Arcadia Hotel Hanau

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Arcadia Hotel Hanau

“LG’s Multi V III is very energy-efficient and very


quiet, way ahead of the competition. The result of
that not one guest complained, which was perfect”

Markus Scheuenstuhl
Director of the Hotel Arcadia

01

Arcadia Hotel Hanau


Hotel

Location Frankfurt am Main, Germany


Frankfurt

Product Multi V III, Multi V Mini


Hotel Multi V III, Multi V Mini

The hotel is always striving to improve rooms centrally from the reception. “LG’s Multi V III is very energy-efficient

Solution
This provides high potential for sav-
Background
its service to their guests and, with this and very quiet, way ahead of the com-
in mind, the decision was made to equip ings, both in energy and costs, as the petition. It was the perfect solution for
Arcadia 4-star hotel in Hanau, the birth-
these 105 rooms with air-conditioning as
part of a total refurbishment of the build- Multi V III was rapidly installed
cooling and heating capacity can be
lowered when the guest is away from
this building and everything that was
behind it,” says Marco Tschörner, LG
Hotel place of the famous story-collec-
tors the Brothers Grimm, was to
ing in 2012. floor-by-floor without much dis-
ruption in hotel’s daily operations
the hotel during the day.
Project Manager, continues describ-
ing the solution, “with LG solution, the
Hanau be remodelled with new air con-
ditioning system
LG’s custom-made solution with Multi operator saves about 20% energy in
day-to-day operations when compared
Challenge Benefit
V III and different indoor units asserted
itself distinctly in the bidding phase to offers from competitors. This can
The Arcadia hotel Hanau is located in be clearly seen in the hotel’s balance
against its competitors. To avoid hotel
Location the Rhein-Main metropolitan region, an operations being disrupted, the instal- With energy savings of up to 20% sheet.” Another benefit of LG air con-
Frankfurt am Main, Germany Rapid and simple installation of air-
important hub of the German economy. lation was made. This meant that a and a considerably quiet opera- ditioners over rival products was con-
conditioning system in 105 rooms
The City of Hanau is approximately 30 maximum of only 21 rooms were not tional noise, Multi V III system siderably quieter operational noise of
had to be done while the hotel
kilometres from Frankfurt/Main, one available for guests in each phase of fulfilled the hotel’s requirements only 3 decibels, as well as the ease of
continued its normal operations
Issue of Europe‘s most important financial construction. In all, a total of 800 me- perfectly
installation.
4-star hotel in Hanau, the birth- centres. Hanau is also the birthplace of ters of pipe were re-laid on all the floors
place of the famous story-collec-
the Brothers Grimm, the world-famous during the project. The implementation
tors the Brothers Grimm, want- “We are delighted with the solution. It
ed to be remodelled with new story collectors. The Brothers Grimm also took into account the capacity lim-
was not necessary to make significant
air conditioning system while Monument, erected in 1896, stands in its of the 30 year-old power lines in the
the hotel continued its normal changes for the building itself for the
building by integrating LG Soft Starter
operations. front of the Neustädter Rathaus (Town installation of air conditioners, and they
Relays. The ensuing time-delayed
Hall) and the Grimm Museum is in the work wonderfully,” sums up Markus
switching of the external devices pre-
immediate vicinity of the hotel. The Scheuenstuhl. The excellent coop-
cludes overloading the electrical wiring
Solution 4-star hotel honours both the past and in the hotel. eration between LG and Zoubek, the
Multi V III was rapidly installed the present: the modern business hotel contractor, also allowed for a smooth
floor-by-floor without much dis- caters mainly to business clients while The key challenge of the project was to The 105 rooms were equipped with progress during the refurbishing with
ruption in hotel’s daily opera- combining high standards and its his- install the devices rapidly and simply air conditioners and the 5 suites with “Air conditioning systems are basic re- ongoing hotel operations. Markus
tions, resulting in energy savings
of up to 20% and a considerably torical roots. In the hotel the legacy of as the hotel continued its normal op- ducts, which were concealed and in- quirement for buildings nowadays, so Scheuenstuhl adds: “the result of this
quiet operational noise. the storytellers is reflected in the room erations. A further requirement in this tegrated perfectly into the room. Ac- it was an important up-date which we cooperation was that not one guest
names – every guest is welcomed by context was to reconcile to the greatest cording to Andreas Graf-Matzner from carried out as part of the hotel renova- complained since. It was perfect.”
his “personal fairy tale“ in the Frog King extent possible the interests of the own- LG, Subsidiary Manager Frankfurt, “we tion. We are looking forward to spring
have achieved the objective to minimise
Developer Suite or the Cinderella Room. ers/principals and the hotel operators, season, a period when it was always
the costs and time needed.” Multi V III
Andreas Graf-Matzner The hotel, part of the Arcadia Group, the Arcadia Group, from decision-mak- too cold for one guest or too warm for
connected with building management
has a total of 145 rooms, five Jun- ing to implementation. “The fundamen- another, but now we have rooms with
system, are extremely user-friendly
ior Suites and six modern conference tal task was to air-condition 105 rooms central heating and air-conditioning.
since the rooms can be individually
Architect rooms. The building was constructed and integrate indoor units into the controlled. A higher-level control sys- This will be a real advantage for us,”
Ing. Büro Paulus in two phases, whereby the rooms in rooms with as little structural work as tem for the hotel was designed and in- as Markus Scheuenstuhl, Director of
the older part, (from 1982), were with- possible”, says Andreas Graf-Matzner, tegrated for this purpose. Furthermore, Arcadia Hotel says, summarising the
out any form of air-conditioning until LG Subsidiary Manager Frankfurt, the an AC-Smart Unit, a touch-controller, benefits and new opportunities created
the start of the project in early 2012. Project Manager. enabled hotel staff to control individual by LG air conditioning system.
4 5
GLOBANA Airport Hotel

