Enviro Infra Engineers Limited 08 April to 14 April
17.5 MLD Sewerage Treatment Plant, STP-4 Nava Raipur, Weekly Progress 2023

Progres till Remarks


S.No. Facility Component Stage Current stage Last week target Target upcoming week
last week
CIVIL WORK
Bracket beam
TOC 301.85m
completed
Pipe Gallery (Header Raft completed
portion Header wall completed
Tie beam completed to complete this stage Achieved
SPS Bracket beam in progress pouring
column upto slab Shuttering/reinforcement
& concrete pouring
Slab pump house shuttering and beam Shuttering and beam Achieved Slab shuttering beam
reinforcement for reinforcement for circular bottom
circular portion portion
complered

Walls of grit chamber Wall-11 (Towards Reinforcement reinforcement in wall Achieved to complete Shuttering and
splitter box) completed concrete pouring
Wall-10 complete by all Shuttering and concrete Achieved
mean pouring
Wall-8 complete by all Shuttering and concrete Achieved
mean pouring
Wall-9 Reinforcement Shuttering and concrete Achieved
completed pouring
Wall-7 complete by all Shuttering and concrete Achieved
mean pouring
Wall-15 (Splitter Reinforcement Reinforcement in wall Achieved Shuttering and concrete
interconnection completed pouring
Mechanical Deflector beam
Foundations Grit Scraper beam
Walkway
Grit Classifier
Stair (4 flight) 2nd flight completed to achieve 2nd flight Achieved 3rd flight by all mean

Screw conveyor-1 Column pouring Bottom slab shuttering


Screw conveyor-2
W5A 1st lift completed upto Shuttering to be complete Achieved
Length 22.95m, Two 2.4m height for 50%
lift 3.6m -2nos length
2.4 m length upto 50% length of wall shall
W-1 be complete for first lift
Enviro Infra Engineers Limited 08 April to 14 April
17.5 MLD Sewerage Treatment Plant, STP-4 Nava Raipur, Weekly Progress 2023

Progres till Remarks


S.No. Facility Component Stage Current stage Last week target Target upcoming week
2.4 m length upto last week
W-1 be complete for first lift
2.4m height reinforcement binding Achieved
Length 6.1m height by all mean
completed by all mean
3.6m two lift 2nos wall
for 30% length
Wall W-3 50% of length up to full
4nos each length 6m reinforcement and binding Achieved height will be completed
3 Rapid Sand Filter by all mean
height 2.15 m
W-4 33% of wall length will
3nos wall each length be completd for first lift
6m height 3.6m by all mean
W-5
Launders
Level 297.13
Overhead Tank Columns To slab

Footing panel room completed


Column up to plinth completed
Plinth beam Panel room plinth
Plinth beam of panel room
pending
Column upto lintel Pump house column
up to lintel achieved
TWR Pump Chajja & Lintel
4
House Column up to bracket
beam
Bracket beam
Column up to slab
Slab
Brickwork
Plaster
Plinth Beam 296.5 Beam bottom completed Column up to plinth achieved Plinth beam complete by all
and reinforcement means of shuttering
Chlorine and binding in progress reinforcement and pouring
5 tonner
room
Chajja & Lintel beam
Slab
External plaster To complete 50% Qty
6 Blower Building Plaster
started

90 395 interconnection
Sector 26- 552m
balace
Sector 26 900 dia 100 175
Enviro Infra Engineers Limited 08 April to 14 April
17.5 MLD Sewerage Treatment Plant, STP-4 Nava Raipur, Weekly Progress 2023

Progres till Remarks


S.No. Facility Component Stage Current stage Last week target Target upcoming week
last week
Sector 26 800 dia 20 20 120
Sector 30-700 dia 100
PCC 50m 320 PCC 50m Dewatering
Nalla Training completed, work
9 Length 550m
work Toe wall 50m 250 Toe wall 50m initiate by Monday
Pitching 50m 180 Pitching 50m
17.5 MLD STP-4
Diesel Avg Consumption
Diesel
DATE Vehicle inssued OPNING R. CLOSING R. HRS AVG
01-04-2023 100 1947 1949.9 2.9
02-04-2023 1949.9 1952.7 2.8
03-04-2023 1952.7 1958.4 5.7
Excavator 210
04-04-2023 90 1958.4 1963.6 5.2
Tata Zexis in pipeline
05-04-2023 50 1963.6 1968.5 4.9
06-04-2024 50 1968.5 1972.9 4.4
07-04-2024 125 1972.9 1979.1 6.2

