DOCUMENT. NO.

DATE DESIGNED DATE


PROJECT CANTILEVER ROOF
12 04 22 AS 12 04 22

CLIENT REVISION DATE CHECKED DATE


12 04 22 KANAL 12 04 22

CL. NO. DESIGN CALCULATIONS-(Bracing to Trusss connection) REFERENCES

11.0 Bolted Beam to Beam Shear + Tension End plate connection: IS 800 - 2007
11.1 Type I (Refer 11.1.4 for Section Properties)
11.1.1 Design forces:
Shear force for design of connection = 1.00 kN
Tensile force for design of connection = 56.00 kN

11.1.2 Design data:

Dia. of Bolt d = 20 mm
Dia. of Bolt hole do = 22 mm
2
Ultimate strength of Bolt fub = 800 N/mm
2
Yield strength of Bolt fyb = 640 N/mm
2
Yield strength of the beam fybe = 250 N/mm
2
Tensile strength of Beam fube = 410 N/mm
2
Yield strength of Column fyc = 250 N/mm
2
Tensile strength of Column fuc = 410 N/mm
2
Yield strength of End plate fyE = 250 N/mm
2
Tensile strength of End plate fUE = 410 N/mm
2
Ultimate tensile stress of weld fUW = 410 N/mm

Partial safety factor of Materials Table: 5


for yielding gmo = 1.10
to buckling gmo = 1.10
by Ultimate stress gm1 = 1.25
Bolts, friction type Shop fabrication gmfs = 1.25
Bolts. Bearing type Shop fabrication gmbs = 1.25
Welds Shop fabrication gmws = 1.25
Bolts, friction type Field fabrication gmff = 1.25
Bolts. Bearing type Field fabrication gmbf = 1.25
Welds Field fabrication gmwf = 1.50

No. of rows of bolt Nr = 1 nos


Bolt spacing S = 50 mm
No. of columns of bolt Nc = 1 nos
Edge dist, Horizontal Lh = 50 mm
Edge dist, vertical on Top Lv1 = 50 mm
Edge dist, vertical on Bottom Lv2 = 50 mm
Weld size between Beam & End plate αww = 8 mm
Dist. From top of beam to centre of first Hc = - mm
100 x 12 End plate grade Fe410

11.1.5 Design of connection:


11.1.5.1 Bolt shear check:
Shear capacity of Bolt Vdsb = Vnsb/gmb Cl. 10.3.3
Vnsb = Fub/√3(nu Anb + ns Asb)
ns = 1
nu = 0
DOCUMENT. NO. DATE DESIGNED DATE
PROJECT CANTILEVER ROOF
12 04 22 AS 12 04 22

CLIENT REVISION DATE CHECKED DATE


12 04 22 KANAL 12 04 22

CL. NO. DESIGN CALCULATIONS-(Bracing to Trusss connection) REFERENCES


Asb = π x 20^2/4
= 314.16 mm2
Anb = 0.8 x 314.16
= 251.33 mm2
Vnsb = (800/√3) x (1 x 314.16)
+ (0 x 251.33)
= 145.10 kN
Vdsb = 145.1/1.25
= 116.08 kN
Shear capacity of bolt Group, Vdsb = 116.08 x 1 x 1
= 116.08 kN
> 1.00 kN
Hence O.k

11.1.5.2 Bolt tension check:


Tension capacity of bolt Tdb = Tnb/gmb Cl. 10.3.5
Tnb = 0.9 fub An < fyb Asb(gmb/gmo)
= 0.9 x 800 x 251.33
≤ 640 x 314.16(1.25/1.1)
= 180.96 kN
<= 228.48 kN
Tnb = 180.96 kN
Tdb = 180.956/1.25
= 144.765 kN
Tension capacity of bolt Group, Tdb = 144.765 x 1 x 1
= 144.76 kN
> 56.00 kN
Hence O.k

11.1.5.6 End plate shear:


Av = 100 x 12
= 1200 mm2
Anv = ( 100 - (1 x 22) ) x 12
= 936 mm2

Eff. Shear area , Anv = (fy/fu)(rm1/rmo) Av/0.9 936 = (250/410) (1.25/1.1) x Ave Cl. 8.4.1.1 (Note)
0.9
2
Av = 1215.75 mm
Ave = MIN(1200 , 1215.75)
2
Ave = 1200.00 mm
Shear capacity of End plate Vd = Vn / gmo Cl. 8.4.1.1
Vn = Vp
Vp = Ave fy/√3
DOCUMENT. NO. DATE DESIGNED DATE
PROJECT CANTILEVER ROOF
12 04 22 AS 12 04 22

CLIENT REVISION DATE CHECKED DATE


12 04 22 KANAL 12 04 22

CL. NO. DESIGN CALCULATIONS-(Bracing to Trusss connection) REFERENCES

= 1200 x 250/sqrt(3)
= 173.21 kN
Vd = 173.21/1.1
= 157.46 kN
> 1.00 kN
Hence O.k

11.1.5.7 Block shear check for End plate:


Block shear strength Tdp = min  Avg f y 0.9 Atn f u  Cl. 6.4.1
  
 3g m 0 g m1 
(or)

 0.9 Avn f u Atg f y 


  
 3g m1 g m 0 
Avg = (d - Lv)t
= (100 - 50) x 12

= 600 mm2
Avn = [d - Lv -((Nr - 0.5)do)]t
= [100 - 50 - ((1 - 0.5) x 22) x 12]
= 468 mm2
Atg = (Lh t)
= (50 x 12)
= 600 mm2
Atn = (Ln - (0.5 do)) t
= (50 - (0.5 x 22)) x 12
= 468 mm2
Avg FyE/√3 gmo + 0.9 Atn FuE/ gm1 = 600 x 250/Sqrt(3) x 1.1
+ 0.9 x 468 x 410/1.25
= 216.88 kN
(0.9Avn FuE/√3 gm1 + Atg FyE/ gmo) = (0.9x468x410)/(Sqrt(3) x 1.25)
+(600 x 250) / 1.1
= 216.13 kN
Tdp = min(216.883,216.13)
= 216.13 kN
The Plate will be Block sheared > 0.50 kN
at TWO Locations Hence O.k