Project documentation

New project
Any Company
Project number: ---
Any Street 21
Location: Iraq / Van
54321 Any Town
Date: 1/26/2023
Tel.: +49 123 456-0

Created with Sunny Design 5.40.2


Fax: +49 123 456-100
© SMA Solar Technology AG 2023
E-Mail: info@any-company.de

Internet: www.any-company.de
Any Company

Any Street 21

54321 Any Town

Tel.: +49 123 456-0

Fax: +49 123 456-100

E-Mail: info@any-company.de

Any Company • Any Street 21 • 54321 Any Town


Internet: www.any-company.de

Project: New project Location: Iraq / Van


Project number: --- Grid voltage: 380V (220V / 380V)

System overview

8 x Seraphim Solar System Co.Ltd. SRP-660-BMC-HV (07/2022) (PV array 1)


Azimuth angle: 36 °, Tilt angle: 32 °, Mounting type: Ground mount, Peak power: 5.28 kWp

1 x SMA STP 12-50

SMA Fuel Save Controller - contact SMA for further details: FuelSaveSolution@SMA.de

PV design data
Total number of PV modules: 8 Energy usability factor: 100 %
Peak power: 5.28 kWp Spec. energy yield*: 1658 kWh/kWp
Number of PV inverters: 1 Line losses (in % of PV energy): ---
Nominal AC power of the PV inverters: 12.00 kW Used PV energy: 0.00 kWh
AC active power: 12.00 kW Used PV share: 0%
Active power ratio: 227.3 % PV share of the energy supply (total): 0%
Max. available PV energy*: 8,753 kWh PV share of the energy supply (during the 0%
day):

*Important: The yield values displayed are estimates. They are determined mathematically. SMA Solar Technology AG accepts no responsibility for the real
yield value which can deviate from the yield values displayed here. Reasons for deviations are various external conditions, such as soiling of the PV modules
or fluctuations in the efficiency of the PV modules.

Powered by SMA Sunny Design 2/9 Version: 5.40.2 / 1/26/2023


Inverter designs

Project: New project Ambient temperature:


Project number: --- Annual extreme low temperature:  -16 °C
Location: Iraq / Van Average high Temperature:  26 °C
Annual extreme high temperature:  32 °C

Subproject Subproject 1
1 x SMA STP 12-50 (PV system section 1)
Peak power: 5.28 kWp
Total number of PV modules: 8
Number of PV inverters: 1
Max. DC power (cos φ = 1): 12.25 kW
Max. AC active power (cos φ = 1): 12.00 kW
Grid voltage: 380V (220V / 380V)
Nominal power ratio: 232 %
Dimensioning factor: 44 %
Displacement power factor cos φ: 1
Full load hours: 729.4 h

PV design data
Input A: PV array 1
8 x Seraphim Solar System Co.Ltd. SRP-660-BMC-HV (07/2022), Azimuth angle: 36 °, Tilt angle: 32 °, Mounting type: Ground
mount

Input A: Input B: Input C:


Number of strings: 1
PV modules: 8
Peak power (input): 5.28 kWp --- ---
Inverter min. DC voltage (Grid voltage 220 V): 150 V 150 V 150 V
PV typical voltage: 279 V --- ---
Min. PV voltage: 270 V --- ---
Max. DC voltage (Inverter): 1000 V 1000 V 1000 V
Max. PV voltage 389 V --- ---
Inverter max. operating input current per MPPT: 24 A 24 A 24 A
Max. MPP current of PV array: 17.9 A --- ---
Inverter max. input short-circuit current per MPPT: 37.5 A 37.5 A 37.5 A
PV max. circuit current 19.1 A --- ---

PV/Inverter partly compatible


PV array and inverter type are only conditionally compatible, since the inverter is oversized in this combination (> 135 %).

You get this inverter including SMA ShadeFix. SMA ShadeFix is a patented inverter software that automatically optimizes the
yield of PV systems in any situation. Even under shading conditions.

Powered by SMA Sunny Design 3/9 Version: 5.40.2 / 1/26/2023


Cable sizing

Project: New project Location: Iraq / Van


Project number: ---

Overview

DC
LV
Total
Power loss at nominal operation 48.46 W 7.92 W 56.38 W
Rel. power loss at rated nominal operation 0.75 % 0.13 % 0.87 %
Total cable length 20.00 m 10.00 m 30.00 m
Cable cross-sections 3,5 mm² 6 mm² 3,5 mm²

6 mm²

Graphic

DC cables
Cable material Single length Cross section Voltage drop Rel. power loss
Subproject 1
A Copper 10.00 m 3,5 mm² 2.2 V 0.75 %
1 x SMA STP 12-50
B Copper 10.00 m 2,5 mm² --- ---
PV system section 1
C Copper 10.00 m 2,5 mm² --- ---

Cables LV1
Cable material Single length Cross section Cable resistance Rel. power loss
Subproject 1
1 x SMA STP 12-50 Copper 10.00 m 6 mm² R: 9.556 mΩ
0.13 %
PV system section 1 XL: 0.750 mΩ

Powered by SMA Sunny Design 4/9 Version: 5.40.2 / 1/26/2023


Information

Project: New project Location: Iraq / Van


Project number: ---

New project
The same load profile is used for all seasons. There is no distinction by season.

