Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 94

FLOTA BELL

2016 2017 2018 2019 2020 2021 2022


Ene 57.54% 72.82% 74.01% 73.29% 71.07% 74.63% 60.87%
Feb 60.67% 76.03% 75.84% 76.16% 54.55% 74.38% 62.28%
Marz 59.65% 74.69% 73.54% 74.26% 51.41% 70.11% 62.45%
Abril 65.19% 74.64% 74.33% 75.75% 62.09% 71.99% 75.96%
Mayo 62.07% 74.57% 75.34% 73.22% 60.68% 73.52% 69.90%
Junio 74.38% 75.68% 74.44% 69.04% 71.30% 74.12%
Julio 66.97% 74.74% 75.14% 75.65% 69.89% 66.26%
Agosto 69.36% 72.44% 73.80% 69.72% 68.82% 66.80%
Sep. 69.96% 70.26% 75.67% 75.70% 66.77% 67.88%
Oct 71.75% 74.29% 74.61% 75.19% 63.80% 61.89%
Nov 69.86% 74.63% 73.67% 69.70% 75.22% 69.84%
Dic 70.65% 73.29% 72.74% 72.18% 65.82% 62.64%

2016 2017 2018 2019


Mes UH1N UH-1HII UH1N UH-1HII UH1N UH-1HII UH1N UH-1HII
Enero 48.59% 66.49% 69.96% 75.67% 71.18% 76.83% 73.12% 73.46%
Febrero 56.45% 64.89% 73.33% 78.72% 73.10% 78.57% 79.76% 72.56%
Marzo 57.85% 61.45% 73.98% 75.40% 73.33% 73.75% 77.85% 70.67%
Abril 63.11% 67.27% 70.67% 78.61% 72.44% 76.21% 74.67% 76.82%
Mayo 53.76% 70.38% 73.76% 75.37% 73.55% 77.13% 70.22% 76.21%
Junio 71.33% 77.42% 72.89% 78.47% 72.67% 76.21% 71.11% 66.97%
Julio 67.96% 65.97% 70.75% 78.73% 74.62% 75.66% 74.46% 76.83%
Agosto 70.97% 67.74% 71.94% 72.93% 70.75% 76.85% 72.85% 66.58%
Septiembre 69.78% 70.14% 67.62% 72.90% 71.33% 80.00% 80.56% 70.83%
Octubre 69.03% 74.47% 71.43% 77.14% 73.55% 75.66% 73.61% 76.77%
Noviembre 65.11% 74.60% 78.81% 70.45% 74.00% 73.33% 72.73% 66.67%
Diciembre 63.87% 77.42% 72.29% 74.29% 74.92% 70.56% 63.40% 80.95%
ALISTAMIENTO FLO
80.00%

70.00%

60.00%

50.00%

40.00%

30.00%
2020 2021 2022
UH1N UH-1HII UH1N UH-1HII UH1N UH-1HII
69.79% 72.35% 85.34% 63.91% 61.94% 59.80% 20.00%
Ene Feb Marz Abril Mayo Junio Julio
45.45% 63.64% 80.00% 68.75% 78.21% 46.34%
43.70% 59.12% 71.67% 68.54% 59.03% 65.87% 2016 2017 2018 2019
64.84% 59.33% 79.42% 64.56% 76.24% 75.68%
64.77% 56.59% 82.02% 65.01% 70.00% 69.80%
71.22% 71.38% 78.97% 69.27%
74.19% 65.59% 64.09% 68.43%
74.19% 63.44% 66.79% 66.80%
69.30% 64.24% 70.37% 65.38%
62.40% 65.19% 62.76% 61.01%
81.48% 68.96% 74.38% 65.29%
69.37% 62.26% 68.89% 56.38%
STAMIENTO FLOTA BELL

