Project: Al Mairid Development Phase-1 Roads And Infrastructure Works (Road Works Only)

Client : Ras Al Khaimah Dredging Company Private JSC.


Engineer : STANTEC UK, Dubai Branch
Contractor : RADCO Roads & General Contracting LLC

ITEM Nr DESCRIPTION UNIT QUANTITY

WORKS FOR - WATER DIVISION


Ducts

Collect and lay uPVC ducts including excavation , backfilling and


joint with existing duct in trench; Depth not exceeding 1.5m with duct
markers, bed and surround as per authorities requirements, warning
tape and including all necessary items to complete the work (Bed and
Surround measured separately)

A 1way, 150mm diameter Future ducts m 962.41

Collect and lay HDPE ducts including excavation , backfilling and


joint with existing duct in trench; Depth not exceeding 1.5m with duct
markers, bed and surround as per authorities requirements, warning
tape and including all necessary items to complete the work (Bed and
Surround measured separately).

B 1way, 160mm diameter Future ducts m 466.80

C 1way, 250mm diameter Future ducts m 550.80


Project: Al Mairid Development Phase-1 Roads And Infrastructure Works (Road Works Only)
Client : Ras Al Khaimah Dredging Company Private JSC.
Engineer : STANTEC UK, Dubai Branch
Contractor : RADCO Roads & General Contracting LLC

ITEM Nr DESCRIPTION UNIT QUANTITY

WORKS FOR ELECTRICITY DIVISION

Ducts

Collect and lay uPVC ducts including excavation , backfilling and joint with existing duct
in trench; Depth not exceeding 1.5m with duct markers, bed and surround as per
authorities requirements, warning tape including all necessary items to complete the
work (Bed and Surround measured separately).

For 11Kv Cable

A 2 x 6 way, 150mm diameter, ducts m 1,124.68

B 2 x 12 way, 150mm diameter, ducts m 191.28

For 33Kv Cable

C 2 x 8 way, 200mm diameter, ducts m 21.74


Project: Al Mairid Development Phase-1 Roads And Infrastructure Works (Road Works Only)
Client : Ras Al Khaimah Dredging Company Private JSC.
Engineer : STANTEC UK, Dubai Branch
Contractor : RADCO Roads & General Contracting LLC

ITEM Nr DESCRIPTION UNIT QUANTITY

WORKS FOR ETISALAT

Ducts

Collect lay and joint uPVC cable ducts (D54) 100 mm diameterin trenches
including Excavation, Backfilling, Bed and Surround,Warning tape, Duct
markers, FO Cable, all necessary fittings,connection to existing ducts
including all necessary items to items to complete the work (Bed and
Surround measured separately).

A 2 way, 100mm dia; Depth n.e. 1.5 m m 297.20

B 4 way, 100mm dia; Depth n.e. 1.5 m m 552.33

C 6 way, 100mm dia; Depth n.e. 1.5 m m 9.38