DATA PROYEK
D RC , LK , BG
a Storage Tank Foundation
- RGL Ø 22 m : 1 Unit
- X - Filter Ø 4.5 m : 4 Unit
- Dregs Storage Ø 9.5 m : 1 Unit
- Causticizer Ø 9 m : 4 Unit
- Spill Clarifier Ø 34 m : 1 Unit
- Lime Mud Ø 13.50 m : 2 Unit
- Lime Mud Washing Ø 9.50 m : 1 Unit
- WWL Ø 24.00 m : 1 Unit
b Slaker Building ( 3 Lantai ) : 40.00 m x 53.00 m
c CD Filter Building ( 2 Lantai ) : 19.00 m x 25.00 m
d RC MCC Room Building ( 3 Lantai ) : 13.00 m x 43.00 m
e LK Feed End Building ( 3 Lantai ) : 28.00 m x 68.00 m
f LK Fire End Building ( 3 Lantai ) : 28.50 m x 26.50 m
g LK Pier ( 2 Line ) : 5 Pier
h LK MCC Room Building ( 3 Lantai ) : 13.00 m x 40.00 m
i Bark Gasifier Foundation : 30.00 m x 11.00 m
j Bark Dryer : 33.00 m x 45.00 m
k Bank Gasifier Conveyor Foundation :
l Bank Gasifier MCC Room ( 3 Lantai ) : 10.00 m x 40.00 m
m Cooling Tower : 2 Cell
6 POWER PLANT
A Rencana Pelaksanaan : 360 Hari Kalender ( 12 Bulan )
B Harga Kontrak : Rp. 175,261,139,641.00
C Area Bangunan Power Plant Yang Ada :
a PB # 4 ( 1 set ) : 130 x 60 m²
b BD # 9 - 10 : 120 x 45 m²
c Conveyor BY - BD # 9 - 10 : 750 x 10 m²
d BD # 5 - 8 : 75 x 85 m²
e CT 14 Cells : 85 x 150 m²
f CT Extention : 20 x 10 m²
g STG 5 - 7 : 110 x 200 m²
h AC & Chiller : 30 x 115 m²
D Perluasan Area Bangunan Power Plant
Yang Dikerjakan Saat Ini :
a Power Boiler Plant : 1 Unit
- Rencana Masa Pelaksanaan : 300 Hari Kalender ( 10 Bulan )
- Boiler Raft Foundation : 41.10 m x 49.60 m
- ESP Foundation & Portal Frame Superstructure : 16.00 m x 30.00 m
- Ducting Foundation : 17.50 m x 25.00 m
- MCC Room ( 3 Lantai ) : 14.00 m x 44.00 m
- Sand Storage Warehouse ( 1 Lantai ) : 20.00 m x 50.00 m
- Coal and Bark Handling Conveyor Foundation : 18 Pedestal x 235.00 m