DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA

COMPANY: Contract No.:


QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 1 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

CONTRACT TITLE:

EPCC of the Sulfur Facilities for the North Field Expansion (NFXP) Project - EPC4

TITLE:

COMMON NFXP4 - SPECIFICATION FOR DUST


SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS
Replication Source: NFEF-12-00-ME-TS-NA-825 Rev. D1

2 30-Mar-23 Approved for Construction JNB HDR JPA

1 01-Feb-23 Approved for Construction JNB HDR JPA

0 28-Nov-22 Issued for Construction RMA HDR JPA

B 15-Jul-22 Issued for Approval RMA HDR MAR

A 09-Jun-22 Issued for Inter-Discipline Check CMS HDR MAR


Prep’d by Chk’d by App’d by Chk’d by App’d by
Rev. Issue Date Revision Description
CONT. CONT. CONT. COMPANY. COMPANY.

COMPANY

QATARGAS OPERATING COMPANY LIMITED

CONTRACTOR

TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV

DOCUMENT NO. 12-00-ME-SPC-00019 DOC. CLASS Class 1


DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 2 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

Table of Contents

1. REFERENCES .................................................................................. 3
2. DEFINITION ...................................................................................... 4
3. APPLICABLE STANDARDS ............................................................ 5
4. DESCRIPTION .................................................................................. 6
4.1 SITE DATA.................................................................................... 6
5. GENERAL ......................................................................................... 6
5.1 GENERAL ..................................................................................... 6
5.2 PRODUCTS .................................................................................. 6
5.3 PACKAGING AND DISPATCH..................................................... 7
DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 3 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

1. REFERENCES

The reference documents shall be used in the further stages of the project for the Dust Supression
& Acidity Control system detailed specifications, complying with 'COMPANY's standards and codes.

Item Document No. Document Title

1. NFXP4 - PROCESS BASIS OF DESIGN - SULFUR


12-86-PR-DEC-00002
PROJECT

2. COMMON NFXP4 - SPECIFICATION FOR


12-00-CE-SPC-00001
PAINTING - GENERAL REQUIREMENTS
COMMON NFXP4 - SPECIFICATION FOR
3. 12-00-CE-SPC-00002 PAINTING - MANUFACTURING FACILITIES FOR
NFE SULFUR
COMMON NFXP4 - SPECIFICATION FOR DUST
4. 12-00-ME-SPC-00019 SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS
COMMON NFXP4 - SPECIFICATION FOR
5. 12-00-ME-SPC-00020 BELTING FOR SULFUR CONVEYORS AND SHIP
LOADERS
NFXP4 – TECHNICAL SPECIFICATION FOR
6. 12-51-IN-SPC-00029 OUTDOOR CONTROL PANEL AND LOCAL
PANEL MOUNTED INSTRUMENTATION

7. NFXP4 COMMON - ELECTRICAL


12-91-EL-DEC-00002
REQUIREMENTS FOR PACKAGE EQUIPMENT

8. NFXP4-TWJV-SH-PLN-00002 NFXP4 - PROJECT TECHNICAL HSE PLAN

9. NFXP4 COMMON - ELECTRICAL DESIGN


12-91-EL-DEC-00003
CRITERIA
NFXP4 COMMON - SPECIFICATION FOR
10. 12-91-EL-SPC-00012 ELECTRICAL - L.V. (LOW VOLTAGE) INDUCTION
MOTORS
DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 4 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

2. DEFINITION

The following are the additional definition of the terms to be used for this document.

COMPANY: QATARGAS OPERATING COMPANY LIMITED

PROJECT: Engineering, Procurement, Construction and Commissioning of


the Sulfur Facilities for the North Field Expansion (NFXP) Project
– EPC4).

CONTRACTOR: TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV.

VENDOR: Any person, firm, partnership, company, corporation or


combination thereof with whom CONTRACTOR has sent the
REQUEST FOR QUOTATION or placed the PURCHASE
ORDER to provide materials or equipment.

NFE North Field Expansion

CSP Common Sulfur Project

Sub-Vendor Company hired by the Vendor to supply equipment, materials, or


services within Vendor package scope.
DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 5 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

3. APPLICABLE STANDARDS

The following standards and codes are applicable according to their latest edition, including
attachments, issued up to date of this specification emission except when clearly indicated as not
applicable.

