Professional Documents
Culture Documents
6-1 Inspection - Trim System, Rear Structure
6-1 Inspection - Trim System, Rear Structure
B. Special Tools:
None
C. Consumable Materials:
None
None
E. Procedure:
(1) Remove cover (5, Figure 601) in order to accomplish the inspection. To do so, open
quick-release fasteners (6).
(3) Inspect fuselage-attached part of the trim system and removed components for scratches,
nicks, cracks, corrosion, delamination and loose or missing rivets.
1 fuselage-attached part
2 laminate
(4) Attach trim weights (4) using attachment hardware (2, 3). Tightening torque: 17-23 Nm
(151-203 lb.in). Then secure them by means of a circlip (1).