Electric Evacuation Patan-3-3
Electric Evacuation Patan-3-3
BoilerSection
Only power house feeder (PCC) and ACB tube install.and after finalising the next enquiry
ofcabel laying and Connection to allpanels.because boiler.DM plant.and RBC manufacturer will
be given allMCC all panels.
Breaker No’s of
loadto Motor
SR No’s Total
Main Incomer – 1000AMP be (HP) Starter
No. Feeder load
degine
and SLD
Return bagasse carrier(on-door You
1 1 25 37A S/D
Interlock/bypass switch) defined
2 Bagasse blower You 1 10 13A DOL
defined
Changes over switch feed pump to DG set You
3 2 2 250A S/D
/ M.S.E.B / T.G defined
4 D.M Plant Main Switch You 1 6 25A DOL
defined
5 ID.FD.SA.Scrubber.bagasse feeder.feed You Design 7 1000A As boiler
pump.transeper pump. defined purchase
scope
PowerHouseTurbine:-
Turbine and generator set (1.5 MW)are purchasednewly.OnlyPCC and breakerfeeder to be
provided at power house and remaining cabel laying andconnection to TG set MCC panels
enquiry will besubmitting after finalize the enquiry of remaining work.
SR.
Title Load
No.
1 Power House Turbine 35 A
BoilingHousesection
Crystallizers
Crystallizers
Centrifugal section
Factory will be purchased 1 continued machine and 1batch type machine hence we need only
at power house station breaker and PCC panels. after finalising next enquiry of cabel laying and
connection at both the motors.
Sugar house
ETP will be purchased Clint Only you are do power house breaker and PCC
panels.after finalize enquiry of cabel laying and conntivity of all motor of
ETP.
Factory Lighting
SR.
No. Title Load Breaker
Factory Lighting
60 A 90 A