QAP Execution
QAP Execution
1 LAND DEVELOPMENT
HOLD POINT FINAL INSPECTION/ IOCL SPECN/ FIELD INSP REPORT Y NO FINISHING /
ACCEPTANCE BEFORE APPD DRGS PLASTERING WORK
COMMENCEMENT OF TO COMMENCE TILL
PLASTERING WORK ON ALL FINAL INSPECTION/
TYPES OF BRICK / BLOCK ACCEPTANCE
WORK
6 TILING
SURFACE PREPARATION IOC SPECN FIELD INSP REPORT Y
SUB-BASE IOC SPECN FIELD INSP REPORT Y
LINE, LEVEL & PLUMB IOC SPECN FIELD INSP REPORT Y
FINISHING IOC SPECN FIELD INSP REPORT Y
POLISHING IOC SPECN FIELD INSP REPORT Y
FINAL INSPECTION IOC SPECN FIELD INSP REPORT Y Y
7 WBM
THICKNESS IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
GRADIENT IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
COMPACTION IOC SPECN FIELD INSP REPORT Y Y
ALIGNMENT & RIGIDITY OF IOC SPECN/ FIELD INSP REPORT Y Y TPI TO CHECK
FORM WORK DRGS DURING THE VISIT
LAYING PVC SHEET IOCL SPECN FIELD INSP REPORT Y Y TPI TO CHECK
DURING THE VISIT
SIZE OF THE PANELS IOC SPECN/ FIELD INSP REPORT Y Y TPI TO CHECK
DRGS DURING THE VISIT
HOLD POINT REINFORCEMENT IOC SPECN/ FIELD INSP REPORT Y Y TPI TO CHECK
DRGS DURING THE VISIT
PLACEMENT OF DOWELS IOC SPECN/ FIELD INSP REPORT Y Y TPI TO CHECK
DRGS DURING THE VISIT
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
MIXING AND LAYING OF IOC SPECN/ FIELD INSP REPORT Y Y IN TWO LAYERS.
CONCRETE DRGS FIRST LAYER TO BE
PLACED BEFORE
REINFORCEMENT
AND AFTER LAYING
REINFORCEMENT
THE SECOND LAYER
SHOULD BE PLACED
WITHIN 30 MINUTES
11 PAINTING
SURFACE PREPARATION IOC SPECN FIELD INSP REPORT Y Y
PAINT PREPARATION IOC SPECN FIELD INSP REPORT Y
NUMBER OF COATS IOC SPECN FIELD INSP REPORT Y
CURING (IF REQUIRED) IOC SPECN FIELD INSP REPORT Y
FINAL INSPECTION/ IOC SPECN FIELD INSP REPORT Y Y
ACCEPTANCE
12 CANOPY /
STRUCTURAL
FABRICATION
MARKING AND CUTTING OF IOC SPECN/ Y
VARIOUS MEMBERS DRGS
JOINING IOC SPECN/ Y
DRGS
JIGS/FIXTURES IOC SPECN/ Y
DRGS
ALIGNMENT IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
WELDING IOC SPECN/ FIELD INSP REPORT Y Y TPI TO INSPECT THE
DRGS SITE WELDING
SIZE AND LOCATION OF THE IOC SPECN/ FIELD INSP REPORT Y Y
HOLES FOR BOLTING DRGS
LEVEL OF BASE PLATE IN IOC SPECN/ FIELD INSP REPORT Y Y
CASE OF CANOPY COLUMNS DRGS
OPENINGS FOR CABLE/ RAIN IOC SPECN/ FIELD INSP REPORT Y Y
WATER PIPES DRGS
13 CANOPY ROOFING
CUTTING AND LAYOUT OF IOC SPECN/ FIELD INSP REPORT Y CUSTOM CUT TO
PANELS DRGS SIZE AS PER THE
APPROVED LAYOUT
GRADIENT IOC SPECN/ FIELD INSP REPORT Y
DRGS
PLACEMENT OF GUTTER AND IOC SPECN/ FIELD INSP REPORT Y Y
CONNECNTION TO DOWN DRGS
TAKE PIPE
PLUMB DEFLECTION OF ROOF Y Y
FLASHING IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
FINAL FINISH/ ACCEPTANCE IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
14 FALSE CEILING
CUTTING AND LAYOUT OF IOC SPECN/ FIELD INSP REPORT Y CUSTOM CUT TO
PANELS DRGS SIZE AS PER THE
APPROVED LAYOUT
LEVEL IOC SPECN/ FIELD INSP REPORT Y
DRGS
JOINT FINISHING IOC SPECN/ FIELD INSP REPORT Y
DRGS
EDGE FINISH AT THE IOC SPECN/ FIELD INSP REPORT Y
JUNCTION WITH STRUCTURES DRGS
CUTTING FOR LIGHT FITTINGS IOC SPECN/ FIELD INSP REPORT Y
ETC. DRGS
FINAL FINISH/ ACCEPTANCE IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
SUSPENDERS MFG. FIELD INSP REPORT Y Y
RECOMMEN. /
SPECI.
