ITEM & QUANTIES OF 750 KLD AT ESPANIA 1

S .NO DESCRIPTION UNIT QTY RATE AMT


All charges for waterproofing work of STP
tank(U/G) with Epoxy coating as per
A following specifications :

1.        Cleaning the surface free from dust etc.,


Repairing the pot holes and cracks with
acrylic polymer mortar. Injection grouting
the construction joints and corner & edges
with cement slurry admix with waterproofing
chemical through pressure grouting machine
wherever it is required only. SFT 15000
2.        After cleaning & preparation the surface
applying one coat of STP primer shali primer
CT (two component based) over the surface
by brush.
3.        Providing & laying Two coats of Coal
Tar Epoxy coating over primed surface with
STP shali poxy CTE 103 two component
based A&B mixing both the material and
apply by brush after interval of 6 hours in
each coating.
Cleaning Debris, Malba, Water inside the
B structure of STP and shifted the waist outside the PER UNIT 1
site at his own cost
C Scafolding Charges for STP SFT 13500

TOTAL

Note:- 1. Contarctor has to be given gaurantee bond of 10 years


2. The work will be done with all material, tools, tackels
accessaries.
3. Nothing will be provided by client except Water &
Electricity at single place.
REMARKS
ITEM & QUANTIES OF 500 KLD AT TUSCAN CITY LOWRISE
S .NO DESCRIPTION UNIT QTY RATE AMT

All charges for waterproofing work of UASB


& Equalisation Tank only in STP tank(U/G)
situated at lowrise Tuscan City with Epoxy
A coating as per following specifications :

1.        Cleaning the surface free from dust etc.,


Repairing the pot holes and cracks with
acrylic polymer mortar. Injection grouting
the construction joints and corner & edges
with cement slurry admix with waterproofing
chemical through pressure grouting machine
wherever it is required only. (Only in UASB SFT 3500 55 192500
& Equalisation Tank)
2.        After cleaning & preparation the surface
applying one coat of STP primer shali primer
CT (two component based) over the surface
by brush.

3.        Providing & laying Two coats of Coal


Tar Epoxy coating over primed surface with
STP shali poxy CTE 103 two component
based A&B mixing both the material and
apply by brush after interval of 6 hours in
each coating.(Only in UASB & Equalisation
Tank)
Cleaning Debris, Malba, Water inside the
PER UNIT
B structure of STP and shifted the waist outside the TANK 5 5000 25000
site at his own cost
C
Scafolding Charges for STP(Only in UASB & SFT 3500 2 7000
Equalisation Tank)
D
Chipping of old plaster work (Only in UASB & sft 1000 20 20000
Equalisation Tank)
TOTAL 244500

Note:- 1. Contarctor has to be given gaurantee bond of 5 years


2. The work will be done with all material, tools, tackels
accessaries.
3. Nothing will be provided by client except Water &
Electricity at single place.
ISE
REMARKS
ITEM & QUANTIES OF 750 KLD AT TUSCAN HT
S .NO DESCRIPTION UNIT QTY RATE AMT
All charges for waterproofing work of STP
tank(U/G) with Epoxy coating as per
A following specifications :

1.        Cleaning the surface free from dust etc.,


Repairing the pot holes and cracks with
acrylic polymer mortar. Injection grouting
the construction joints and corner & edges
with cement slurry admix with waterproofing
chemical through pressure grouting machine
wherever it is required only. SFT 15000
2.        After cleaning & preparation the surface
applying one coat of STP primer shali primer
CT (two component based) over the surface
by brush.
3.        Providing & laying Two coats of Coal
Tar Epoxy coating over primed surface with
STP shali poxy CTE 103 two component
based A&B mixing both the material and
apply by brush after interval of 6 hours in
each coating.
Cleaning Debris, Malba, Water inside the
B structure of STP and shifted the waist outside the PER UNIT 1
site at his own cost
C Scafolding Charges for STP SFT 13500
TOTAL

Note:- 1. Contarctor has to be given gaurantee bond of 10 years


2. The work will be done with all material, tools, tackels
accessaries.
3. Nothing will be provided by client except Water &
Electricity at single place.
REMARKS
ITEM & QUANTIES OF 750 KLD AT ESPANIA 2
S .NO DESCRIPTION UNIT QTY RATE AMT
All charges for waterproofing work of STP
tank(U/G) with Epoxy coating as per
A following specifications :
1.        After cleaning & preparation the surface
applying one coat of STP primer shali primer
CT (two component based) over the surface
by brush. SFT

2.        Providing & laying Two coats of Coal


Tar Epoxy coating over primed surface with
STP shali poxy CTE 103 two component
based A&B mixing both the material and
apply by brush after interval of 6 hours in
each coating.
Cleaning Debris, Malba, Water inside the
B structure of STP and shifted the waist outside the PER UNIT
site at his own cost
C Scafolding Charges for STP SFT

TOTAL

Note:- 1. Contarctor has to be given gaurantee bond of 10 years


2. The work will be done with all material, tools, tackels
accessaries.
3. Nothing will be provided by client except Water &
Electricity at single place.
REMARKS