“We have great faith in this company – LG appliances


are maintenance-friendly and the company provides
first-class service. We had high expectations and
these were fulfilled.”

Frank Rößler
Product Implementation, TGM GmbH

02

GLOBANA Airport Hotel


Hotel
Leipzig

Location Leipzig, Germany

Product Multi V III


Hotel Multi V III

antee the success of every event. The ent and the demands made by the daily “The new air conditioners have been

Background design of the new air conditioners,


which were optimally integrated into the Solution operation of the hotel. The custom-made
implementation was very impressive: Each
well received by our guests. They are
accepted and used and we have not
GLOBANA GLOBANA hotel is a 4-star airport
rooms as part of the reconstruction and
renovation in 2012, was paramount. Un-
High-end LG Art Cool indoor units
outdoor unit connected two vertically-
grouped floors, on the left and the right
heard of any problems either operating
them or with their serviceability,” says
were installed: it was not only styl-
Airport hotel in Leipzig/Halle, which is part
of GLOBANA Airport Fair & Con-
til this time there was no air-condition-
ing at all in the 158 rooms and suites.
ish as the hotel required but was
sides of the two floors.” The idea was that,
if there should be a malfunction on one
Dajana Mischke, the GLOBANA Airport
Hotel Marketing Manager. The excellent
also energy- and cost-efficient
Hotel ference site that usually holds for
example fashion shows and events
side of the floor, the guest can just move
into the room opposite”, according to Rog-
preliminary planning and LG’s support,
both on site and over the phone, meant
er Jannicke, TGM GmbH, Product Imple- that the installation time could be kept to

