Professional Documents
Culture Documents
S13.s1 ACTUALIZADO LECTURA PARA EL CONTROL DE LECTURA 03
S13.s1 ACTUALIZADO LECTURA PARA EL CONTROL DE LECTURA 03
Proceedings of the International Conference on Health and Medical Sciences (AHMS 2020)
Abstract— The development of high rise building in the of OHS Management Systems to Indonesia Government
territory of Indonesia is increasingly growing. The more Regulation Number 50 of 2012 and ISO 45001: 2018 which
building construction projects that are running, the higher the affect the Safety Performance in the Company X.
number of work accidents that will occur. Therefore, all
construction companies must implement a Workforce Safety
and Health System which is an important aspect in a project II. LITERATURE REVIEW
which means to protect workers from the risk of accidents.
Company X operates by prioritizing safety and quality (safety A. Safety in Construction Project
& quality). We maintain our commitment to prioritizing safety Construction is heavy work which involves many
and health in the workplace. The Company X synergizes with elements. Not only humans as workers, but also other
systems (technology) and people (employees, partners, and supporting elements. From the use of heavy equipment to the
other stakeholders) to successfully implement a superior involvement of large amounts of material. This causes the
occupational safety and health management system. The construction world to have a higher risk of work accidents
implementation and development of OHS Management compared to other types of work. That is why all parties must
Systems and the environment in the Company are understand the importance of applying safety to construction
implemented in accordance with OHS Management Systems projects. The following is an overview of the elements
standards based on ISO 45001: 2018 and environmental
involved in a construction project:
management systems based on ISO 14001: 2015 [1]. With the
safety and health management system that has been owned by Owner Technical
Installation
Company X, the authors are interested in evaluating the the
OHS Management System. Contractors Public
Construction
Keywords— Occupational Health and Safety Management Project
System, PP 50 Tahun 2012, ISO 45001:2018 Sub- Suppliers
Contractors
275
Advances in Health Sciences Research, volume 34
III. METHOD
A. First Stage
The first step is collecting the data needed to find out
how the OHS Management System is applied to the research
object, OHS Management System at Company X. others by
conducting in the Company interviews with parties related to
Company X OHS Management System. Interviews will be
conducted with employees at the QSHE Bureau at Company
X. The purpose of this interview is to know the Company X
OHS Management System validly and thoroughly.
Fig. 4. Performance Evaluation, Source: (Dentch, 2018) [6] TABLE III. DOCUMENT ACCESS PERMISSION REQUEST
Document
2) Improvement No. Document Access
Opportunities in developing OHS System can be found Permission
through management reviews and internal audits, referring to I. General Document
the results of the supervision of the implementation of OHS 1. Safety Policy Company X
System. Opportunities to improve OHS System performance 2. Safety Guidelines Company X
are also obtained based on incident reports, nonconformity
3. …
reports, and corrective action reports while dealing with
problems that occur. II. Procedure Document
1. Personal Protective Equipment Procedure
Continuous development is carried out to improve the
2. Procedure..
performance of the occupational safety and health
management system. Organizations need to make continuous III. Supporting Document
development to improve suitability, adequacy, and 1. Safety Program Company X
effectiveness of OHS Management System. Sustainable 2. …
development can be done through the following things:
B. Second Stage
Improve OHS performance by reducing hazards and
incidents, minimizing OHS risks, reducing factors The second stage is to assess the level of compliance of
that contribute to poor health such as noise, dust and Company X OHS System based on Indonesia Government
smoke. Regulation number 50 of 2012 and international standard
ISO 45001: 2018. The study was conducted by examining
Promoting worker participation in implementing the level of OHS compliance according to these points.
continuous improvement programs.
The first is to validate the research instruments of the
Communicating the results of continuous experts. This is to ensure that the instrument complies with
improvement to workers and workers' representatives. these regulations and standards and to develop the instrument
if there are deficiencies. The questionnaire regarding the
276
Advances in Health Sciences Research, volume 34
validation of the research instrument is in Appendix 2 and in and follow-up to the compliance criteria that have not been
the following table: met or can be developed.
TABLE IV. RESEARCH INSTRUMENT VALIDATION TABLE VI. RECOMMENDATIONS AND FOLLOW UP
Do you agree
that the Compliance Present Recommendations
No. Reference
indicator is Criteria Condition and follow up
relevant to 1.
Variabel Indicator Reference OHS …
Management …
System in
Company X
Yes No
XI Safety Policy IV. RESEARCH VARIABLE
The
organization The research variable is basically anything in the form of
understands what is determined by the researcher to be studied in order to
internal issues obtain information about it, then draw conclusions. The
that can affect
the
research variable is an attribute, trait or value of people,
implementati objects, or activities that have certain variations set by
on of OHS researchers to be studied and researched to be able to draw
Unders System ISO conclusions [8].
