Professional Documents
Culture Documents
Field Audit Team Format - Elect v.1 2
Field Audit Team Format - Elect v.1 2
3 Earthing Scheme
Number of earth pits
Lightening arrestor tower, building, DG exhaust
Earthing system DG and points of connection
Earthing system UPS
Earthing system DCPP
Earthing system Transformer and Electrical distribution
Earthing system isolation Transformer
1 Surge arrestors
Make
Model, Type
Place of location
(All main incomers and wherever we have a separately
derived neutral)
2 Lightning arrestor
Make
Model
Data/signal line surge protection for Tower, DDF and
3 data line
Remarks / Comments
Class of arrestor
3 Maintenance log
Maximum and minimum loading observed in last 30 days
Number of times loading more than 80%
Votage fluctuations observed
Frequency fluctuations
Kwh or units generated
Running duration
Lube oil pressure - min/max
Coolant / Water temperature - min/max
Operational Data log - Fuel consumption (weekly or monthly)
Safety checks - Any instances of DG tripping
Engine trip
Alternator trip
Hi speed
Earth fault
Over voltage
High coolant temperature
Low lube oil pressure
1 Capacity configuration
4 DG Fuel storage
Day tank capacity
Bulk storage capacity, if available
5 Availability of tools
6 Availability of spares
Cables exposed to atmosphere and animals; through cable ducts; safety of cables; etc.
Auto/Manual mode; Synchronization of DGs - if yes, using what (relay/PLC)
Yes or no; if yes, where and how securely handled; how fuel purchase or storage is monitored
Value in litres
Yes or no; if yes, where and how securely handled
Check if present or not; check its records for the last few months
Run the DG for five mins While doing the 12 hrs recording on D
Data to be got from the analyzer and visual inspection during the audit; make su
Check manual/auto; synchronization of DG - if yes, using relay/plc
1 Battery AH capacity
2 Make, Model
3 Number of cells per bank
1 Discharge test - load transfer to battery and back for a duration safe as per the installation approved by
eport - Battery Bank
Remarks / Comments
Close by or far off to the UPS; on racks or on floor; health of racks/mounting scheme for the batteries
Check the condition of the isolator; class and type as well
Temperature measurements
1 Battery AH capacity
2 Make, Model
3 Number of cells per bank
1 Discharge test - load transfer to battery and back for a duration safe as per the installation approved by
eport - Battery Bank
Remarks / Comments
Close by or far off to the UPS; on racks or on floor; health of racks/mounting scheme for the batteries
Check the condition of the isolator; class and type as well
Temperature measurements
1 All Equipments
Make, Model, Type, Rating, Year & Month of
Installation
a Transformer
b AMF Panels
c Static Transfer Switch
d AVR
2 bus bar size, breaker size, Setting, Protection in Main Dist panel
3 Ratings of breaker, fuses and cables
Remarks / Comments
wooden plank/ RCC; covered or inside; how far from building; locked; security status
2 Electrical Scheme
Number of rectifiers
Ratings of each
Number of PDF at the output of rectifier
Connectivity rectifier from to Panel
Earthing schematic - No of earth pits, type
Redundancy (n, n+1, n+n)
1 Rectifier ratings
2 Distribution and PDF/DCDB rating
3 DCDB's Schemes and Ratings
4 Cable Ratings
5 Battery make and configuration
6 Cable ratings
S No Earthing
connected to
1 DCPP
2 PDF
3 Rack
4 Earthing bar
Remarks / Comments
Half wave, full wave, bridge rectifier, etc.; diodes/thryistors used in the rectifiers
Through cables; rating of cables; through a bus-duct; how far from panel
Thermograph images
Proper routing; easily identifiable; color coded
Material Size Also note the present state of earthing; type, loose/tight, etc
ing; type, loose/tight, etc.
Report - UPS
2 Thermography Temperature
Remarks / Comments
through cables/bus-bars; how far; how good the connection; size of cables/bus-bars
No. of redundancies built for the UPS and the associated wires
temperature sensor
Earthing
S No Earthing
connected to Material Size
1 DCPP
2 PDF
3 Rack
4 Earthing bar
Gauss limits
Minimum
1 phase 20A 50 mm
3 phase 50 A 150 mm
3 phase 100 A 300 mm
less than 20 gauss