Collect and lay uPVC ducts including excavation , backfilling and joint with existing duct
in trench; Depth not exceeding 1.5m with duct markers, bed and surround as per
authorities requirements, warning tape including all necessary items to complete the
work (Bed and Surround measured separately).
Ducts
Collect lay and joint uPVC cable ducts (D54) 100 mm diameterin trenches
including Excavation, Backfilling, Bed and Surround,Warning tape, Duct
markers, FO Cable, all necessary fittings,connection to existing ducts
including all necessary items to items to complete the work (Bed and
Surround measured separately).