1. REFERENCES .................................................................................. 3
2. DEFINITION ...................................................................................... 4
3. APPLICABLE STANDARDS ............................................................ 5
4. DESCRIPTION .................................................................................. 6
4.1 SITE DATA.................................................................................... 6
5. GENERAL ......................................................................................... 6
5.1 GENERAL ..................................................................................... 6
5.2 PRODUCTS .................................................................................. 6
5.3 PACKAGING AND DISPATCH..................................................... 7
DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 3 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS
1. REFERENCES
The reference documents shall be used in the further stages of the project for the Dust Supression
& Acidity Control system detailed specifications, complying with 'COMPANY's standards and codes.
2. DEFINITION
The following are the additional definition of the terms to be used for this document.
3. APPLICABLE STANDARDS
The following standards and codes are applicable according to their latest edition, including
attachments, issued up to date of this specification emission except when clearly indicated as not
applicable.
The fulfillment of these standards and codes does not exempt the responsibility of manufacturer from
the project.
4. DESCRIPTION
4.1.1 Ambient Conditions, refer to 12-86-PE-DEC-00001 NFXP4 - PROJECT DESIGN DATA FOR
SULFUR FACILITIES
5. GENERAL
5.1 GENERAL
5.1.1.1 Furnish all materials, labor, equipment and services necessary to complete the air
pollution control systems as indicated on the Contract Drawings and in the Specifications.
5.1.1.2 The selected dust suppression system shall be controlled by CONTRACTOR’s Distributed
Control System (DCS).
5.1.1.3 VENDOR shall be responsible for verification of volumes, pressures, and mixing rates.
5.1.2 Submittals
5.1.2.1 General arrangement drawings showing the locations, sizes and capacities of the system
components shall be provided.
5.2 PRODUCTS
5.2.1.1 Fugitive dust suppression shall be provided by means of water distributed surfactant spray
nozzles at material transfer points where shown on the drawings. Allowance shall be
DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 7 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS
made to hose the surfactant chemicals and pipe the surfactant into the water spray
system.
5.2.1.2 Spray bar inside chute area in transfer tower shall be removable so that the nozzles
cleaning and replacement can be done outside of the duct.
5.2.1.3 Nozzle arrangement shall be such that dust suppressant sprayed reaches to maximum
sulfur granules.
5.2.1.4 To minimize chemical consumption and avoid wastage, spray pattern and orientation shall
be designed to direct chemical to Sulfur granules on the belts (not on the empty belt).
5.2.1.5 At all transfer points, select spray nozzles to add 150 liters per minute (40 GPM) minimum
at each transfer point when there is product on the belt.
5.2.1.6 Provide automated flow control valves based on the monitoring of Sulfur material flow rate
to adjust the moisture and to provide good aspersion when operating in high capacity.
5.2.1.7 On mobile equipment, the spray system shall be complete with 0.7 MPa pump, solenoids
in cabinet, electrical controls in a cabinet, distribution ports, tubing and hoses.
5.2.1.8 Mobile equipment shall be equipped with a water hose reel sized to permit the machine to
travel from the water connection at grade to the farthest travel limit.
5.2.1.9 Drainage valves shall be provided at low points of the system.
5.2.1.10 Piping and fittings shall comply with PROJECT’s specification.
5.2.1.11 Coating systems shall be in accordance with the applicable project painting specifications.
5.2.1.12 The dust suppression system shall be activated with presence of sulfur on the belting
controlled by an ultrasonic flow sensor or belt scale.
5.2.1.13 Banks of nozzles or individual nozzles shall be installed to allow for ease of maintenance
and sealed for efficient and effective dust prevention.
5.3.1 After final inspection components shall be packed for transport to the project site as follows: