A series of consultations will focus on the Transportation Development, which will set the development
6. Description: of policies, prioritization, and design of programs and projects on transportation infrastructure, with a
master plan based on a detailed assessment of the existing national transportation network.
(A)
Physical Accomplishments
FY 2024 2025 2026
(A) (B) (C) (D)
Bangsamoro Strategic Transportation Development Plan 1
11.3. TOTAL PROJECT COST
Expense Class Total Project Cost
Personnel Services (PS)
Maintenance and Other Operating Expenses (MOOE) 3,000,000.00
Financial Expenses (FINEX)
Capital Outlay (CO)
GRAND TOTAL 3,000,000.00
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
The primary objective of the Tawi- Tawi Integrated Transport Plan is the pursuit of inclusive economic
growth. As we all know, Tawi Tawi's economy relies heavily on transportation to connect people and
economic hubs across the islands. Tawi Tawi's transportation system includes road, marine, and air
transportation. Because of the country's archipelagic nature, road transport is essential, but water
6. Description: transport is by far the most important subsector. While the Tawi-tawi's transportation infrastructure has
been constructed and dispersed, the quality of service has been inadequate due to a lack of long-term
funding. Improving transportation infrastructure is crucial for boosting Tawi Tawi's economic growth. In
order to do that, Ministry of Transportations and Communications will conduct series of consultation to
develop an integrated and coordinated transport network in Tawi-Tawi.
The Tawi-Tawi Integrated Transport Plan sets five objectives for infrastructure development, including
the transport sector:
> ensure transport safety and security
> optimize resources and investments
7. Purpose:
> ensure an integrated and coordinated transport network
> foster transparency and accountability in infrastructure development
> adapt to climate change and mitigate the impacts of natural disasters
> provide productive employment opportunities
Finish Date:
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
The BARMM Government through the power of MOTC is formulating a Bangsamoro Strategic
Communications Plan. This is a high level plan to achieve goals and desirable ends with available
6. Description: means. Thus, this will provide lectures on the different platforms and strategies in communicating in the
media, methods in producing news articles and web contents, video and photo handling, coverages
and documentation, and basic layout and graphic design.
Bangsamoro Strategic Communications Plan can be held accountable for achieving three main
outcomes, all of which are measurable: Raising awareness, changing attitudes and motivating people
7. Purpose:
to take action. As a result, this will provide a communications strategy on how to make a new image for
the region.
(A)
Physical Accomplishments
FY 2024 2025 2026
(A) (B) (C) (D)
GRAND TOTAL
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
The position will be detailed under the Minister's Office and will serve as a driver because the Minister's
6. Description:
office is short on drivers.
7. Purpose: The primary function of a driver is to move cargo or passengers safely from one area to another.
8. Beneficiaries: Entire Bangsamoro Region
9. Implementation Period: ORIGINAL
Start Date: 1st Quarter
Finish Date: 4th Quarter
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
10. Pre-Requisites:
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
### 1. Program/Activity/Project Name South Exchange between BARMM and Timor Leste
Office of the Minister
2. Implementing Ministry/Office:
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
1. Program/Activity/Project Name Quarterly Round Table Discussion with MAFAR on Agri-Fishery Value Chains
2. Implementing Ministry/Office: Office of the Minister
6. Description: Round Table Discussion with MAFAR on Agri-Fishery Value Chains with MOTC
7. Purpose: To strengthen the connection between MOTC and MAFAR
8. Beneficiaries: Entire Bangsamoro Region
9. Implementation Period: ORIGINAL
Start Date:
Finish Date:
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
4. Categorization
New ☐ Infrastructure
Expanded ☐ Non-Infrastructure
Yes No
MPW Certification ☐ ☐
MPW Costing ☐ ☐
MENRE Clearance ☐ ☐
ICO Certification ☐ ☐
List of Locations ☐ ☐
List of Beneficiaries ☐ ☐
Feasibility Studies ☐ ☐
Engineering Designs ☐ ☐
Annual Procurement Plans ☐ ☐
M/O Operational Plans ☐ ☐
Inter-M/O Clearances and Permits ☐ ☐
Others (please specify)
GRAND TOTAL -
- 155,000.00 -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office
BBP Form 310-b
R 2)
☐
Infrastructure
Non-Infrastructure ☐
e staff
Reviewed/Approved
Not Remarks
Applicable
☐
☐
☐
☐
☐
☐
Reviewed/Approved
Not Remarks
Applicable
☐
☐
☐
☐
☐
2026
(D)
2026
(D)
ost
155,000.00
155,000.00
2026
(C)
N/A
Total
(F)
123,000.00
32,000.00
155,000.00
Total
(F)
155,000.00
155,000.00
Date:
.
