Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

REVISION: CHAPTER 1

PRACTICE TO WRITE YOUR ANSWER IN THE FOLLLOWING FORMAT:


RECOMMENDATION
EXAMPLE- QUESTION 1 –DEC2018

a) Two types of SMM:


1. Standard Method of measurement for Building Works (SMMM)

Explanation ( at least 2 point with description/ example)


( 3 marks)

2. Malaysian Civil engineering Standard Method of Measurement (


MyCESMM)
Explanation ( at least 2 point with description/ example)
( 3 marks)

b) Four reasons BQ popular in civil engineering contract:

1. Main point
Elaboration
( 2 marks)

2. Main point
Elaboration
( 2 marks)

3. Main point
Elaboration
( 2 marks)

4. Main point
Elaboration
( 2 marks)
EXAMPLE- QUESTION 1 –JUN 2018
If question asked you to compare /differentiate/or contracts- tabulate answer in table
format.

Bill of Quantities Contract Design and Build Contract

You might also like