Challenge
Design, the ‘look’ and fashion all find mentation. There was also the additional an absolute minimum. As a result there
Location ‘centre stage’ in the GLOBANA Airport benefit that the facades in the sun or in the was no significant downtime. “We estab-
Leipzig, Germany Hotel Leipzig/Halle. This is the golden shade are controlled entirely independent- lished a very good relationship manage-
thread running through the project, Installing air-conditioning system ly of each other, making the system more ment - and after-sales management with
from conception of the hotel, which was needed, which would satisfy energy- and cost-efficient on a daily basis. the client. One benefit was definitely our
Issue welcomes for example guests from high standards of the hotel in terms
One important contribution to the smooth immediate assistance when problems
GLOBANA Hotel had very clear the textile and fashion sectors, to the of functionality and design
implementation of the project and the and questions arose,” says Helmut Pflu-
objectives – low noise levels, smallest details of the furnishings and
low energy consumption and long-term customer satisfaction was the gradt.
state-of-the-art design; the de- in the daily operations of the hotel. The client set very clear objectives, “We have a very good solution, with almost staff training conducted in the LG Acad- The cooperation with LG satisfied all ex-
cisive factor was, essentially, Looking to attract the target group of whereby one essential factor in award- no encroachment on the building itself, emy for the GLOBANA Airport Hotel Fa- pectations of the GLOBANA Airport Ho-
the design. the GLOBANA Airport Fair & Confer- ing the project was the design factor of with rapid installation and relatively little cility Management Team, as well as the tel, and the hotel puts it as: “everything
ence Center, the events centre adja- the new cooling units. “Based on our personnel,” enthuses Frank Rößler, TGM technical training given by LG during the from one source.” “It is very gratifying to
cent to the GLOBANA Airport Hotel, the demands – low noise levels, low en- GmbH, Product Implementation, describ- commissioning of the system. “Even be- cooperate with a major player like LG.
Solution hotel is host to the numerous visitors ergy consumption and state-of-the-art ing the result of the cooperation with LG. fore the first agreement, technical support There will be many opportunities for fur-
Multi V III’s exceptional perfor- to fashion shows and the retail shops design – we saw very quickly that LG As Helmut Pflugradt, LG Electronics, Area was the crucial factor for us: we wanted to ther cooperation in the future,” stresses
mance along with LG Art Cool
indoor units with stylish design there. The ‘look’ played an important offered the ideal solution,” says Frank Sales Manager, puts it: “the main advan- be able to make a technical assessment Frank Rößler, TGM GmbH, Product Im-
that has almost no encroach- role in the design of the hotel, which Rößler, TGM GmbH, Product Imple- tage of the products used is that they are of the products ourselves– as well as LG’s plementation. Meanwhile this coopera-
ment on the building itself, opened in 1997. It emulates the silhou- mentation, describing the decision- easy to install and maintain. Their uncon- ongoing technical support. Consequently tion also extends to the GLOBANA Air-
went beyond hotel’s expecta-
tions. ette of an airplane, thus harmonising making process, adding: “The decisive ventional design, low running noise and we had no reservations about using LG port Fair & Conference Center with the
with its surroundings. The demands factor was, essentially, the design!” excellent price-performance ratio charac- products for the first time,” Frank Rößler, furnishing of the hotel with LG TV sets.
made on the interior design of the only Another important factor was that the terise the LG appliances.” The look of the TGM GmbH, Product Implementation. Plans are already in progress for another
4-star hotel at the Leipzig/Halle Airport task was to be completed with as little LG ArtCool indoor units harmonises per- joint project: in the future the client would
Developer
are correspondingly high and suited installation work as possible. The aim fectly with the design of the hotel rooms. 2 like to incorporate heat recovery in the
Helmut Pflugradt
to the needs of the business guests. was to avoid blocking floors where no AC-Smart-Units, a touch controller, enable air conditioners, using LG’s heat pump

Architect
Each room is elegantly equipped with
a modern flair, providing a calm haven
installation was taking place. A rigor-
ous planning phase ensured that the
the individual room temperature to be con-
trolled centrally from the reception.
Benefit technology.
“We have great faith in this company – LG
Roger Jannicke, TGM GmbH for stressed travellers and busy fashion installation of LG’s ‘Art Cool’ air condi- Support during the expansion phases was By providing continuous assistance, air conditioners are maintenance-friendly
experts. tioners in the rooms and the Multi V III coordinated perfectly with LG delivering an excellent customer relationship and the company provides first-class
The hotel management’s high stand- units in the outdoor area did not disrupt the units as required and in accordance could be developed, which already service. We had high expectations and
ards and professional know-how guar- the day-to-day operations of the hotel. with the individual requirements of the cli- resulted in another cooperation these were fulfilled,” says Frank Rößler.
Ex Cesalpinia

“Our choice went to LG since it emerged as the


unique brand. LG designers’ expertise and active
collaboration have played a fundamental role, by
delivering all necessary information to help us start
in an optimal way the analysis and planning phase.”