415 Diesel IN TANK 30 LTR 32.1 12.93

01-04-2023 100 3022.2 3025.7 3.5


02-04-2023 3025.7 3028.5 2.8
03-04-2023 3028.5 3030.6 2.1
Excavator 210
04-04-2023 80 3030.6 3035 4.4
Hyundai in pipeline
05-04-2023 3035 3039.2 4.2
06-04-2024 75 3039.2 3042.2 3
07-04-2024 40 3042.2 3046.3 4.1

295 Diesel IN TANK 50 LTR 24.1 12.24


01-04-2023 40 19 22.9 3.9
02-04-2023 30 22.9 25.1 2.2
03-04-2023 50 25.1 26.8 1.7
Excavator 210
04-04-2023 30 26.8 30.8 4
at borrow pit in soil filling
05-04-2023 70 30.8 37.7 6.9
06-04-2024 50 37.7 42.1 4.4
07-04-2024 90 42.1 47.8 5.7

360 28.8 12.50


01-04-2023 40 2060 2150 90
02-04-2023 15 2150 2182 32
03-04-2023 20 2182 2194 12
04-04-2023 hyva 8332 20 2194 2214 20
05-04-2023 20 2214 2232 18
06-04-2024 10 2245 2265 20
07-04-2024 10 2265 2295 30

135 222 1.64


01-04-2023 25 206574 206639 65
02-04-2023 15 206639 206668 29
03-04-2023 20 206668 206670 2
04-04-2023 hyva 6746 206670 206714 44
05-04-2023 20 206714 206737 23
06-04-2024 10 206737 206747 10
07-04-2024 10 206747 206773 26

100 199 1.99


17.5 MLD STP-4
Diesel Avg Consumption
Diesel
DATE Vehicle inssued OPNING R. CLOSING R. HRS AVG
01-04-2023 20 8956.1 8960 3.9
02-04-2023 8960 8961 1
03-04-2023 20 8961 8965 4
04-04-2023 JCB batching plant/STP 10 8965 8969.9 4.9
05-04-2023 20 8969.9 8972.2 2.3
06-04-2024 20 8972.2 8978.9 6.7
07-04-2024 10 8978.9 8982.8 3.9

100 26.7 3.75


01-04-2023 10 16212.4 16215.4 3
02-04-2023 10 16215.4 16219.4 4
03-04-2023 20 82.9 85.7 2.8
JCB at soil filling and
04-04-2023 20 85.7 89.4 3.7
levelling
05-04-2023 20 89.4 92.6 3.2
06-04-2024 10 16221.3 16224.1 2.8
07-04-2024 10 16224.1 16225.3 1.2

100 20.7 4.83

01-04-2023 5 2.1
02-04-2023 1.2
03-04-2023 1.5
04-04-2023 DG 7.5 KVA 10 3.2
05-04-2023 10 4.1
06-04-2024 5 2.5
07-04-2024 5 2.4

35 17 2.06
01-04-2023 5 2.1
02-04-2023 5 2.3
03-04-2023 1.5
Mobile crane -1
04-04-2023 10 2.5
(14 Ton)
05-04-2023 5 2.6
06-04-2024 5 2.4
07-04-2024 5 2.1

35 15.5 2.26
01-04-2023 10 2.4
02-04-2023 1.5
03-04-2023 1.9
Mobile crane -2
04-04-2023 10 2.8
(14 Ton)
05-04-2023 5 1.7
06-04-2024 5 1.8
07-04-2024 5 1.4

35 13.5 2.59
17.5 MLD STP-4
Diesel Avg Consumption
Diesel
DATE Vehicle inssued OPNING R. CLOSING R. HRS AVG
01-04-2023 71986
02-04-2023
03-04-2023
04-04-2023 Bolero 10
05-04-2023
06-04-2024 72236 250
07-04-2024 20 72236 72386 150

30 400 13.33
01-04-2023 5 3.1
02-04-2023 3.2
03-04-2023 3.1
04-04-2023 TRACTOR 3.5
05-04-2023 3.3
06-04-2024 3.6
07-04-2024 5 3.2