Subproject 1
1 x SMA STP 12-50 (PV system section 1)
PV array and inverter type are only conditionally compatible, since the inverter is oversized in this combination (> 135 %).
You get this inverter including SMA ShadeFix. SMA ShadeFix is a patented inverter software that automatically optimizes the
yield of PV systems in any situation. Even under shading conditions.

Powered by SMA Sunny Design 5/9 Version: 5.40.2 / 1/26/2023


Load profile overview

Project: New project Location: Iraq / Van


Project number: ---

Overview
Year Summer Spring/fall Winter
Minimum power requirement 912 W 912 W 912 W 1,092 W
Maximum power requirement 6,105 W 5,285 W 6,105 W 6,105 W
Average daily energy requirement 55 kWh 50 kWh 55 kWh 60 kWh
Energy requirement 20,000 kWh 4,587 kWh 9,891 kWh 5,521 kWh

Average weekly profile by seasons

The displayed results are approximate values to give a general indication to users of possible operating results. The results are determined mathematically
based on standardized assumptions. The actual operating results will be dictated significantly by the actual irradiation conditions, the actual efficiency, the
genset operating conditions and the individual consumption behavior and can deviate from the calculated results. SMA SOLAR TECHNOLOGY AG
THEREFORE ASSUMES NO LIABILITY FOR YIELD SHORTFALLS IN THE EVENT OF DEVIATIONS BETWEEN THE CALCULATED- AND ACTUAL OPERATING
RESULTS.

Powered by SMA Sunny Design 6/9 Version: 5.40.2 / 1/26/2023


Gensets overview

Project: New project Location: Iraq / Van


Project number: ---

Overall view
Gensets Load profile
Max apparent power 26250 VA
6267 VA

Max. active power 21000 W


6267 W

Quantity of the gensets 1


Average genset efficiency 8,483.85 kWh/l

Design conditions
The minimum power of the gensets, adjusted for the load, takes into account an additional power reserve that can be provided
by the gensets. A load-related minimum power of 110% means a power reserve of 10%. The minimum PV power to be expected
shows what portion of the original PV power can be expected if clouds suddenly appear.
Minimum genset load 30 %
Load-related minimum power 110 % (of the maximum power requirement)
Minimum PV power to be expected 20 % (of the possible PV power with no clouds)

Maximum permissible PV inverter power


The genset reference power takes into consideration the design conditions and the gensets that are necessary at the same time
during the day. The resulting maximum PV inverter power is 60 % of the genset reference power.
Genset reference power for PV dimensioning 26.25 kVA
Resulting max. PV inverter power 15.75 kVA

Detailed list of the gensets


Name Apparent Active Fuel consumption at nominal Genset efficiency at nominal
power power power power
Genset 26 kVA 21 kW 6.0 l/h 3.50 kWh/l
1

The displayed results are approximate values to give a general indication to users of possible operating results. The results are determined mathematically
based on standardized assumptions. The actual operating results will be dictated significantly by the actual irradiation conditions, the actual efficiency, the
genset operating conditions and the individual consumption behavior and can deviate from the calculated results. SMA SOLAR TECHNOLOGY AG
THEREFORE ASSUMES NO LIABILITY FOR YIELD SHORTFALLS IN THE EVENT OF DEVIATIONS BETWEEN THE CALCULATED- AND ACTUAL OPERATING
RESULTS.

Powered by SMA Sunny Design 7/9 Version: 5.40.2 / 1/26/2023


Project: Location:
Project number:

Details

Annual energy consumption 20,000 kWh


Annual energy generation of the 20,000.00
gensets kWh
Fuel consumption per year (approx.) 2l
PV share of the energy supply (total) 0%
Annual fuel savings potential 0l
(approx.)
PV share of the energy supply (total) 0%
PV share of the energy supply 0%
(during the day)

Powered by SMA Sunny Design 8/9 Version: 5.40.2 / 1/26/2023


Profitability of the PV hybrid system

Project: New project Location: Iraq / Van


Project number: ---

Costs of the PV system


Specific investment costs of the turnkey PV 1300 EUR/kWp
system (CapEx / kWp)
Inverter share of costs 10 %
OpEx PV/year as % of CapEx 3%
Analysis period of profitability in years 20

Financing of the PV system


Equity capital 100 %
Annual interest rate 4.0 %
Credit period in years 10

Gensets operating costs


Effective fuel costs 0.80 EUR/l
Average energy efficiency 8,483.85 kWh/l
Energy generation costs (pure fuel costs) 0.00 EUR/kWh
Annual increase in fuel costs 5%

Discounting of future cash flows


Imputed rate of interest 8.0 %

Investment costs of the turnkey PV system (CapEx) 6,864 EUR


Expected amortization period ---
Net present value using discounted cash flow (approx.) -8,886 EUR
Net present value using nominal cash flow (approx.) -10,982 EUR

The displayed results are approximate values to give a general indication to users of possible operating results. The results are determined mathematically
based on standardized assumptions. The actual operating results will be dictated significantly by the actual irradiation conditions, the actual efficiency, the
genset operating conditions and the individual consumption behavior and can deviate from the calculated results. SMA SOLAR TECHNOLOGY AG
THEREFORE ASSUMES NO LIABILITY FOR YIELD SHORTFALLS IN THE EVENT OF DEVIATIONS BETWEEN THE CALCULATED- AND ACTUAL OPERATING
RESULTS.

Powered by SMA Sunny Design 9/9 Version: 5.40.2 / 1/26/2023