tanding (organization 45001:2018
of the al goals, , Dentch
1 TABLE VII. X VARIABLE
X1.1 organiz organizational (2018),
ation structure, Sadiq
roles and (2019) Variable Sub Variable
and its
context responsibilitie X1.1 Initial review of Safety
s,
X1.2 Safety Policy
organizational
resources, X1 Safety Policy Job Description, Responsibility, and
organizational X1.3 Authority
work Establish goals and objectives of the
processes, X1.4 OHS policy
etc.) Hazard identification, project OHS
goals, OHS risk control, OHS
2 … … X2.1 programs, and costs
1 … … X2.2 Risk management planning
X1.2
2 … … X2 Safety Plan Use performance indicators as an
X2.3 evaluation of Safety performance
Data collection is done by compiling Company X OHS Compliance with laws and other
System which has been validated, then carried out an X2.4 requirements
assessment (gap analysis) referring to compliance points X2.5 Safety Programs
according to the regulation. The OHS Management System Trained personnel, facilities and
compliance points based on Indonesia Government X3.1 funds
Regulation Number 50 Year 2012 attached to Appendix 3 Safety X3.2 Operation control
and the following in Table 5.4 are examples: X3 X3.3 Document control
Implementation
X3.4 Administrative control
TABLE V. RESEARCH INSTRUMENT X3.5 Emergency response procedure
Monitor, measure and evaluate
Criteria for X4.1
Present Relevant Monitoring and performance
No. Fulfilling Assessment X4
condition documents Evaluation X4.2 Internal Audit
OHS
1. Safety X4.3 Corrective action
Policy
1.1 Understanding of the organization and its context Safety X5.1 Re-discuss evaluation / inspection
1.1.1 … X5 Performance
… Review and
1.2 Evaluate the effectiveness of The
Improvement X5.2
Implementation OHS System
… …
C. Third Stage
Third stage is providing recommendations and follow-up
actions based on the results of the gap analysis. Data
collection will be carried out by interviewing the safety
Expert. Literature studies are also used as additional
references in providing recommendations and follow-up. The
following is an overview of the format of recommendations
277
Advances in Health Sciences Research, volume 34
TABLE VIII. Y VARIABLE namely as in the following Table 5.1. The evaluation scale
Variable Sub Variable Indicator
has also been validated by experts to get recommendations or
Leadership improvements related to the rating scale.
1 and
Commitment
TABLE IX. SCORING SCALE
Commitment Occupational
Y1.1
and Policy Safety, Scoring information
2 Health and
Environment There are no procedures yet and
Policy 0
have not been implemented
Hazard
Identification,
1 Assessment There are procedures that have not been
and Control 1 implemented, or have been carried out
of HSE Risk but without procedures
Y1.2 Planning
Legislation
2 and Other
Requirements There are procedures and have been
Purpose and 2
3 implemented but are less consistent
Target
Human
Resources, There are procedures and have
1 3
Facilities, been implemented
OHS Funds consistently
Management Supporting c.
Aditya Nugroho, 2019
Y1 Y1.3 Implementation 2
System Activities
Company X
Data obtained through this assessment is ordinal type
Operational data, then the percentage of compliance level measurements
3
Control
Emergency or
are taken as follows. This percentage of compliance level
4 aims to provide a general description of the implementation
Disaster
Performance of OHS System at Company X. The following is the formula
1
Monitoring used to calculate the percentage of compliance:
and
Measurement Percentage of Compliance = a/b x 100%
2
Conformity Information:
Evaluation
Measurement Investigation a = Completion Rate Points Obtained
Y1.4
and Evaluation of Incidents, b = Total Compliance Points
Non-
compliance, Third Stage
3
Corrective
Actions and C. Third Stage
Preventive
Measures The third stage is giving recommendations and follow-
4 Internal Audit up based on the results of the level of Company X OHS
Review and
Y1.5
Improvement Review and Management System compliance. Recommendations and
1
Improvement follow-up are given through the results of interviews by
Safety experts and literature studies. The purpose of this
b.
Source: Aditya Nugroho, 2019 stage is to obtain recommendations and follow up that can be
applied so that the OHS management system can meet the
V. DATA ANALYSIS regulatory requirements and standards used, as well as a
means to carry out continuous development in designing the
A. First Stage OHS management system.
The first stage is the stage to identify and validate
Company OHS System. The analysis is done by describing
VI. CONCLUSION AND LIMITATION
the results of the interview and outlining the contents of
Company X OHS System documents that can be obtained The conclusion of this study is to conduct an evaluation
during the study. or assessment of the level of compliance with the safety and
health management system at Company X. This study uses
B. Second Stage regulations and OHS standards as the basis of the level of
OHS compliance. The regulation used is Indonesia
The second stage is the assessment of Company X OHS Government Regulation Number 50 of 2012 concerning the
System compliance level based on Government Regulation application of occupational safety and health management
number 50 of 2012 and international standard ISO 45001: systems. The standard used is ISO 45001: 2018 about
2018. The analysis is carried out as in Table 3.4, namely by Occupational Health & Safety.
presenting the current conditions, writing relevant documents
and evidence of work or activities, and filling out an This research was conducted at Company X. Data
assessment based on both of them. The rating scale is collection was carried out by interviewing parties related to
determined based on the scientific journal Yahya (2018) on the Safety field at Company X, namely the QSHE (Quality
OHS System evaluation referring to ISO 45001: 2018 Safety Health and Environment) Bureau. The assessment is
278
Advances in Health Sciences Research, volume 34
279