• Fédération Européenne de la Manutention – FEM

• Deustsche Industrie Normen – DIN

• British Standard Specifications – BSS

• Japanese Industrial Standard – JIS

• International Organization for Standardization – ISO

• American Society for Testing Materials – ASTM

• American Welding Society – AWS

• American Institute of Steel Constructions – AISC

• American Society of Mechanical Engineers – ASME

• Society of Automotive Engineers – SAE

• American Iron and Steel Institute – AISI

• American National Standards Institute – ANSI

• American Gear Manufacturers Association – AGMA

• American Bearing Manufacturers Association – ABMA

• International Electrotechnical Commission – IEC

• Institute of Electrical and Electronics Engineers – IEEE

• National Electric Code – NEC

• National Electrical Manufacturers Association – NEMA

• Rubber Manufacturers Association – RMA

• Insulated Cable Engineers Association – ICEA

• Conveyor Equipment Manufacturers Association – CEMA

• Steel Structure Painting Council – SSPC


DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 6 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

• Association of Iron and Steel – AISE

• Instrument Society of America – ISA

• American Standards Association – ASA

• National Fire Protection Association – NFPA

The fulfillment of these standards and codes does not exempt the responsibility of manufacturer from
the project.

4. DESCRIPTION

4.1 SITE DATA

4.1.1 Ambient Conditions, refer to 12-86-PE-DEC-00001 NFXP4 - PROJECT DESIGN DATA FOR
SULFUR FACILITIES

Location: Ras Laffan, Qatar

Temperature: 49°C (average max)

Elevation: 3.12 M.A.S.L (+4.00 mCD)

5. GENERAL

5.1 GENERAL

5.1.1 Work Included:

5.1.1.1 Furnish all materials, labor, equipment and services necessary to complete the air
pollution control systems as indicated on the Contract Drawings and in the Specifications.
5.1.1.2 The selected dust suppression system shall be controlled by CONTRACTOR’s Distributed
Control System (DCS).
5.1.1.3 VENDOR shall be responsible for verification of volumes, pressures, and mixing rates.

5.1.2 Submittals

5.1.2.1 General arrangement drawings showing the locations, sizes and capacities of the system
components shall be provided.

5.2 PRODUCTS

5.2.1 Dust Suppression

5.2.1.1 Fugitive dust suppression shall be provided by means of water distributed surfactant spray
nozzles at material transfer points where shown on the drawings. Allowance shall be
DocuSign Envelope ID: C36173D4-F9B2-4BAB-A2D9-6FF9E083EAAA
COMPANY: Contract No.:
QATARGAS OPERATING COMPANY LIMITED LTC/C/NFE/5022/20
PROJECT:
Doc. No.:
SULFUR FACILITIES FOR THE NORTH FIELD EXPANSION (NFXP)
12-00-ME-SPC-00019
PROJECT - EPC-4
CONTRACTOR: Rev. 2
TÉCNICAS REUNIDAS S.A. & WISON ENGINEERING LTD. JV PAGE 7 OF 7
Doc. Title: COMMON NFXP4 - SPECIFICATION FOR DUST SUPPRESSION FOR SULFUR SHIP LOADERS,
STACKER/RECLAIMERS AND CONVEYORS

made to hose the surfactant chemicals and pipe the surfactant into the water spray
system.
5.2.1.2 Spray bar inside chute area in transfer tower shall be removable so that the nozzles
cleaning and replacement can be done outside of the duct.
5.2.1.3 Nozzle arrangement shall be such that dust suppressant sprayed reaches to maximum
sulfur granules.
5.2.1.4 To minimize chemical consumption and avoid wastage, spray pattern and orientation shall
be designed to direct chemical to Sulfur granules on the belts (not on the empty belt).
5.2.1.5 At all transfer points, select spray nozzles to add 150 liters per minute (40 GPM) minimum
at each transfer point when there is product on the belt.
5.2.1.6 Provide automated flow control valves based on the monitoring of Sulfur material flow rate
to adjust the moisture and to provide good aspersion when operating in high capacity.
5.2.1.7 On mobile equipment, the spray system shall be complete with 0.7 MPa pump, solenoids
in cabinet, electrical controls in a cabinet, distribution ports, tubing and hoses.
5.2.1.8 Mobile equipment shall be equipped with a water hose reel sized to permit the machine to
travel from the water connection at grade to the farthest travel limit.
5.2.1.9 Drainage valves shall be provided at low points of the system.
5.2.1.10 Piping and fittings shall comply with PROJECT’s specification.
5.2.1.11 Coating systems shall be in accordance with the applicable project painting specifications.
5.2.1.12 The dust suppression system shall be activated with presence of sulfur on the belting
controlled by an ultrasonic flow sensor or belt scale.
5.2.1.13 Banks of nozzles or individual nozzles shall be installed to allow for ease of maintenance
and sealed for efficient and effective dust prevention.

5.3 PACKAGING AND DISPATCH

5.3.1 After final inspection components shall be packed for transport to the project site as follows:

5.3.1.1 Components shall be protected with timber battens or the equivalent.


5.3.1.2 Assemblies shall be protected against possible mechanical damage and corrosion, and
shall be mounted on a wooden cradle.
5.3.1.3 Crates shall be clearly marked with the information detailed on the component nameplate.
5.3.1.4 Dust suppression units shall be factory tested prior to shipping.
5.3.1.5 Bar coding shall be used to facilitate inventory and tracking.