z Abril Mayo Junio Julio Agosto Sep. Oct Nov Dic

2018 2019 2020 2021 2022


FECHA TÉCNICO FLOTA AERONAVE
JAVIER
TORREZ
1-Dec OJEDA UH-1HII EJC5418
JAVIER
TORREZ
2-Dec OJEDA UH-1N EJC4212
JAVIER
TORREZ
3-Dec OJEDA UH-1N EJC4212
JAVIER
TORREZ
6-Dec OJEDA UH-1N EJC4212
JAVIER
TORREZ
7-Dec OJEDA UH-1N EJC4212
JAVIER
TORREZ
9-Dec OJEDA UH-1N EJC4212
JAVIER
TORREZ
10-Dec OJEDA UH-1N EJC4212
DESCRIPCIÓN IMPREVISTO TIEMPO
S MUERTO HH

Sé apoyo en la aeronave EJC 5418. en la linia 8

Sé está a siendo inspección en el teiboom dé la aeronave


EJC 4212 8
Sé reparó bisagra de la compuerta de compartimiento de
motor L/H y sé reparó soporte dónde se sostiene la puerta en
el teiboom 8

Sé removieron remaches y Bisel y sello de la cubierta de


entrada de Aire del motor LH 8

Sé removieron remaches y Bisel y sello de la cubierta de


entrada de Aire del motor RH 8

Sé removieron remaches y Bisel y sello de la cubierta de


entrada de Aire del motor RH 8

Se instalaron cinta antifricción y empaques de puertas de


inspección RH and LH. 8
TÉCNICO Suma de HH
ALDEMAR AYALA CASTILLO 48
ANDRES F CARDONA RAMIREZ 48
ARGEMIRO PEREZ ZAPATA 48
CAMILO GALLEGO TORRES 48
CARLOS ANDRES MARTINEZ CARDONA 48
CARLOS RENTERIA 48
DAVID CASTAÑO GARAY 48
EDGAR CASTILLO RUIZ 48
EDUARDO SANTOS BONILLA 48
ELMER JAVIER VILLAMIZAR 56
ENRIQUE PERDOMO ORTIZ 48
FERNANDO PLATA NUÑEZ 56
GERARDO CRUZ SALAMANCA 48
GUILLERMO LEON CHALACAMA 48
HERMES ZAPATA 48
HUVER ARCE SOGAMOSO 48
ISAIAS CORREA 48
JAIRO QUIROZ RODRIGUEZ 48
JAVIER TORREZ OJEDA 56
JHON EDGAR ROMERO VARGAS 48
JONNY LEANDRO ROJAS 48
JORGE ERNEY VIANCHA VARGAS 56
JOSE AMADEO SANCHEZ 56
JOSE LUIS ESCOBAR 48
JUAN CARLOS PINZÓN 48
LEONEL RIVAS 56
LUCAS LARA CABALLERO 48
LUIS CARLOS PAHUANA FRANCO 52
LUIS FELIPE PARRA 53
LUIS FERNANDO MONTILLA SOSA 48
LUIS FERNANDO RENGIFO HERNANDEZ 48
MANUEL ANTONIO PATIÑO 56
PEDRO JOSE RICARDO BARRERO 48
RAFAEL AVELLA PATIÑO 24
RUBEN ANTONIO URUETA 16
STIVENS ARCOS HERNÁNDEZ 48
WALTER MEJIA AGUDELO 48
WILLIAM CUERVO HERNANDEZ 48
WILSON BARBOSA MONGUI 48
YECID CASTILLO ESCARRAGA 48
YESID GUZMAN PEREZ 48
Total Result 1977
FECHA TÉCNICO FLOTA AERONAVE DESCRIPCIÓN
YESID
GUZMAN Sé trabajó en la desmilitarisación de
1-Dec PEREZ UH-1N EJC4209 la aeronave.

Control corrosión sistema de


ANDRES F controles de vuelo, instalación de
CARDONA botas cíclicos, chequeo Rigg
1-Dec RAMIREZ UH-1HII EJC5411 pedales.

