Professional Documents
Culture Documents
QRC-RA-013-Removal of Existing Road Structure
QRC-RA-013-Removal of Existing Road Structure
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 1 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
General Lack of Injury to personnel Ensure only person having working visa allowed to supervisor,
Preparation communication. Minor/Major. 3 5 15 H enter the working area. Safety officer 3 1 3 L
(surveying) and Inadequate Difficult to response Designated access routes to be used and and PM.
Mobilization of procedure used in an emergency. appropriate signages should be display.
personnel. Incompetent Failure to follow Site safety induction training should be conducted
Unskilled workplace safety. to all workers.
personnel Poor execution of No visitor will be allowed to enter without gate
Weather structure pass.
condition Pre task briefing to all workers before and ensure
Personnel with close supervision must be standby.
Partial disability, Approved Permit to work must be available at site
young workers before work comes.
Less experience Ensure site engineers and foremen are aware of
personnel weather condition and daily activities.
Skill personnel should be employed.
The worker should understand the local language.
Ensure young workers should be monitor by a
competent foreman
Mobilization of Wrong Injury to personnel Ensure all equipment and machinery selected Site
equipment and equipment and Hearing loss, 4 4 16 H should be in standard of construction. engineer, 4 1 4 L
machinery machinery used. abrasion, head injury, Materials should storage in a designated area and supervisor
Exposure to overturning of fully barricaded. and safety
noise. vehicles Ensure unloading of materials should be under officer.
Harm and fingers Hydraulic oil leaks supervision of a foreman.
cut injury. Ensure regular maintenance of vehicles.
Falling object Manal handling training to all personnel to carryout
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 2 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
Demolition/ Vehicle accident Property damage. Only QRC, approved vehicle, equipment and Supervisor,
remover of existing due to uneven Fatality injury workers 4 5 20 H machineries shall be used. PM, safety 4 1 4 L
road structure surface. and road passerby. Safety operating speed limit shall be strictly officer and
(asphalt pavement Materials falls Death/Facture. monitor. workers.
layer, kerb stones, from height. Eye injuries. All vehicles should be park in designated area.
interlocking, traffic Crushing. Competent flagman should warn others and guide
signs) and Disposal Exposure to the vehicle during reverse movement
of surplus materials public falling Ensure tools box talk conducted for safe handling
using mobile debris. and removal of existing roads structures.
equipment/six Tripping hazard. Keep pedestrians clear away from working area.
wheel trucks. Dust inhalation. All existing road structures shall be kept in a
Collapse of designated area for proper disposal as DM
structure. requirement.
Operator trained and ensured all machinery/ lifting
device are satisfied by third party and certificate
available at site.
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 3 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
Dust generating the Lung diseases Death Ensure full body PPE must be worn at all levels
workplace and dermatitis Respiratory system (respiratory mask, hand gloves, goggles, safety
block 5 4 20 H shoes, coveralls etc.) Engineer, 5 1 5 L
Toolbox talk to raise awareness to all workers. supervisor,
Continuous supervision is required to ensure PM AND HSE
workers are following safe system of work. Officer.
Eye wash station to be provided and first aid kid
with first aider.
Ensure housekeeping toolbox talk conducted to all
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 4 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
Manual handling Fatigue. Death, injuries Ensure manual handling training and instruction Workmen
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 5 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 6 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
confusion
Use of Crane Loading and Major injury to 4 5 20 H Before lifting of the load surrounded area of trailer Lifting 4 1 4 L
mounted truck for Offloading area workers and passing and mobile crane should be barricaded by warning supervisor,
removal and not secured by by motorist/ visitors/ tape/rope with wound warning tape at least 1.5 site
Loading of existing warning tape. staff or nearby meters wide access. engineer,
roads structures. workers. Make sure that sign board clearly visible along the foreman &
Warning
devices not Fatalities, Damage of area to aware the motorist/visitors/staff and HSE Officer.
working, property and legal nearby workers regarding the hazards.
insufficient prosecution Assign banks man to control road traffic.
knowledge Supervisor/Foreman shall plan properly the
to positioning of crane and trailer.
operator / Crane operator is responsible for ensuring the
rigger and operation of his unit such out rigger must be fully
poor extended, out rigger lock to be secured.
maintenanc Ensure that all warning devices are functioning
e of the properly, manual of crane is available, and
equipment. maintenance record of the crane including valid 3 rd
Having no party certificate prior to commence demolition
control of operation.
Precast Crane mounted truck operator shall mandatory
during performed check list every shifting of his unit after
lifting. setting to ensure the safe system of work.
Weight not Demolition Supervisor to ensured safe procedure
distributed shall be followed and instruct the
evenly employee/workers accordingly.
makes it Tag line must be attached always during removal of
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 7 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 8 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
Emergency
situation Fire and Explosion. Bodily Emergency access route shall be kept always free Workmen,
injuries/Fatality/Sever from obstruction. HSE, PM,
Fumes/smoke, e burns, property 3 5 15 H Emergency contact numbers to be affixed at Engineer and 3 1 3 L
Earthquake/nearby damage prominent locations. pedestrians
building collapse, HSE Training on emergency situation. or pass by.
riots/accident etc. Emergency Cluster point shall be identified and
signposted accordingly.
Emergency procedure must be shared on Toolbox
Talk Scenario based drill.
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 9 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL
Severity
5 – 10 Medium
3 71 to 80 3 Reportable (3 - 21 days medical rest) 3 3 6 9 12 15
4 25 to 70 4 Major (Hospital admission/≥21 days medical rest 4 4 8 12 16 20
12 - 25 High
5 0 to 24 5 Fatality 5 5 10 15 20 25
Legal Reference: Chapter 5, Federal Labour Law (8), UAE 1980/ Ministerial Order No. 32, UAE 1982/ Code of Construction Safety Practice, Dubai 2008
Prepared by Approved by
Workmen Representative
Risk Assessment Committee/ HSEO Management Representative/ Project Manager
Name & Designation Betta Melvis Name & Designation Name & Designation
TITLE OF THE ACTIVITY: DEMOLITION AND REMOVAL OF EXISTING ROAD STRUCTURES
o
Assessment Number: QRC-RA-0013 Asses. Date: 14-07-2022 Revision Date: 00 Page Number: 10 10
f
RISK RISK FIN
RATING INITIA CONTROL MEASURES RATING AL
L (EL – Elimination, RE – Reduction, IS – Isolation, EC – Engineering CONTROLLE RIS
TASK STEP HAZARDS RISKS0 R RISK Control, AC – Administration Control, PPE – Personal Protective R R K
S L LEVEL S L LEV
R Equipment) R
EL