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
Measurement of services, processes, and best practices of established Internal Audit Offices in the country considered to be
6. Description:
the best in the industry.
Aims to obtain procedures and best practices of already established Internal Audit Offices, and to identify internal
7. Purpose:
opportunites for the Ministry and implement the same in the Ministry.
8. Beneficiaries: Internal Audit Section
9. Implementation Period: ORIGINAL
Start Date: 1st Qtr
Finish Date: 4th Qtr
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICTO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
GRAND TOTAL
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
6. Description: Building and developing internal audit activities and providing necessary knowledge to internal auditors.
7. Purpose: This aims to equip the Internal Auditors with necessary knowledge to conduct the audit properly.
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Approved By:
Approved By:
Approved By:
DICKSON
DICKSON P.
DICKSON P. HERMOSO
P. HERMOSO
HERMOSO
Head
Head of
of Ministry/Office
Ministry/Office
Head of Ministry/Office
Approved
Approved By:
By:
Approved By:
DICKSON P.
DICKSON P. HERMOSO
HERMOSO
DICKSON P. HERMOSO
Head
Head of
of Ministry/Office
Ministry/Office
Head of Ministry/Office
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
6. Description: Provision of Supplies and Materials, and Load Allowance for Office Operation
To supply the office with the needed stocks to support the operation and to support the load allowance utilized monthly for
7. Purpose:
office and other operational necessities
8. Beneficiaries: Information and Communications Division
9. Implementation Period: ORIGINAL
Start Date: 1st Quarter
Finish Date: 4th Quarter
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA 1/15/2023
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
or
m
3
1
0-
b
4. Categorization New
Expanded
7. Purpose: For office use and for the day-to-day operations of the Admin/HR Secti
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement Plans
M/O Operational Plans
Inter-M/O Clearances
and Permits
Others (please specify)
Physical Accomplishments
FY 2024
(A) (B)
PAP 2025
(A) (B)
N/A N/A
GRAND TOTAL
11.5. COSTING BY COMPONENT(S)
Components PS MOOE
(A) (B) (C)
Prepared By:
4. Categorization New
Expanded
7. Purpose: The provision will enable smooth communication access of the MOTC
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational Plans
Inter-M/O Clearances
and Permits
Others (please specify)
Physical Accomplishments
FY 2024
(A) (B)
No. of personnel 3
Prepared By:
4. Categorization New
Expanded
8. Beneficiaries: MOTC-BARMM
9. Implementation Period: ORIGINAL
Start Date:
Finish Date:
REVISED
0 Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational
Inter-M/O Plans
Clearances
and Permits
Others (please specify)
606,000.00
GRAND TOTAL
Physical Accomplishments
FY 2024
(A) (B)
Prepared By:
4. Categorization New
Expanded
8. Beneficiaries: MOTC-BARMM
9. Implementation Period: ORIGINAL
Start Date:
Finish Date:
REVISED
0 Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational
Inter-M/O Plans
Clearances
and Permits
Others (please specify)
1,039,500.00
GRAND TOTAL
Physical Accomplishments
FY 2024
(A) (B)
Prepared By:
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational
Inter-M/O Plans
Clearances
and Permits
Others (please specify)
Prepared By:
4. Categorization New
Expanded
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational
Inter-M/O Plans
Clearances
and Permits
Others (please specify)
Prepared By:
/HRM SECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
592,293.00
es - Admin/HR Section
rsonnel
1/2/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
592,293.00
592,293.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
592,293.00
- - 592,293.00
CO FINEX Total
(D) (E) (F)
592,293.00
- - 592,293.00
ECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
72,000.00
oth communication access of the MOTC officials concerned and employees in the conduct of their functions.
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
72,000.00
72,000.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
- 72,000.00
- - 72,000.00
CO FINEX Total
(D) (E) (F)
- 72,000.00
- - 72,000.00
SECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
employees
Ocular inspection of facilities
meeting within the budget section and with the PHIC, GSIS and PAG-IBIG
ment
get section operations and allow the personnel to work more efficiently.This helps each employee comprehend both the section's overall
and others' efforts might contribute to the section's overall performance improvement.
ployees. Encourages employee confidence and helps the new employee adapt faster to the job; Contributes to a more effective, productive
e retention; and. Promotes communication between the head of the office and the new employee.
