S.NO. Disciption LENGTH (m) NUMBER DIAMETER (mm) AREA (m2) VOLUME (m3)
LENGTH (m) (mm) (m)
1.2 1.2
13 25.72 6 154.32 10 0.000079 0.01212 - -
1.2 1.2
14 25.71 2 51.42 10 0.000079 0.00404 - -
0.4 0.4
Mesh
Type 1 7.80 2 15.60 8 0.000050 0.00078 - -
0.000000 0.00000
0.000000 0.00000
Total= 0.304361
S.NO. Disciption LENGTH (m) NUMBER TOTAL DIAMETER (mm) Spacing Spacing
LENGTH (m) AREA (m2) VOLUME (m3) (mm) (m)
100 100
100
d3 4.61 12 55.27 12 0.000113 0.00625 - -
800
800
600
600
Total 0.241067
S.NO. Disciption LENGTH (m) NUMBER TOTAL DIAMETER (mm) Spacing Spacing Clear Cover
LENGTH (m) AREA (m2) VOLUME (m3) (mm) (m)
RCC I- Girder
RCC Deck slab & cross Girder
4 15.97 2 31.94 25 0.000491 0.01568 - -
150 150 RCC abutment and abut cap
RCC pile and pile cap
RCC crash barrier
RCC reaction block
4a 15.97 2 31.94 25 0.000491 0.01568 - -
Overlaping Length =
Distance between 2 long.
Girder=
Thickness of long. Girder Widedn
7.32 2 14.64 0 0.000000 0.00000 - -
800 Thickness of long. Girder Narrow=
0.50
200
800
0.50
9.52 3 28.56 0 0.000000 0.00000 - -
0
9.52 3 28.56 0 0.000000 0.00000 - -
0.40
At Corner Portion
0.62 7 4.34 0 0.000000 0.00000 - -
0.04 mm
0.04 mm
0.04 mm
0.075 mm
0.04 mm
0.04 mm
0.80 m
2.90 m
1.00 m
0.30 m
5 No.
10.40 m
3.80 m
6.60 m
0.23
1.55
0.23
1.55
100 100
200
d3 5.02 0 0.00 0 0.000000 0.00000 - -
800
800
Total= 0.000000
S.NO. Disciption LENGTH (m) NUMBER TOTAL DIAMETER Spacing Spacing
LENGTH (m) (mm) AREA (m2) VOLUME (m3) (mm) (m)
100 100
2a 15.20 27 410.51 12 0.000113 0.04643 150 0.15
100 100
2 15.20 160 2432.64 12 0.000113 0.27513 140 0.14
1000
7 1.22 95 115.52 12 0.000113 0.01307 200 0.20
140 1272.8
6 2.47 115 283.80 10 0.000079 0.02229 200 0.20
200
200
1000
3 5.34 149 795.36 12 0.000113 0.08995 150 0.15
1000
Total= 1.308642
REHABILITATION AND UPGRADING FROM FOUR LANING OF BINJABAHAL TO TELEBANI SECTION FROM
KM. 414.000 TO 491.70 OF NH-6 (NEW NH 49) IN ODISHA
Reinforcement Quantities