Professional Documents
Culture Documents
Observations - Kadtal TCS
Observations - Kadtal TCS
SHYNESS
SHYNESS
SHYNESS
SHYNESS
Paved Paved
Shoulder CARRIAGEWAY CARRIAGEWAY Shoulder provided
SEPARATOR
SEPARATOR
SHYNESS
SHYNESS
SHYNESS
SHYNESS
FOOTPATH/
FOOTPATH/
UTILITY UTILITY
CORRIDOR LHS SLIP ROAD RHS SLIP ROAD CORRIDOR
DRAIN
DRAIN
( TCS - 1 )
6 LANE VUP APPROACH WITH PROVISION OF SLIPS ROADS
AND DRAINS EITHER SIDE
CONTRACTOR : - INDEPENDENT
CLIENT : - DESIGN CONSULTANT : JOB No. : NAG-HYD-BS-TG-02 TITLE : TYPICAL CROSS SECTIONS
NATIONAL HIGHWAYS AUTHORITY OF INDIA ENGINEER :
SVS MOOKAMBIKA CONSTRUCTIONS
PRIVATE LIMITED Registered office:
C-1593 GF, Sushant Lok I, Gurugram, DRAWING NO :
PROOF CONSULTANT: SAFETY CONSULTANT: Haryana- 122002
PROMARG CONSULTANTS PVT. LTD.
1-2-597/36, 203-C Block,SVSS
Email : inquiry@ninevee.com 9VE/TS/DD/NIRMAL/TCS/001
1-2-597/38, C Block-203 SVSS
Sankalp,Ramakrishna Matam Road,
Sankalp, Ramakrishna Matam Road,
Hyderabad - 500080.
Hyderabad- 500080
Thrie beam barrier shall be provided in the shoulder
if the embankment height is more than 3m or if any
hazard (gantry/tree of girth 300mm or more any water body etc.,)
are present withing 9m from the edge of the paved shoulder
i.e within clear zone.
Paved Earthern
SHYNESS
SHYNESS
Earthern Paved
CARRIAGEWAY CARRIAGEWAY Shoulder Shoulder
Shoulder Shoulder MEDIAN
( TCS - 2 )
4 LANE TO 6 LANE (MERGING ) WITH PAVED SHOULDER
CONTRACTOR : - INDEPENDENT
CLIENT : - DESIGN CONSULTANT : JOB No. : NAG-HYD-BS-TG-02 TITLE : TYPICAL CROSS SECTIONS
NATIONAL HIGHWAYS AUTHORITY OF INDIA ENGINEER :
SVS MOOKAMBIKA CONSTRUCTIONS
PRIVATE LIMITED Registered office:
C-1593 GF, Sushant Lok I, Gurugram, DRAWING NO :
PROOF CONSULTANT: SAFETY CONSULTANT: Haryana- 122002
PROMARG CONSULTANTS PVT. LTD.
1-2-597/36, 203-C Block,SVSS
Email : inquiry@ninevee.com 9VE/TS/DD/NIRMAL/TCS/002
1-2-597/38, C Block-203 SVSS
Sankalp,Ramakrishna Matam Road,
Sankalp, Ramakrishna Matam Road,
Hyderabad - 500080.
Hyderabad- 500080
Thrie beam barrier to be
provided to stop median
cross overs of errant
vehicles
Drainage Drainage
MEDIAN
facility to be facility to be
SHYNESS
SHYNESS
SHYNESS
SHYNESS
provided Paved Paved provided
Shoulder CARRIAGEWAY CARRIAGEWAY Shoulder
SEPARATOR
SEPARATOR
SHYNESS
SHYNESS
SHYNESS
SHYNESS
FOOTPATH/
FOOTPATH/
UTILITY UTILITY
CORRIDOR LHS SLIP ROAD LHS SLIP ROAD CORRIDOR
DRAIN
DRAIN
( TCS - 3 )
6 LANE VUP APPROACH WITH PROVISION OF SLIPS ROADS
AND DRAINS EITHER SIDE (WITH 1.2m MEDIAN)
CONTRACTOR : - INDEPENDENT
CLIENT : - DESIGN CONSULTANT : JOB No. : NAG-HYD-BS-TG-02 TITLE : TYPICAL CROSS SECTIONS
NATIONAL HIGHWAYS AUTHORITY OF INDIA ENGINEER :
SVS MOOKAMBIKA CONSTRUCTIONS
PRIVATE LIMITED Registered office:
C-1593 GF, Sushant Lok I, Gurugram, DRAWING NO :
PROOF CONSULTANT: SAFETY CONSULTANT: Haryana- 122002
PROMARG CONSULTANTS PVT. LTD.
1-2-597/36, 203-C Block,SVSS
Email : inquiry@ninevee.com 9VE/TS/DD/NIRMAL/TCS/003
1-2-597/38, C Block-203 SVSS
Sankalp,Ramakrishna Matam Road,
Sankalp, Ramakrishna Matam Road,
Hyderabad - 500080.
Hyderabad- 500080