Dario Ferrari
Technical Director, Brescia2Progetti

01

Ex Cesalpinia
Multi-Usage
Milan

Location Milan, Italy

Product Multi V lll, Multi V Mini


Multi-Usage Multi V lll, Multi V Mini

site’s total area of 67,900m3 has been split about conducting an analysis of was another important factor in our deci- heat exchanger systems (LG’s Eco V) were
three ways; 39,900m3 has been desig- heat dispersion and the effects of sion-making process. installed to ensure indoor air quality. Fur-
Background nated for residential dwellings (capable of weather conditions on the struc- “We were also impressed by LG’s experi- thermore, the Eco V effectively creates a
Ex Cesalpinia LG was involved in the installation
housing approximately 500 inhabitants),
13,000m3 for commercial purposes, and
ture’s internal temperature in or-
der to ascertain the most appro-
ence in overcoming challenging installa-
tion issues – some which were quite simi-
significant reduction in energy consump-
tion. Allowing the independent regulation
of air conditioning systems in four 15,000m3 for tertiary activities. priate solution lar in nature to those we were facing at the of each zone, the AC EZ central manage-
separate buildings in the Area Ex- Eight newly designed structures have Though not featuring an all-glass ex- Area Ex-Cesalpinia. In particular, there is a ment system provides convenient control
Location Cesalpinia, located not far from the been built for the redevelopment, includ- terior, Building D presented the same glass office tower not far from this site, in and monitoring for up to 32 indoor units.
Milan, Italy city center of Bergamo, Italy. Cov- ing a state-of-the-art, three level office fa- issue of temperature variation across which LG successfully installed their sys- Altogether, the installed system ensures
ering 67,900m3, the site is part of
cility. Located in the Area Ex-Cesalpinia’s different zones. Brescia2Progetti con- tem air conditioning products,” continued a heat rating of 486 kW in cooling and of
a large urban recovery project; the
inner quadrant, this well conceived office cluded that both sites needed a state of Mrs. Gabriella Moretti, Brescia2Progetti’s 548 kW in heating mode, with 18 exter-
land destined to be used for new
space can be easily adapted and repur- the art conditioning system that could Area Ex-Cesalpinia project leader. nal machines positioned on the roofing of
residential, commercial and tertiary
Issue posed for a variety of different business simultaneously provide warm and cool LG’s Multi V III and Multi V Mini systems each building.
purposes
Considering that the building needs. The building also features flowing air, in addition to effective air treatment. proved themselves the ideal solutions.
is used for multiple purposes, Headed up by the real estate arm of the glass facades that have been designed By implementing LG’s Multi V III in build-
simultaneous cooling and heating
Percassi Group, the extensive Area Ex- to enhance the comfort of those inside, ing C, it was possible to install a direct
Benefit
of different zones was necessary.

Solution
Cesalpinia project aims to reinvigorate an maximizing the amount of natural light expansion heat recovery system, able to
abandoned industrial area, which is only and indoor-outdoor flow. simultaneously heat and cool different
a short distance from Bergamo’s main zones. A direct expansion heat recovery LG solutions proved beneficial
railway station and downtown area. For The solutions proposed by LG in- system enables energy to be recovered due to their installation flexibility,
LG and Brescia2Progetti installed air con-
Solution its part in this major redevelopment initia- cluded the Multi V III and the Multi strong performance, low energy
ditioning systems in four separate sites from one zone for use in another, which
The solutions proposed by LG tive, LG worked in collaboration with local V Mini; products characterized by consumption and reduced main-
within the Area Ex-Cesalpinia. Most no- immensely increases AC output and re- tenance costs
included Multi V III and Multi V installation flexibility and the abil-
engineering company, Brescia2Progetti, table are the installations in buildings’ C duces operational costs.
Mini, products characterized ity to offer zoned comfort and
by individually zoned comfort to design air conditioning systems for four and D. These two buildings will be used Meanwhile, Building D’s commercially “LG’s products were perfectly able to
temperature regulation
that ensures great flexibility to newly erected buildings. for a mixture of commercial and tertiary purposed ground-floor units required a provide the maximum level of flexibility –
every tenants. The idea for this ambitious project origi- purposes. “During the initial phase of the project, we direct expansion heat pump system; the a determining factor for us,” commented
nated from a desire to rethink and renew evaluated a number of leading air condi- Multi V Mini. Efficient and easy to install, Mr. Ferrari. “Furthermore, they deliver a
a dilapidated part of Bergamo’s city- tioning brands. After completing our as- the compact Multi V Mini was the perfect significant reduction in power consump-

