Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PHASE 1: DECIDE Option #3 - Definitions and Examples of ICT Experience

Eligibility Requirements ICT experience encompasses the design, management, integration


and installation of pathways, spaces, optical fiber and copper-based
Applicants must meet one of the following
distribution systems, wireless-based systems and infrastructure
eligibility options in order to apply for the that supports the transportation of information and associated
RCDD certification exam. signaling between and among communications and information
gathering devices.
Option #1: Two years of verifiable full-time
work experience in ICT design AND a current ICT related work experience includes three or more the following
examples:
BICSI certification holder as BICSI TECH™,
RTPM®, DCDC® or OSP. • ICT job foreman

Option #2: Two years of verifiable full-time • Lead technician


equivalent work experience in ICT design AND • ICT Project manager
completion of two years of higher education
• ICT installation trainer
course work in ICT. Two years of higher
education course work in ICT may include: • Technician hands-on experience

• STEM or trade school • ICT installation field experience


• Two-year degree • Laying out telecommunication spaces
• ICT and industry-related programs, • Laying out pathways
apprenticeships or certifications
• Working with ICT designs
• Military training equivalent
• Calculating distances and/or loss
Evidence of completion of higher education course
work includes: o Cable distances

• Certificates o Cable pathway capacity


• Diplomas o Penetration capacity
• Registrar’s documentation o Backboard/rack space
• Other bona fide documents
o Optical fiber loss
Option #3: Five years of verifiable ICT experience. • Reviewing and understanding ICT test results
• Applying ICT standards and codes
• ICT quality assurance and control
• Reviewing and understanding ICT related drawings
• Intelligent building installation
o AV
o Security
o Lighting
o BMS/BAS
o Access control
o Fire alarm
• Specifying bill of materials (BOM)
• Writing and responding to ICT specifications equivalent.

Page 8

You might also like