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
606,000.00
606,000.00
2025 2026
(B) (C)
N/A N/A
0 0
CO FINEX Total
(D) (E) (F)
- 93,000.00
513,000.00
- - 606,000.00
CO FINEX Total
(D) (E) (F)
- 606,000.00
- - 606,000.00
P PROGRAM
SECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
am
articularly the poor/indigent and young workers, opportunity to demonstrate their talents and skills in the field of public service with the
g the best and the brightest who want to pursue a career in government service, particularly in the fields and disciplines related to labor and
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
Total Project Cost
606,000.00
606,000.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
- 1,039,500.00
- - 1,039,500.00
CO FINEX Total
(D) (E) (F)
- 1,039,500.00
- - 1,039,500.00
RAMS/ACTIVITIES
SECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
460,000.00
RAM
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
460,000.00
460,000.00
2025 2026
(B) (C)
N/A N/A
0 0
CO FINEX Total
(D) (E) (F)
- 460,000.00
- - 460,000.00
CO FINEX Total
(D) (E) (F)
- 460,000.00
- - 460,000.00
SECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
Total Project Cost
419,000.00
419,000.00
2025 2026
(B) (C)
N/A N/A
0 0
CO FINEX Total
(D) (E) (F)
- 419,000.00
- - 419,000.00
CO FINEX Total
(D) (E) (F)
- 419,000.00
- - 419,000.00
BAC will conduct Inspection and Evaluation on the Proposed Projects and Equipment before Pre-Procurement
1. Program/Activity/Project Name Conference of projects to be procured by the Ministry (Benchmarkings) together with TWG. Also, Procurement
officers and staff conduct Canvass outside Cotabato City
2. Implementing Ministry/Office: Procurement Divisions
6. Description: Conduct benchmarking before project implementation. Also, to canvass suppliers outside Cotabato City.
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
Others (please
specify)
Document Type Reviewed/Approved
10.1 Plans, Justifications, and other attachments:
Engineering Designs ☐ ☐ ☐
Annual Procurement
Plans ☐ ☐ ☐
M/O Operational
Plans ☐ ☐ ☐
Inter-M/O Clearances
and Permits ☐ ☐ ☐
Others (please
specify)
TOTAL: 13 - -
GRAND TOTAL - -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
6. Description: Physical Inventory and Inspection of Property, Plant and Equipment (PPE), supplies, materials and accountable forms.
To safeguard assets,plant, property and equipment (PPE) of the Ministry against loss or wastage in accordance with law and
7. Purpose:
regulations
8. Beneficiaries: Supply Section personnel
9. Implementation Period: ORIGINAL
Start Date: 1/1/2024
Finish Date: 12/31/2024
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Feasibility Studies ☐ ☐ ☐
Engineering Designs ☐ ☐ ☐
Annual Procurement Plans ☐ ☐ ☐
M/O Operational Plans ☐ ☐ ☐
Inter-M/O Clearances and Permits ☐ ☐ ☐
Others (please specify)
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
GRAND TOTAL - -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
Approved By:
Approved By:
Approved By:
DICKSON
DICKSON P.
DICKSON P. HERMOSO
P. HERMOSO
HERMOSO
Head
Head of
of Ministry/Office
Ministry/Office
Head of Ministry/Office
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
GRAND TOTAL - -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY.. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
Approved By:
Approved By:
Approved By:
DICKSON P.
DICKSON P. HERMOSO
HERMOSO
DICKSON P. HERMOSO BBP Form 310-b
Head
Head of Ministry/Office
Head of
of Ministry/Office
Ministry/Office
Approved By:
Approved By:
Approved By:
DICKSON
DICKSON P.P. HERMOSO
P. HERMOSO
HERMOSO
DICKSON
Head
Head of Ministry/Office
Head2)of
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER of Ministry/Office
Ministry/Office
6. Description: The employment and is entered with employees who engage and perform services with the ministry on a day-to-day basis.