Challenge
scape, redefining its relationship with the sessment, we chose to go with LG. The fit for the job. tion and system maintenance costs.”
Consultant surrounding area. Once completed, it is company’s unique products offered the The solution devised and implemented Additionally, the flexible systems were
M/s Refrisynth Engineers anticipated that the Area Ex-Cesalpinia best blend of overall performance and by LG and Brescia2Progetti is character- installed without detracting from or in-
will increase the value of surrounding real Building C presented the greatest installation versatility,” said Dario Ferrari, ized by superior flexibility. Building D’s terfering with the clean aesthetics of the
estate and breathe new life into the local challenge. All the external surfac- Technical Director of Brescia2Progetti. AC system is comprised of 105 internal new buildings at the Area Ex-Cesalpinia.
economy.
es of the building are made en-
“LG’s expertise and willingness to col- ceiling units (4-way cassettes) connected
tirely from glass, with each face
Architect The cohesive design of the development laborate have played a fundamental role to ‘collectors’ and H/R box distribution “I am particularly proud of this suc-
subject to a different temperature
seamlessly blends nature with architec- in the success of this project; they were units. This was done in order to ensure cessful collaborative effort,” concluded
Shashi Prabhu & Associates at any given point throughout the
ture to create a calm, aesthetically-pleas- day. These circumstances re- instrumental in providing the information maximum adaptability, meaning the sys- Mr. Mario Leggieri from LG. “The pro-
ing environment. Plentiful green areas and quired the installation of a sys- necessary to help us design and imple- tem can easily be modified or rearranged ject went extremely well, thanks to the
a sense of openness remove any hint of tem capable of zoned heating ment an effective plan. The outstanding in the future. knowledge and expertise of LG’s highly
the location’s former industrial decay. The and cooling. Brescia2Progetti set price/performance ratio of LG’s products Completing the project, twenty enthalpy qualified engineers.”
12 17
Salento University

“Ultimately, LG’s Multi V offered the best perfor-


mance. I was personally able to verify that LG de-
livered the best coefficient of performance out of
all the products we evaluated. Moreover, LG of-
fered invaluable technical assistance, resulting in a
remarkable reduction in the length of the project.”