15 DOORS/ WINDOWS/
VENTILATORS/
GLAZING
DIMENSIONS OF THE OPENING IOC SPECN/ FIELD INSP REPORT Y Y
AND ALUMINIUM FRAME DRGS
FASTENING DETAILS IOCL SPECN FIELD INSP REPORT Y
FIXING OF GLASS IOCL SPECN FIELD INSP REPORT Y
FIXING OF FLOOR SPRINGS IOCL SPECN FIELD INSP REPORT Y
FIXING OF HANDLES IOC SPECN/ FIELD INSP REPORT Y
DRGS
FIXING OF LOCKS IOC SPECN/ FIELD INSP REPORT Y
DRGS
FINISHING – PLASTER , PAINT IOCL SPECN FIELD INSP REPORT Y
& FUNCTIONING
FINAL INSPECTION/ IOC SPECN/ FIELD INSP REPORT Y Y
ACCEPTANCE DRGS
16 PLUMBING &
SANITION
LINE ,LEVELS PLUMBS & IOC SPECN/ FIELD INSP REPORT Y
LOCATION DRGS
GRADIENT OF SEWAGE LINE IOC SPECN/ FIELD INSP REPORT Y
DRGS
MANHOLES AND INSPECTION IOC SPECN/ FIELD INSP REPORT Y
CHAMBER (SIZE & LOCATION) DRGS
LOCATION & DIMENSION OF IOC SPECN/ FIELD INSP REPORT Y Y LAYOUT TO BE
SEPTIC TANK AND SOAK PITS DRGS VERIFIED BY TPI
INSPECTION - PIPELINE IOCL SPECN FIELD TEST REPORT Y Y
HYDRO TESTING
COMMISSIONING IOCL SPECN FIELD INSP REPORT Y Y Y
17 PRODUCT PIPELINES
ROUTE IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
TRENCH SIZE IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
GRADIENT IOC SPECN/ FIELD INSP REPORT Y Y SUCTION LINE
DRGS 1:120, FILL PIPE
1:60 , VENT PIPE
TOWARDS THE
TANK
JOINTS (WELDED/THREADED) IOC SPECN/ FIELD INSP REPORT Y Y TPI TO VERIFY THE
DRGS QUALIFICATION OF
THE WELDER IN
CASE OF WELDED
PIPELINE
END CONNECTIONS IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
HYDROTESTING IOCL SPECN FIELD TEST REPORT Y Y
HOLD POINT DOPING IOCL SPECN FIELD INSP REPORT Y Y PIPES TO BE LAID IN
THE TRENCH AFTER
DOPING ONLY.
