Concrete Work Cheklist
Concrete Work Cheklist
Project Name
Client
Project Location
Area of Inspection
17. Confirm water is poured into the form surface and steel before concrete.
18. Confirm height of free fall of concrete is within 1m to prevent
segregation
19. Confirm compaction is properly undertaken, vibrator is place vertically to
the concrete at least 15minutes after placing.
20. Confirm vibration is stopped immediately the laitance of mortar is seen at
the concrete surface
21. Confirm concrete surface is kept wet till striking off formwork.
22. Confirm movement on concrete is avoided after placing.
23. Confirm concrete surface level is well maintained on floor slabs and
footings.
Corrective Remarks