Leda Bonfantini
Engineer, University of Salento

02

Salento University
Education

Location Lecce, Italy Lecce

Product Multi V ll / lll, AHU


Educational Multi V ll / lll, AHU

ously provide effective temperature con- dently manage the temperature by different tini. “Ultimately, LG’s systems offered the The zone temperatures could be individu-
trol and impressive energy savings. users in different zones; therefore, any room
Background
best performance. I was personally able ally adjusted via VRF system while effec-
Once completed, the R1 and R3 buildings had to rely on a single apposite unit, requir- to verify that LG’s systems delivered the tive air exchange is ensured throughout
Salento will be used by departmental administra-
tive staff and professors. Meanwhile, the
ing a conditioning system that is modular best coefficient of performance out of all the building by the new treatment units.
The University of Salento sought and flexible enough. the products we evaluated. Moreover, LG
University effective and versatile air condi-
tioning solutions for a total of five
new R2 building is set to host a brand new
library and several lecture theaters.
Availability to interior renovation was also offered invaluable technical assistance
a key requirement by the University, which
Benefit
during the installation and implementa-
new and renovated buildings The state-of-the-art Technology Depart- needed a constant technical support and tion phases, resulting in a remarkable re-
ment Building is actually being loaned to professional referents to rely upon. duction in the length of the project.”
Location The University of Salento has grown the university by a consortium, which is LG’s high-performing solutions ef-
Multi V perfectly fit the needs of the uni-
Lecce, Italy significantly over the past 10 years, comprised of Italian companies, other lo- fectively helped reduce the project’s
versity: an all-in-one system able to man-
both in size and importance to the local cal universities and the National Research costs and length, while greatly en-
Solution
community. From modest beginnings, age air conditioning, provide hygienically
Council of Puglia. As such, the top-notch hancing energy efficiency; a key
it now boasts 10 faculties, 17 depart- fresh air and make a significant contri-
research and educational facility will be concern for the environmentally
Issue ments and 22 research centers, spread shared by the university and consortium bution to overall energy savings. LG has
With the objective of combining conscious Salento University
Only 60 days was given to equip across three campuses in Brindisi, Lec- members; playing host to a number of dif- delivered a system that optimizes the
environmental comfort with energy comfort of building occupants, reduces
with the new air conditioning ce and Arnesano. ferent academic and commercial activities “LG solutions were a perfect fit on each
system. savings and maximum flexibility,
In 2009, the University of Salento em- at any one time. energy and maintenance costs, and com- of our campuses”, said Mr. Mesiano.
LG has proposed a mix of condi-
barked on a project to upgrade and add bines maximum ease-of-use with opera- “Adopting powerful Inverter technology,
tioners and air treatment solutions the LG Multi V II is characterized by lesser
to its existing facilities. LG has been based on Multi V II and III systems tional flexibility.
absorption and boosted performance
heavily involved throughout this process,
Solution designing and providing air conditioning
systems for the university’s new R1, R2
Challenge LG’s modular air conditioning systems are
comparatively easy to install and man-
In R1 building, LG’s Multi V II system,
employing four-way indoor cassette
in comparison with more conventional
units. We are very satisfied with the
support LG technicians provided us
LG’s high-performing solutions
satisfied all project require- and R3 buildings (still under construction), Having to design incredibly flexible age, while the company’s superior tech- units, were installed along with LG’s Eco at every stage of the operation. That,
ments in a very short time by the Technology Department Building, and zoned air conditioning systems in nologies endow its Multi V with incredible V products. For R2 building, it was nec- combined with the cost effectiveness
reducing project costs and just 60 days proved a significant of the company’s products has been of
also the EX-INALPLI in Lecce. In each zone temperature regulation capabilities. essary to ensure that the volume of air
timing, enhancing efficiency,
case, LG’s main objectives were to opti- challenge for all concerned immeasurable value to us.”
Initially, the university’s engineers were flow met with current legislation (on a
mize comfort for students, teachers and thinking of installing chiller system. After
“Time factor was the key challenge we had per-classroom basis), providing a total of The high performance systems adopted
researchers, lower energy consumption
to face during the making of the project”, further research, however, they decided 5 AHU 10,000 m3/h and 2 AHU 15,000 by the University of Salento have been
and enhance AC operational efficiency.
says Mr. Giuseppe Mesiano, Engineer at to install LG’s Multi V systems, largely due m3/h. LG’s solutions combine the effec- combined with solar energy to bring about
Developer The company also sought to design and a significant reduction in environmental
The University of Salento. “We received the to their greater simplicity, and installation tiveness of traditional air treatment sys-
install systems that offered both simplicity impact and impressive energy savings.
RupTech Educational Society flexibility. The university engineers also tems with the flexibility of direct expan-
and greater flexibility. assignment at the end of May 2007 and we
In an analysis of energy consumption,
managed to complete the projects con- took into account the wealth of knowl- sion systems.
The EX-INALPLI is a new, three-storey LG’s systems demonstrated excellent
structure, purpose-built for the Faculty cerning EX-INALPLI, R1 and R2 by August. edge, support and planning expertise of- “Partnership between LG and SAMP performance coefficients compared to
of Fine Arts. It features both offices and In only 60 days, we completed the projects fered by LG’s personnel. were outstanding,” notes Giovanna Car- those of other systems. The company’s
Consultant classrooms, and plays host to around 300 by working on prototypes of the buildings”. LG’s products are also more convenient lettino from LG. “A local company, SAMP advanced air conditioning control system
“The flexibility of the installation was an- to install than chiller units as they require specializes in air treatment units; thanks allows precise energy consumption
Abid Hussain Consultants student and staff members per day. De-
management for every zone.
signed to offer its occupants a bright, new other key requirement to be fulfilled,” ex- less space for piping. “During the plan- to this partnership, we were able to offer
Through this project, LG has gained
functional space, the EX-INALPLI also plains Mrs. Leda Bonfantini, the engineer in ning phase of the EX-INALPLI building a superior technical solution that com- important recognition as the provider of
incorporates LG’s high-performance air charge of EX-INALPLI project. “In fact, the installation, we received proposals from bined air treatment and air conditioning outstanding solutions, and a reputation
conditioning systems, which simultane- project foresaw the possibility to indepen- several suppliers,” said Mrs. Bonfan- systems.” as an exceptional team player.
Bouygues Construction

