The document contains the minutes of a meeting held on 12/10/2022 between L&T Construction and EDRC Geotech to discuss the MAHSR C-4 project. 11 action items were recorded including sharing RS2 files, reanalyzing weathered rock, compressing a chapter, updating RQD and RMR values, adding notes on low Q values, optimizing support systems based on geologist and instrumentation inputs, checking convergence, and updating an ESR value. The minutes were to be sent to all participants listed.
The document contains the minutes of a meeting held on 12/10/2022 between L&T Construction and EDRC Geotech to discuss the MAHSR C-4 project. 11 action items were recorded including sharing RS2 files, reanalyzing weathered rock, compressing a chapter, updating RQD and RMR values, adding notes on low Q values, optimizing support systems based on geologist and instrumentation inputs, checking convergence, and updating an ESR value. The minutes were to be sent to all participants listed.
The document contains the minutes of a meeting held on 12/10/2022 between L&T Construction and EDRC Geotech to discuss the MAHSR C-4 project. 11 action items were recorded including sharing RS2 files, reanalyzing weathered rock, compressing a chapter, updating RQD and RMR values, adding notes on low Q values, optimizing support systems based on geologist and instrumentation inputs, checking convergence, and updating an ESR value. The minutes were to be sent to all participants listed.
The document contains the minutes of a meeting held on 12/10/2022 between L&T Construction and EDRC Geotech to discuss the MAHSR C-4 project. 11 action items were recorded including sharing RS2 files, reanalyzing weathered rock, compressing a chapter, updating RQD and RMR values, adding notes on low Q values, optimizing support systems based on geologist and instrumentation inputs, checking convergence, and updating an ESR value. The minutes were to be sent to all participants listed.
P.O.BOX 979, MANAPAKKAM, CHENNAI 600 089 INDIA – PHONE: 044-2252 8080/6060/6666 Extn: FAX: E-MAIL: Meeting No. MINUTES OF MEETING Sheet 1 Of 1 PROJECT / PURPOSE: MAHSR C-4 LOCATION: TC III 2nd Floor DATE OF MEETING: 12/10/2022 PARTICIPANTS S. No. NAME ORGANISATION REPORTS SENT TO 1 Mahalakshmi M (MM) EDRC Geotech, L&T ALL 2 Gundeti Sumanth Kumar (GS) S. No. MOM ACTION BY DATE 1 RS2 files shall be shared MM Another analysis shall be done for completely weathered rock to get low 2 MM displacements. 3 Chapter 8 shall be compressed. MM 4 RQD value shall be taken as 10 in VBH 157-01. MM 12/10/2022 5 RMR calculations shall be given. MM 6 JSCE classification is not required in portal zones. MM 7 A note shall be added if Q≤0.01 i.e., site team need to discuss with designers MM 8 Q values shall be included in table 12-1 & table12-2. MM Support system shall be optimized as per inputs given by geologist and 9 MM instrumentation recordings. 10 Convergence shall be checked. MM 11 ESR value shall be taken as 1.0 MM
SIGNATURE OF REPRESENTATIVES OF PARTICIPATING DIVISIONS/SECTIONS CONVENOR