Taller de motores. Remoción,


limpieza e inspección de la válvula
divisora de flujo del motor T-53 L-
703 S/N LE-12629Z para casa fallas
HERMES en la línea de vuelo del helicóptero
1-Dec ZAPATA OTROS EJC 5437.

Impieza inspección y control


corrosión de las zapatas del tren de
aterrizaje, limpieza inspección y
control corrosión de los tubos
transversales y longitudinales del
tren de aterrizaje, aplicación de
primer a las zapatas y al tren de
aterrizaje, reinstalación de las
STIVENS zapatas al tren de aterrizaje.
ARCOS Remoción del rotor principal y
HERNÁNDE remoción del plato dinámico y
1-Dec Z UH-1N EJC4212 estático.
Instalación palas del rotor principal,
LEONEL balanceo, alineación, tratamiento
1-Dec RIVAS UH-1HII EJC5425 anticorrosivo

LUIS Instalación cubierta vertical fin,


FERNANDO instalación cubierta Tail skid,
MONTILLA instalación cubierta y luces del
1-Dec SOSA UH-1HII EJC5411 tailboom control corrosión Tail boom

Remoción rotor principal. Remoción


GUILLERM conjunto del plato dinamico y
O LEON manga colectiva. Prepracion Barra
CHALACAM estabilizadora para enviar al taller
1-Dec A UH-1N EJC4212 de pinturas.

EDUARDO Instalaccion de barra estabilizadora


SANTOS inspección de ductos de escape
1-Dec BONILLA UH-1HII EJC5425 motor y control de corrossion
MANUEL Inspección fase de 300 horas,
ANTONIO Instalación sillas de los Pasajeros, Remolque del EJC 4216 y 54
1-Dec PATIÑO UH-1HII EJC5411 acondicionamiento de la cabina.
Remoción reinstalación inspección
limpieza y reemplazo packing y
elemento filtro de aceite motor No 1
y motor No 2

Remoción reinstalación inspección


limpieza y reemplazo packing y
elemento filtro de aceite Gearbox

Remoción reinstalación inspección


limpieza y reemplazo packing
metiring tee motor No 1 y motor No
2
DAVID
CASTAÑO Llenado de formas libro de fase
1-Dec GARAY UH-1N EJC4212 2408-13-2 e ítem fallas

Preinstalacion e instalación de rotor


ALDEMAR principal barra estabilizadora
AYALA instalación de grúa tratamiento de
1-Dec CASTILLO UH-1HII EJC5425 inspección de palas .
ARGEMIRO Se efectuó PMD y se removio pipa
PEREZ de escape del motor para cambiar
1-Dec ZAPATA UH-1HII EJC5437 válvula difusora de combustible

Inspección fase al EJC 5425


Preparación de bancos y
herramientas para posteriormente
ensamblar palas al hub del rotor
principal.
Alineamiento y balanceo del rotor
principal
CARLOS Instalación del rotor principal a la
1-Dec RENTERIA UH-1HII EJC5425 aeronave
EDGAR Limpieza e inspeccion. Corrosion
CASTILLO compartimientos traseros celdss de
1-Dec RUIZ UH-1N EJC4212 combustible
EDGAR
CASTILLO Remosion. Baston colectivo para
1-Dec RUIZ UH-1HII EJC5429 ser instalado en ejc 5436
EDGAR
CASTILLO Remosion rotor principal.
1-Dec RUIZ UH-1N EJC4212 Remosion. Swachplate

WILLIAM
CUERVO Cambio filtros motores
HERNANDE Servicio 200 horas
1-Dec Z UH-1N EJC4212 Servicio filtros hidraulicos
EJC5425 01- Diciembre. Se efectuó
ensamble palas del rotor principal y
Hub, Se efectuó alineamiento y
balance estático, se instaló rotor
JOSE LUIS principal en la aeronave. instalación
1-Dec ESCOBAR UH-1HII EJC5425 barra estabilizadora en proceso.