10 23 2.30
Diesel Diesel Stock
received Opening (In Diesel Diesel stock
DATE this week Liter) Name of vehicle Issued closing (In liter)
01-04-2023 458.12 JCB batching plant/STP 20 438.12
01-04-2023 438.12 JCB in soil levelling 10 428.12
01-04-2023 428.12 hyva 8332 40 388.12
01-04-2023 388.12 hyva 6746 25 363.12
01-04-2023 363.12 Mobile crane -2 10 353.12
01-04-2023 353.12 Mobile crane -1 5 348.12
01-04-2023 348.12 Excavator 210 tata in pipeline in pipeline
100 248.12
01-04-2023 248.12 Excavator 210 hyundai in pipeline 100 148.12
01-04-2023 148.12 Excavator 210 in Soil filling filling 40 108.12
01-04-2023 108.12 DG 7.5 KVA 5 103.12
01-04-2023 103.12 TRACTOR 5 98.12
02-04-2023 98.12 hyva 6746 15 83.12
02-04-2023 83.12 hyva 8332 15 68.12
02-04-2023 68.12 JCB in soil levelling 10 58.12
02-04-2023 58.12 Excavator 210 in Soil filling 30 28.12
02-04-2023 28.12 Mobile crane -1 5 23.12
03-04-2023 400 23.12 jcb new 20 403.12
03-04-2023 403.12 JCB batching plant/STP 20 383.12
03-04-2023 383.12 hyva 8332 20 363.12
03-04-2023 363.12 hyva 6746 20 343.12
03-04-2023 343.12 Excavator 210 in Soil filling 30 313.12
04-03-2023 313.12 hyva 8332 20 293.12
04-03-2023 293.12 jcb new 20 273.12
04-03-2023 273.12 Excavator 210 in Soil filling 30 243.12
04-03-2023 243.12 DG 7.5 KVA 10 233.12
04-03-2023 233.12 mobile crane -2 10 223.12
04-03-2023 223.12 bolero 10 213.12
04-03-2023 213.12 JCB batching plant/STP 10 203.12
04-03-2023 203.12 Excavator 210 tata in pipeline 90 113.12
04-03-2023 113.12 Excavator 210 hundai 100 13.12
04-03-2023 13.12 Mobile crane -2 10 3.12
05-03-2023 576.72 3.12 Excavator 210 tata in pipeline 50 529.84
05-03-2023 529.84 Excavator 210 in Soil filling 70 459.84
05-03-2023 459.84 Mobile crane -2 5 454.84
05-03-2023 454.84 mobile crane -2 5 449.84
05-03-2023 449.84 hyva 8332 20 429.84
05-03-2023 429.84 hyva 6746 20 409.84
05-03-2023 409.84 JCB in soil levelling 20 389.84
05-03-2023 389.84 JCB batching plant/STP 20 369.84
05-03-2023 369.84 DG 7.5 KVA 10 359.84
05-03-2023 359.84 TRACTOR rent 10 349.84
06-03-2023 349.84 Excavator 210 tata in pipeline 50 299.84
06-03-2023 299.84 Excavator 210 hundai 75 224.84
06-03-2023 224.84 mobile crane -2 5 219.84
06-03-2023 219.84 Mobile crane -2 5 214.84
06-03-2023 214.84 hyva 8332 10 204.84
06-03-2023 204.84 hyva 6746 10 194.84
06-03-2023 194.84 Excavator 210 in Soil filling 50 144.84
06-03-2023 144.84 JCB batching plant/STP 20 124.84
06-03-2023 124.84 JCB in soil levelling 10 114.84
06-03-2023 114.84 DG 7.5 KVA 5 109.84
07-03-2023 109.84 bolero 15 94.84
07-03-2023 400 94.84 Excavator 210 tata in pipeline 125 369.84
07-03-2023 369.84 Excavator 210 hundai 70 299.84
07-03-2023 299.84 Excavator 210 in Soil filling 60 239.84
07-03-2023 239.84 JCB batching plant/STP 10 229.84
07-03-2023 229.84 JCB in soil levelling 10 219.84
07-03-2023 219.84 mobile crane -2 5 214.84
07-03-2023 214.84 Mobile crane -2 5 209.84
07-03-2023 209.84 hyva 8332 10 199.84
07-03-2023 199.84 DG 7.5 KVA 5 194.84
07-03-2023 194.84 TRACTOR 5 189.84
07-03-2023 189.84 hyva 6746 10 179.84
total 1376.72 1655