GEA PROCESS ENGINEERING

Project Name - ESP erection & commissioning Document No:- HIL/JSA/EHS-01

Activity- Fabrication & erection of assembly bed


Rev-0

JOB SAFETY ANALYSIS


Location of Work : Smelter -1 ,ESP
JSA No- 01

Sr. Sub Activities / Tasks Hazards Impact in case of exposure Risk Control measures (There can be multiple control measure for one hazard) Responsibility
No.

1 Work start-up preparation & Un authorized work Physical Injury Must be followed HIL permit system site engineer and
obtaining work permit Invalid permit Property damage Supervisor must insure that all work activities are carried out by competent Supervisor
Lack of competency stuck worker in case of person
Poor communication emergency Conduct tool box talk meeting
Hast or shortcuts Review the method
Don’t aware with plant emergency Responsible person will conduct inspection
Consider all potential hazards: weather, wet or slippery conditions, overhead
hazards, proximity to trails and/or visitor traffic patterns/volume, slope, loose
footing, elevation, fatigue, hazardous insects or plants, etc.
awarness regarding HIL emergency procedure

2 shifting of materilas from storage Toppling or Falling of material Physical Injury Only competent and approved operator shall be deployed for equipment Rigger and Site
area to esp area by hydra & trailor Mechanical failure of lifting tools and Property damage operations. engineer and
tackles pinch point Equipment to be tested and certified by competent person before deployment. Supervisor
Improper lifting Procedure No overloading allowed.
using of defective equipment ( Tools and Follow procedures.
Tackles ) Training and assistance of Banks man / Rigger
Over loading. Must be followed HILPermit
traffic accident approved lifting plan must for crane / hydra lifting
All equipment must be third party certified.
Operators should be certified and valid license holder Equipment to be
inspected daily and all defects reported
3 Grinding cutting & welding of Radiation can damage Must be followed HIL hot work procedure fire watch and Site
structure platform Burns eyes and skin Use specified shielding devices and other PPE of correct specifications engineer/
Fire hazard Explosion may occur Move out any leaking cylinder Supervisor/site hse
Explosion May cause fire Cylinder Keep trolley for transportation of cylinders and chain them
Tripping may burst Use flash back arresters
Leaking gas cylinder or hoses Welders cataract Use double stage regulatores
Rotating equipment sparks Burn Injury Purge regulators immediately and then turn off.
Damage / burst grinding wheel Lung ailments Never use grease or oil on oxygen line connections and copper fittings on
Electrocution Dermatitis acetylene lines
Dust Hit injury / crush injury Work area should be barricated and sigage posted.
Flying object eye injury Electric ShockFire / only trained and competent person only allowed
Welding radiates invisible ultraviolet Explosion Asphyxiation use dust mask
and infrared rays use job specific ppe's
Improper placement of oxygen and
acetylene cylinders
Leakage / cuts in hoses
Opening – up of cylinders
Radiation harmful to naked eyes
Splinters / slag
Toxic fumes

4 Housekeeping and material Personal injury Incident / Injury Site Supervisor


removal after job complete Slip and trip Property Damage. Must be used dust mask
Dust exposure Followed material handling technique
ergonomic Proper communication
Housekeeping awareness program to all employee

Approved By-

Prepared & Analysis by :- Danish (HSE),s.mujmdar(site incharge),


P.chinnamaharaja(site eng)