Professional Documents
Culture Documents
Summary of National Infrastructure and Construction Pipeline 2017
Summary of National Infrastructure and Construction Pipeline 2017
Summary of National Infrastructure and Construction Pipeline 2017
40 £20.0
30
20
10 Transport
£56.8
£134.1
0
2017/18 2018/19 2019/20 2020/21 Energy
Transport Digital infrastructure
Energy Science and research
Utilities Flood and coastal erosion
Social Infrastructure
*Regulatory control periods in some utilities sectors come to an end in 2019/20 and no assumption for spending in future control periods has been included.
The pipeline therefore represents an underestimate of actual investment, particularly in the year 2020/21.
Projects and programmes in the pipeline will Projects and programmes in the pipeline will be
benefit the entire country delivered through a mixed funding model
MIDLANDS ENGINE: NORTHERN POWERHOUSE: Flood and
● The Wolverhampton ● The ongoing Northern Hub coastal erosion
Canalside and City improvements programme, Science and
Interchange project creating a increasing rail capacity across Research
modern railway station the north of England with faster Digital infrastructure
handling more than and more frequent services
4.7 million passengers a year. connecting key towns and cities. Social Infrastructure
● Upgrading the M1 junctions ● New rolling stock for the Tyne
13 to 19 to a Smart and Wear metro, replacing old Utilities
Motorway to relieve stock with modern
congestion and reduce energy-efficient trains. Energy
journey times. ● £243m of the new Transforming
● £250 million of the new Cities Fund has been allocated Transport
Transforming Cities Fund to Greater Manchester, £134m
has been allocated to Liverpool and £59m for £0 £10 £20 £30 £40 £50 £60 £70 £80 £90
to the West Midlands. Tees Valley.
Central Government Local Government
Private Mixed funding source
SOUTH WEST: EAST OF ENGLAND:
● The first major ● The new town of
Northstowe in
concrete was poured
at Hinkley Point C in Cambridgeshire will We estimate public and private investment of
around £600bn over the next 10 years
March 2017. Hinkley provide 10,000 new
Point C will provide homes alongside a
enough electricity to town centre.
power nearly six million ● This year work began
homes. to upgrade the A14 Utilities
● Government will help to between Ellington to
improve access to the the Milton junction on
A391 near St Austell by the Cambridge Economic
providing £79 million Northern Bypass, £104bn infrastructure
towards a new A30 link providing additional
road, supporting housing capacity to
development in the area. the region.
● £80m from the new ● £74 million of the new £216bn
Transforming Cities Fund Transforming Cities
has been allocated to the Fund has been
West of England. allocated to
Cambridgeshire and £117bn
Peterborough.
SOUTH EAST AND LONDON: Social
● Northern line extension to Battersea will help regenerate the Vauxhall, Nine Elms and infrastructure
Battersea areas.
● Thames Estuary Flood protection programme, protecting 1.3m people.
£160bn
● Brighton and Sussex University Hospital trust investing to improve the patient experience and
providing state of the art facilities.
We have a strong track record of infrastructure delivery in the UK. Since 2010 over 4,500 infrastructure
projects were completed and 98% of our 158 priority projects are either completed or on track to deliver.
EAST OF ENGLAND:
● M1 Junction Energy
10-13
improvements Over 100 renewable projects are
● The first subsidy currently under construction across the
free solar farm
located in Clay Hill
UK, which will provide 5.6GW of new
● New north rail capacity
terminal at the
Port of Felixstowe
Utilities
SOUTH WEST: SOUTH EAST AND LONDON: Beauly-Denny Overhead Transmission
● Improved access to Torbay ● Lee Tunnel preventing sewage Line was completed in 2015, transmitting
and South Devon via the A380 overflow into the Thames renewable energy from Scotland across
Kingskerswell Bypass Devon ● The Francis Crick Institute for the UK
● Says Court Farm Solar Park biomedical research
● Reinstating the Dawlish Rail line ● M3 J2-4A Smart Motorway
scheme
Digital Infrastructure
Superfast broadband coverage has
more than doubled since 2010, with over
4.5 million additional premises receiving
access