7. Purpose: To assist in the daily operation of record section.
8. Beneficiaries:
9. Implementation Period: ORIGINAL
Start Date: 1/1/2024
Finish Date: 12/31/2024
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
6. Description: For the used on the day to day operation of the office
7. Purpose: To assist in the daily operation of record section.
8. Beneficiaries:
9. Implementation Period: ORIGINAL
Start Date: 1/1/2024
Finish Date: 12/31/2024
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
1.1 Provision for Fuel, Oil, Lubricant, Repair and Maintenance of the MOTC BARMM 6 unit Office Vehicle, 2 unit motorcycle,
1 Generator 75 KVA & 1 Generator Set 340 KVA and;
1. Program/Activity/Project Name
3. Procurement of Supplies - General Services
2. Implementing Ministry/Office:
General Services
1.1 Provision for Fuel, Oil, Lubricant, Repair and Maintenance of the MOTC
3,508,074.00
BARMM 6 unit Office Vehicle, 2 unit motorcycle & 1 Generator
GRAND TOTAL - -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
1. Program/Activity/Project Name 1.2 Allocating Fund of GSIS Insurance for Ministry & Sectors Official Vehicle & Speed boat
2. Implementing Ministry/Office:
General Services
6. Description: Fund for insurances of the existing official vehicle and speed boat.
7. Purpose: To secure the insurances of the existing official vehicle and speed boat of theMinistry
8. Beneficiaries:
MOTC Personnel
9. Implementation Period:
ORIGINAL
Start Date: First Quarter 2024
Finish Date: Fourth Quarter 2024
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
GRAND TOTAL - -
GRAND TOTAL
- 859,560.52 - - 859,560.52
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
Approved By:
Approved By:
Approved By:
DICKSON
DICKSON P.
P. HERMOSO
HERMOSO
DICKSON P. HERMOSO
Head
Head of
Head of Ministry/Office
of Ministry/Office
Ministry/Office
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
6. Description: The employment and is entered with employees who engage and perform services with the ministry on a day-to-day basis.
7. Purpose: To assist in the record keeping and the daily operation of accounting section.
8. Beneficiaries: FINANCE DIVISION
9. Implementation Period: ORIGINAL
Start Date: January 2, 2024
Finish Date: December 31, 2024
REVISED
Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities Reviewed/Approved
Yes No Not Remarks
Applicable
MPW Certification ☐ ☐ ☐
MPW Costing ☐ ☐ ☐
MENRE Clearance ☐ ☐ ☐
ICO Certification ☐ ☐ ☐
List of Locations ☐ ☐ ☐
List of Beneficiaries ☐ ☐ ☐
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS
4. Categorization New
Expanded
6. Description: These are processes through which personnels will obtain, strengthen a
This fosters a common vision and operating framework among the perso
7. Purpose:
evaluation of interventions.
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational Plans
Inter-M/O Clearances
and Permits
Others (please specify)
PAP FY 2024
(A) (B)
Physical Accomplishments
FY 2024
(A) (B)
Prepared By:
4. Categorization New
Expanded
6. Description: The employment and is entered with employees who engage and perfor
To assist in the daily operation of budget section. They are the engine of
7. Purpose:
coordination in other ministries and offices. Also, to provide an efficient a
8. Beneficiaries: MOTC-BARMM
9. Implementation Period: ORIGINAL
Start Date:
Finish Date:
REVISED
0 Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational
Inter-M/O Plans
Clearances
and Permits
Others (please specify)
Prepared By:
4. Categorization New
Expanded
6. Description: This refers to the appropriations for the purchase of goods and services,
7. Purpose: For the improvement the budget section operations and allow the person
8. Beneficiaries: MOTC-BARMM
9. Implementation Period: ORIGINAL
Start Date:
Finish Date:
REVISED
0 Start Date:
Finish Date:
10. Pre-Requisites: Approving Authorities
MPW Certification
MPW Costing
MENRE Clearance
ICO Certification
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement
Plans
M/O Operational
Inter-M/O Plans
Clearances
and Permits
Others (please specify)
Physical Accomplishments
FY 2024
(A) (B)
1. No. of ICT Equipment procured 1
Prepared By:
elopment
ECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
60,000.00
which personnels will obtain, strengthen and maintain the capabilities to set and achieve their own development objectives over time.
and operating framework among the personnels and improves the knowledge base and ongoing learning through monitoring and
onnel
1/2/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
60,000.00
60,000.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
60,000.00
- - 60,000.00
CO FINEX Total
(D) (E) (F)
80,000.00
- - 80,000.00
ECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
ed with employees who engage and perform services with the ministry on a day-to-day basis.
n of budget section. They are the engine of the maintenance operation. To keep financial and other important records to ensure efficient
s and offices. Also, to provide an efficient and productive services for the benefit of the office.
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
480,000.00
480,000.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
- 480,000.00
- - 480,000.00
CO FINEX Total
(D) (E) (F)
- 480,000.00
- - 480,000.00
nt)
ECTION
☐ Infrastructure ☐
☐ Non-Infrastructure ☐
ns for the purchase of goods and services, the benefits of which extend beyond the fiscal year and which add to the assets of Government
get section operations and allow the personnel to work more efficiently.