JOINTS TO BE
DOPPED AFTER
HYDRO-TESTING
18 TANKS
INSTALLATION
HOLD POINT DOPING IOCL SPECN FIELD INSP REPORT Y Y TANK NOT TO BE
LOWERED IN THE
PIT TILL INSPECTED
BY TPI
LOCATION OF TANK IOC SPECN/ FIELD INSP REPORT Y TPI TO VERIFY THE
DRGS LOCATIONAL
LAYOUT
SIZE OF PIT IOC SPECN/ FIELD INSP REPORT Y
DRGS
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
CONSTRUCTION OF PIT AND IOC SPECN/ FIELD INSP REPORT Y Y
FOUNDATION DRGS
ORIENTATION IOC SPECN/ FIELD INSP REPORT Y WITH RESPECT TO
DRGS THE LAYOUT OF
VARIOUS LINES
ALIGNMENT IOC SPECN/ FIELD INSP REPORT Y Y Y
DRGS
GRADIENT IOC SPECN/ FIELD INSP REPORT Y Y Y
DRGS
ANCHORING IOC SPECN/ FIELD INSP REPORT Y Y Y
DRGS
HOLD POINT HYDROTESTING INSIDE THE IOCL SPECN FIELD TEST REPORT Y Y Y
PIT
EARTHING CONNECTION IOCL SPECN/ FIELD TEST REPORT Y EARTH RESISTANCE
DRGS TEST TO BE
CARRIED OUT
BEFORE BACK
FILLING
19 PUMP INSTALLATION
FOUNDATION IOC SPECN/ FIELD TEST REPORT Y
DRGS
BASE FRAME FIXING IOC SPECN/ FIELD TEST REPORT Y Y
DRGS
LINE, LEVEL & PLUMB IOC SPECN/ FIELD TEST REPORT Y
DRGS
PIPELINE CONNECTION IOC SPECN/ FIELD TEST REPORT Y Y
DRGS
CABLE TERMINATION IOC SPECN/ FIELD TEST REPORT Y Y ENSURE FLAME
DRGS PROOF
TERMINATION
USING FLP GLAND
20 ELECTRICAL WORKS
a EARTHING
b CONDUITING
c WIRING
d SWITCH BOARDS
e LIGHTING
f FANS
g CABLING
h EQUIPMENT INSTALLATION
(AIR COMPRESSORS, AIR
GAUGES)
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
LOCATION IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
FOUNDATION IOC SPECN/ FIELD INSP REPORT Y
DRGS
LEVELLING IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
CABLE TERMINATION IOC SPECN/ FIELD INSP REPORT Y Y
DRGS
EQUIPMENT AFTER
ARRIVAL AT SITE
BEFORE
INSTALLATION
FOUNDATION DRG Y
LEVEL DRG Y
DIMENSIONS DRG / MTC
FOUNDATION BOLT POSITION DRG / MTC
AND DIMENSIONS
INSTALLATION
MOUNTING DRG Y
LEVELLING DRG Y
GROUTING
WETTING DRG Y
GROUT FILLING Y
CURING Y
FINISHING DRG Y Y
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
COMMISSIONING
I) NO LOAD RUN TEST TEST
II)FULL LOAD RUN TEST TEST
FRP TANKS
IV) BEDDING AND BACK
FILLING TEST
IV) ANCHORING
V) INSTALLATION
VI) HYDRO-TESTING AND
INSPECTION FOR CONNECTION
TO FRP TANKS
VII) FINAL INSPECTION
SIGNAGES
I) FRP CLADDING AND
METALLIC FRAMES
II) POLYCARBONATE SHEETS
FOR TRANSLUCENT PORTIONS
FOR BACKLIT SIGNAGE
*THICKNESS
* DIMENSION CHECK
III) ILLUMINATION IN
SIGNAGES / LUX LEVEL
IV) VINYL FILM FOR SIGN
MATERIAL AND LETTERING –
U.V. TREATMENT/VENDOR
APPROVAL
V)LETTERING IN HELVETIC
BOLD TYPE FACE
VI) COLOUR SCHEME FOR
SIGNAGES
VII)FINAL INSPECTION
LIGHTING
I) TYPE OF LIGHT FITTING /FRP
FITTING
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
II) FLAME PROOF WORTHINESS
TEST FOR FRP FITTING
TYPE OF CABLE
I) VENDOR APPROVAL
II) CONFORMITY TO
SPECIFICATIONS FOR
VARIOUS USAGE.
A) CHECK FOR SEALING IN
BOTH ENDS
B) CHECK FOR IR VALUES IF
SEALING IS NOT DONE WITH
HEAT SHRINKABLE SLEEVES
OR EPOXY COMPOUND
INSTALLATION AT
SITE
CORRECTNESS OF CABLE
ROUTE
INSULATION RESISTANCE OF
ALL CORES TO EARTH AND
BETWEEN CORES
TYPE OF
GLAND/SPECIFICATIONS
GLAND THICKNESS
TERMINAL TIGHTNESS
SN ACTIVITY INSPECTION SCOPE REFERENCE RECORD "TEST AND INSPETION" REMARKS
DESCRIPTION DOCUMENT ACCEPTANCE AUTHORITY
M C TPI IOCL
CORRECT POSITION OF
CABLES
CHECK FOR PROPER LENGTH
OF CABLES AT THE ENDS
BEFORE CUTTING THE
CABLES.
CHECK FOR THE SEALING OF
THE ENDS FOR BALANCE
POWER CABLE IN THE DRUM