January 6, 2023

To: Mr. Jonathan R. Raymundo


Assistant Vice President/Area Manager
BWSI – Sto. Domingo Branch

From: Ms. Rowena T. Grivialde


Branch Manager
BWSI – Sto. Domingo Branch

Mr. Kian Carlo G. Inductivo


Branch Engineer
BWSI – Sto. Domingo Branch

Subject: Request for Cash Advance for Professional Fee of Civil and Mechanical Engineer
for the Certificate of Public Convenience (CPC) Renewal of Pumps in
BWSI – Sto. Domingo Waterworks

Dear Sir JRR:

Greetings!

This is to request the budget for the Professional Fee of the Civil and Mechanical Engineer for
the renewal of Certificate of Public Convenience (CPC) for all eight (8) pumps of
BWSI – Sto. Domingo Waterworks. This is to ensure that the Drawing Plans and Engineering
Report are signed and sealed by duly respected professional for us to expedite the application
of the operational permit. The breakdown of the requested budget for the payment to
professional engineers are follows:

NO. OF PROFESSIONAL
PROFESSION NAME FEES
PUMPS FEE PER PUMP
MECHANICAL Engr. Roderico Q.
8 Php2,500.00 Php20,000.00
ENGINEER Catacutan
CIVIL
Engr. Joan T. Mallari 8 Php1,000.00 Php8,000.00
ENGINEER
TOTAL Php28,000.00

In view thereof, the BWSI – Sto. Domingo Branch is requesting for a total of
Twenty Eight Thousand Pesos Only (Php28,000.00) which will be subjected to Liquidation.
For your review and approval.

Thank you very much.