1/1/2024
12/31/2024
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Reviewed/Approved
Yes No Not Remarks
Applicable
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
☐ ☐ ☐
Job Descripition
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
Total Project Cost
65,000.00
65,000.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
65,000.00 130,000.00
65,000.00 - 130,000.00
CO FINEX Total
(D) (E) (F)
65,000.00 130,000.00
65,000.00 - 130,000.00
No. of employees 3
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
Approved By:
Approved By:
Approved By:
DICKSON
DICKSON P.
DICKSON P. HERMOSO
P. HERMOSO
HERMOSO
Head of
Head
Head of Ministry/Office
of Ministry/Office
Ministry/Office
Approved
Approved By:
By:
Approved By:
DICKSON P.
DICKSON P. HERMOSO
HERMOSO
DICKSON P. HERMOSO
Head
Head of
of Ministry/Office
Ministry/Office
Head of Ministry/Office
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
GRAND TOTAL - -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
Approved By:
Approved By:
Approved By:
DICKSON
DICKSON P.
DICKSON P. HERMOSO
P. HERMOSO
HERMOSO
Head
Head of
of Ministry/Office
Ministry/Office
Head of Ministry/Office
BBP Form 310-b
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
Procured Laptops 2
Procured Projectors 1
Procured Scanner 1
GRAND TOTAL 7 - -
GRAND TOTAL - -
BAI AZ-MAIDA E. LIDASAN JENNY J. SINSUAT, MPA, EnP ATTY. PAISALIN P. TAGO, CPA
Budget Officer III Planning Officer V Head of Ministry/Office MM/DD/YYYY
Approved
Approved By:
Approved By:
By:
DICKSON P.
DICKSON
DICKSON P. HERMOSO
P. HERMOSO
HERMOSO
Head
Head of
Head of Ministry/Office
of Ministry/Office
Ministry/Office
DETAILS OF NEW OR EXPANDED SPENDING PROPOSALS (TIER 2)
4. Categorization New
Expanded
6. Description: Satellite Broadband Connection through VSAT which is the last resort for rem
and Tawi-Tawi)
In support to the roll out of the Computerized Systems of the Sectoral Offices
7. Purpose:
communication and delivery of service to the clientele.
MPWH Certification
MPWH Costing
MENRE Clearance
ICO Certificate
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
Annual Procurement Plans
M/O Operational Plans
Communication Expense
Labor & Materials required for Installation for 14 Site 2,100,000.00
12 Months Subscription Expense for 14 Site 3,360,000.00
GRAND TOTAL 5,460,000.00
PAP 2025
(A) (B)
N/A N/A
GRAND TOTAL -
Prepared By:
4. Categorization New
Expanded
MPWH Certification
MPWH Costing
MENRE Clearance
ICO Certificate
List of Locations
List of Beneficiaries
Feasibility Studies
Engineering Designs
PAP 2024
(A) (B)
N/A N/A
GRAND TOTAL -
Location PS MOOE
(A) (B) (C)
MOTC-BARMM - 3,150,000.00
Prepared By:
✘
Infrastructure
Non-Infrastructure ✘
5,460,000.00
on through VSAT which is the last resort for remote areas in island provinces (Basilan, Sulu
or Offices of MOTC
January 2024
December 2024
Reviewed/Approved
Yes No Not Remarks
Applicable
✘
Reviewed/Approved
Yes No Not Remarks
Applicable
✘
✘
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
5,460,000.00
5,460,000.00
2025 2026
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
2,100,000.00
3,360,000.00
- - 5,460,000.00
CO FINEX Total
(D) (E) (F)
- - -
Approved: Date:
ENANCE
Infrastructure
✘ Non-Infrastructure ✘
3,150,000.00
ve measures such as subsription for anti-virus and license MS Office. Also parts
T Equipments and Devices of MOTC.
January 2024
December 2024
Reviewed/Approved
Yes No Not Remarks
Applicable
✘
Reviewed/Approved
Yes No Not Remarks
Applicable
✘
2025 2026
(C) (D)
- -
Targets
2025 2026
(C) (D)
3,150,000.00
3,150,000.00
2024 2025
(B) (C)
N/A N/A
- -
CO FINEX Total
(D) (E) (F)
-
250,000.00
2,100,000.00
800,000.00
- - 3,150,000.00
CO FINEX Total
(D) (E) (F)
- - 3,150,000.00
- - 3,150,000.00