“LG Multi V Water was a smart choice for Bouygues


since it definitely helped us achieve our ultimate
energy consumption target and be distinguished
as a global modern marvel.”

Jean-Charles Bertrand
Communications Manager, Bouygues Construction
01

Bouygues Construction
Office
Paris

Location Paris, France

Product Multi V Water ll


Office Multi V Water II

importantly, however, it will also set a new to heat or cool each space individually. 100%. The result is a 71% in water sav- in the summer of 2011, after a 56-day
yardstick in terms of complying with the Until now, the flow of water circulating in ings compared to conventional control. In test, water consumption was shown to

Bouygues Background most stringent environmental standards


on the planet. To do this, Bouygues is em-
the loop has been constant, not depend-
ing on the needs in terms of heating or
addition, the LG Multi V is a 3 reversible
tube system capable of simultaneously
have decreased by more than a third.
This in turn lowered the overall energy us-
ploying improved insulation techniques, cooling. handling hot and cold temperature in age of the facility via a very clever sensor
Bouygues decided to remodel its
Construction new headquarters into a global ref- harnessing energy from solar and geo-
thermic sources and taking advantage of
According to Marc Sarniguet, Bouygues’
Energy and Services Deputy Manager
rooms where thermal needs are opposed,
system. When water flow in the loop was
reduced, sensors installed in the heat
erence for environmentally-sound such as a floor office with numerous walls.
pumps detected the drop and decreased
building the latest eco-friendly innovations. of Maintenance and Construction, “We This latter technique was especially ap-
their own output accordingly, thus cutting
wanted to gain additional energy savings pealing to Bouygues Construction.
Location their power consumption. By project’s
The industrial group Bouygues was es- by adapting a special valve on our system This technology, developed by LG for end in 2014, a grand total of 70 Multi V
Paris, France tablished in France in 1952. Now a global with the aim of controlling the water flow Bouygues Construction, is an interna-
Challenge
Water Sync II groups will be installed in
presence, it maintains operations in 80 from the loop according to the real needs tional premiere. The Korean company has the Challenger headquarters complex.
countries and employs more than 131,000 of the building. The valve we have chosen also been particularly proactive during this LG’s solution has a few other notewor-
people. The Bouygues group is organized To match Bouygues’ objectives to is particularly suitable for hydraulic appli- project by bringing a Multi V Water Sync II thy capabilities as well. For instance,
Issue into five entities: Bouygues Construction cations in general, and more particularly, the system’s total coefficient of perfor-
significantly reduce energy foot- group on site and its engineers from Seoul
Bouygues’ ambitious renovation (construction, energy and services), Bou- the regulation of hydraulic circuits.” mance (C OP) comes in at a very impres-
print, new air-conditioning system to conduct on-site testing.
project has three interconnected sive 5.4. In other words, it generates 5.4
ygues Immobilier (real estate), Colas (in- had to be the most energy efficient
guiding principles: renovation,
expansion and a deep respect frastructure), TF1 (media) and Bouygues amongst those in the market times more energy than it consumes.
for the environment; accordingly, Telecom (telecommunications). Speaking on the advantages of LG’s
air-conditioning system had to be
the latest eco-friendly innovation.
In 1988, after two years of construction,
the new headquarters for Bouygues Con-
Since the redesign of Challenger’s energy-
usage paradigm is going to utilize photo-
Solution Benefit technology, Jean-Charles Bertrand,
Bouygues Construction’s Communica-
tions Manager for the Challenger Reno-
struction officially opened for business. voltaic and thermal panels, this implies that Automatic variable water flow Power, Performance, Savings and vation, said, “It is a smart choice for Bou-
