Aeration Tank ( 3 Unit ) : 40.00 m x 20.00 m x 8.2 mH
c Pre - Sedimentation Tank ( 6 Unit ) : 37.00 m x 30.00 m x 7.5 mH
d Grid Floccculation ( 6 Unit ) : 28.00 m x 9.00 m x 6.0 mH
e Tube Settler ( 6 Unit ) : 28.00 m x 18.00 m x 5.7 mH
f Dyna Sand Filter ( 3 Unit ) : 60.00 m x 15.00 m x 6.5 mH
g Manganese Filter ( 3 Unit ) : 8.00 m x 7.00 m x 4.5 mH
h Sludge Water Regulating ( 3 Unit ) : 12.00 m x 12.00 m x 5.0 mH
i Sludge Thickener ( 3 Unit ) : Ø 28 m x 4.8 mH
j Sludge Storage Tank : 20.00 m x 20.00 m x 3.0 mH
k Treated Water Tank : 120.00 m x 60.00 m x 5.5 mH
l Demin Plant Building : - 78.00 m x 30.00 m x 10.0 mH
- 78.00 m x 18.00 m x 10.0 mH
m Storage Tank Foundation :
n MCC Room ( 3 Lantai ) : 77.00 m x 14.00 m x 16.0 mH
o Blower Room : 32.00 m x 21.00 m x 9.0 mH
p Sludge Dewatering Room ( 2 Lantai ) : 54.00 m x 21.00 m x 16.80 mH
q Lime Dosing Room : 36.00 m x 27.00 m x 14.50 mH
r Chemical Dosing Room : 48.00 m x 27.00 m x 14.50 mH
D Effluent Treatment Plan ( ETP )
a Emergency Foundation : 150.00 m x 100.00 m x 5.50 mH
b Inlet Wall / Inlet Sump : 50.00 m x 30.00 m x 9.0 mH
c Neutralization Pool : 60.00 m x 30.00 m x 6.50 mH
d Primary Sedimentation ( 6 Unit ) : Ø 52 m x 4.5 mH
e Secondary Sedimentation ( 6 Unit ) : Ø 62 m x 4.5 mH
f Equalization Tank : 80.00 m x 70.00 m x 5.50 mH
g Aeration Tank ( 2 Unit ) : 380.00 m x 60.00 m x 6.50 mH
h Primary Thickener ( 3 Unit ) : Ø 30 m x 4.5 mH
i Secondary Thickener ( 3 Unit ) : Ø 30 m x 4.5 mH
j Sludge Collection Well : 10.00 m x 10.00 m x 6.20 mH
k Effluent Discharge Tank : 30.00 m x 20.00 m x 5.50 mH
l - Sludge Dewatering : 55.00 m x 30.00 m x 12.0 mH
- Dosing Room : 100.00 m x 15.00 m x 12.0 mH
m Blower Room : 110.00 m x 15.00 m x 11.0 mH
: 100.00 m x 15.00 m x 11.0 mH
n MCC Room ( 3 Lantai ) : 70.00 m x 20.00 m x 16.0 mH

5 WOOD HANDLING PLANT ( WHP ) & RC / LK / BG


A Rencana Pelaksanaan : 360 Hari Kalender ( 12 Bulan )
B Harga Kontrak : Rp. 507,078,434,483.00
C Wood Handling Plant ( WHP )
a Chipping Line include Screening Room : 10 Unit
b Chippile Ø 142 m : 3 Unit
c Chip Conveyor , Bark Conveyor , Pin & : Pondasi termasuk Pemasangan Baut & Plat Embeded
Fines Conveyor
d MCC Room
- MCC Room 1 ( 3 Lantai ) : 130.00 m x 15.00 m
- MCC Room 2 ( 3 Lantai ) : 120.00 m x 15.00 m
- MCC Room 3 ( 3 Lantai ) : 57.00 m x 10.00 m
- MCC Room 4 ( 3 Lantai ) : 50.00 m x 10.00 m

D RC , LK , BG
a Storage Tank Foundation
- RGL Ø 22 m : 1 Unit
- X - Filter Ø 4.5 m : 4 Unit
- Dregs Storage Ø 9.5 m : 1 Unit
- Causticizer Ø 9 m : 4 Unit
- Spill Clarifier Ø 34 m : 1 Unit
- Lime Mud Ø 13.50 m : 2 Unit
- Lime Mud Washing Ø 9.50 m : 1 Unit
- WWL Ø 24.00 m : 1 Unit
b Slaker Building ( 3 Lantai ) : 40.00 m x 53.00 m
c CD Filter Building ( 2 Lantai ) : 19.00 m x 25.00 m
d RC MCC Room Building ( 3 Lantai ) : 13.00 m x 43.00 m
e LK Feed End Building ( 3 Lantai ) : 28.00 m x 68.00 m
f LK Fire End Building ( 3 Lantai ) : 28.50 m x 26.50 m
g LK Pier ( 2 Line ) : 5 Pier
h LK MCC Room Building ( 3 Lantai ) : 13.00 m x 40.00 m
i Bark Gasifier Foundation : 30.00 m x 11.00 m
j Bark Dryer : 33.00 m x 45.00 m
k Bank Gasifier Conveyor Foundation :
l Bank Gasifier MCC Room ( 3 Lantai ) : 10.00 m x 40.00 m
m Cooling Tower : 2 Cell
6 POWER PLANT
A Rencana Pelaksanaan : 360 Hari Kalender ( 12 Bulan )
B Harga Kontrak : Rp. 175,261,139,641.00
C Area Bangunan Power Plant Yang Ada :
a PB # 4 ( 1 set ) : 130 x 60 m²
b BD # 9 - 10 : 120 x 45 m²
c Conveyor BY - BD # 9 - 10 : 750 x 10 m²
d BD # 5 - 8 : 75 x 85 m²
e CT 14 Cells : 85 x 150 m²
f CT Extention : 20 x 10 m²
g STG 5 - 7 : 110 x 200 m²
h AC & Chiller : 30 x 115 m²
D Perluasan Area Bangunan Power Plant
Yang Dikerjakan Saat Ini :
a Power Boiler Plant : 1 Unit
- Rencana Masa Pelaksanaan : 300 Hari Kalender ( 10 Bulan )
- Boiler Raft Foundation : 41.10 m x 49.60 m
- ESP Foundation & Portal Frame Superstructure : 16.00 m x 30.00 m
- Ducting Foundation : 17.50 m x 25.00 m
- MCC Room ( 3 Lantai ) : 14.00 m x 44.00 m
- Sand Storage Warehouse ( 1 Lantai ) : 20.00 m x 50.00 m
- Coal and Bark Handling Conveyor Foundation : 18 Pedestal x 235.00 m

b Cooling Tower Plant ( CT )


- Rencana Masa Pelaksanaan : 360 Hari Kalender ( 12 Bulan )
- CT Concrete Basin : 134.00 m x 35.00 m x 4.5 mH
- Pump & Piping Foundation :
- MCC Room ( 3 Lantai ) : 57.00 m x 7.00 m

c Steam Turbine Generator Plant ( STG ) : 3 Unit


- Rencana Masa Pelaksanaan : 300 Hari Kalender ( 10 Bulan )
- Turbine Generator House : 136.50 m x 30.00 m x 33.5 mH
- Turbine Generator Island ( 3 Unit ) : 7.80 m x 19.60 m
- Condensate / U Loop : 136.50 m x 20.00 m
- PDS / MCC Room ( 4 Lantai ) : 172.50 m x 11.00 m
- Transformer Room ( 1 Lantai ) : 172.50 m x 11.00 m x 12.575 m

You might also like