Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

TUTORIAL MODULE (1)

OLEOCHEMICAL PRODUCTION

1. INDUSTRIAL EFFLUENT CHARACTERISTICS STUDY (IECS)

The table below presents the average 3-days IECS data for oleochemical production:
2. FLOWRATE OF INCOMING EFFLUENT (WASTE COLLECTION POINT)

The table below presents the flowrate of incoming effluent for 3-days

Sampling Time Day 1 (m3/hr) Day 2 Day 3


12.00 am - 1.5 1.6
1.00 am - 1.4 1.6
2.00 am - 1.6 1.5
3.00 am - 1.4 1.6
4.00 am - 1.5 1.4
5.00 am - 1.3 1.3
6.00 am - 1.4 1.3
7.00 am - 1.8 1.9
8.00 am - 2.3 2.0
9.00 am 2.5 2.6 2.4
10.00 am 2.7 2.8 2.3
11.00 am 3.2 3.0 2.9
12.00 pm 3.3 3.4 3.0
1.00 pm 3.2 3.5 3.2
2.00 pm 3.4 3.4 3.3
3.00 pm 2.8 3.1 3.0
4.00 pm 2.7 2.8 2.7
5.00 pm 2.4 2.9 2.3
6.00 pm 2.5 2.7 -
7.00 pm 2.0 2.4 -
8.00 pm 1.8 2.0 -
9.00 pm 1.9 1.8 -
10.00 pm 1.7 1.8 -
11.00 pm 1.8 1.7 -

You might also like