Named Challenger, the complex became it will also need geothermal technology for control : a world premier LG Multi Durability have all been achieved: ygues. We’re convinced that the Multi V
Solution a technological showcase for the late 20th the water loop. The site is equipped with a V Water was chosen, and its strong with impressive COP of 5.4, water group’s ‘three tube’ system and ultra-thin
Excellent performance along
century. Twenty years later, Bouygues heat pump on dry probes – fitted with 75 performance was proven via on- consumption was saved by more 19-centimeter-thick indoor units are the
with energy savings were wants Challenger to remain a modern vertical sensors buried 100 meters deep site testing than 70% right choice for us as we move forward.”
fulfilled and proved via a 56- marvel, and the company has initiated a – and four temperature recording probes. Installed in the ceiling, these LG units
day field test, where the water very ambitious project to make it possible. The system works by using the soil tem- In order to make it functional, it was nec- The results were more than convincing: are ideal for buildings that require in-
consumption decreased by
more than a third, which in
Up until now, an undertaking of this mag- perature, which is collected by means of essary to improve the flow of the loop. in the summer of 2011, after a 56-day visible installations. Due to their ducts,
turn lowered the overall energy nitude has never been attempted on an a liquid flowing in a closed circuit. In addi- Among the three potential partners who test, water consumption was shown to the air conditioning units can be eas-
usage. office complex; the audacity of the job is tion to geothermal technology, the thermal were consulted, LG preIn order to make have decreased by more than a third. ily installed in the appropriate rooms
simply staggering. For instance, one of loop is fed by five adiabatic coolers that it functional, it was necessary to improve This in turn lowered the overall energy without having to change any systems
the myriad of high-reaching goals is to use the air and water of the phyto-purifica- the flow of the loop. Among the three usage of the facility via a very clever already placed in the ceiling.
reduce energy consumption on site not tion station to cool the water loop. potential partners who were consulted, sensor system. When water flow in the In addition to the technical capabilities
Consultant of the Multi V Water Sync II, the MULTI V
by a factor of two or three, but rather an This thermal loop, set up during the origi- LG prevailed by responding faster and loop was reduced, sensors installed in
Ferro ingenierie Water II has in its range a single mono-
eyebrow-raising factor of 10. nal construction of the Challenger com- by providing a variable water flow rate the heat pumps detected the drop and
bloc module of 63kW, whereas all other
From a designer’s broad perspective, the plex in 1988, carries the heated or cooled control system, based on the use of the decreased their own output accordingly,
competing models require two mod-
project has three interconnected guiding water through each building; the system Air Cooled VRF, coupled to a water flow thus cutting their power consumption. ules. This reduces the space required
Installer principles: renovation, expansion and a thus feeds the variable refrigerant flow control accessory that manages the valve. By project’s end in 2014, a grand total for installation, as well as reducing pow-
ETDE deep respect for the environment. Once (VRF) air conditioners installed in each When competitors didn’t success in mak- of 70 Multi V Water Sync II groups will be er requirements. These are features that
completed in 2014, Challenger will once building’s service rooms on each floor. ing the flow rate vary between 50 and installed in the Challenger headquarters will appeal to many market segments,
more garner recognition for being at the These devices work as heat pumps and 100%, the LG solution optimized it and complex. including construction companies, ar-
forefront of comfort and modernity. More allow the ducted indoor units in the ceiling offered a wider range between 35 and The results were more than convincing: chitects and system installers.
20 21

You might also like