ELMER Corrección de reportes en estatus


JAVIER en / efectuados por el inspector por
VILLAMIZA término de fase y armado de la
1-Dec R UH-1HII EJC5427 aeronave.

- Se instaló generador arrancador


en el motor
- Se instaló generador principal en
la transmisión
- Se aplicó p.r.c en la cubierta
izquierda y derecha de las luces de
posición de cola
- Se instaló p.r.c en la cubierta del
patín de cola (care vaca)
PEDRO - Se autorizaron formatos 2408-13-1
JOSE y 2408-13-2 en el libro del
RICARDO helicóptero.
1/12 BARRERO UH-1HII EJC5411

WALTER -inspection phase 200 hrs


MEJIA - treatment corrosión and treatment
1/12 AGUDELO UH-1N EJC4212 hongus tailboom vertical fin
JUAN
CARLOS se efectuo todas las anotaciones del
1-Dec PINZÓN UH-1HII EJC5427 libro 100% por termino final de fase

JORGE
ERNEY
VIANCHA Remocion de componentes
1-Dec VARGAS UH-1N EJC4202 aeronave en desmilitarizacion
FERNANDO Remoción rotor principal, remoción
PLATA plato giratorio, control corrosión
1-Dec NUÑEZ UH-1N EJC4212 cabina
JOSE
AMADEO Trabajos de reparación y remplazo
1-Dec SANCHEZ UH-1N EJC4224 ventana inferior lado piloto

Inspección EJC 5425 instalación de


LUIS palas del rotor principal. ...
CARLOS alineación y balanceo del rotor
PAHUANA principal .. instalación del rotor
1-Dec FRANCO UH-1HII EJC5425 principal la helicóptero..
Fase 200hrs

- Limpieza área del cuerno y


elevadores

CARLOS EJC 4224


ANDRES
MARTINEZ - Instalación equipo Rads-at para
1-Dec CARDONA UH-1N EJC4212 toma del rotor principal

Linea de vuelo ejc 5437


Remocion tail pipe y cubiertas del
motor
JAIRO Remocion pipa de exosto
QUIROZ Remocion pared de fuego
RODRIGUE Se efectuo chequeo torque rotor
1-Dec Z UH-1HII EJC5437 principal

YESID
GUZMAN Sé trabajó en la desmilitarisación de
2-Dec PEREZ UH-1N EJC4209 la aeronave.

tractado de los hangares ala


JUAN plataforma de linea de 4
CARLOS helucopteros ejc
2-Dec PINZÓN UH-1HII EJC5425 4213..4216...4225...4205
JOSE Trabajos de inspección de filtros de
AMADEO los motores y trabajos de inspección
2-Dec SANCHEZ UH-1N EJC4212 de 200 horas

Caza fallas por alta temperatura en


el encendido del motor T53-L-703
del helicóptero EJC 5437 en la linea
HERMES de vuelo, elaboracion de formas
2-Dec ZAPATA UH-1HII EJC5437 2408-13-2.
EDUARDO Inspección de huecos fin vertical y
SANTOS limpieza por hongos instalaccion de
2-Dec BONILLA UH-1HII EJC5425 cubiertas

Instalación zapatas de los tubos


longitudinales, verificación torque de
STIVENS los soportes de los tubos
ARCOS longitudinales con los transversales,
HERNÁNDE aplicación de sellante. Limpieza del
2-Dec Z UH-1N EJC4212 mástil de la transmición.

GUILLERM
O LEON Desensamble reservorios
CHALACAM hidraulicos. Limpieza, inspeccion.
2-Dec A UH-1N EJC4212 Elaboracion formas 2408-13-2.
Tractado de 04 aeronaves.
ELMER Corrección de novedades en
JAVIER papelería forma 2408-13-1 y 24-08-
VILLAMIZA 13-2 encontradas en el libro de
2-Dec R UH-1HII EJC5427 vuelo encontrarás por el inspector

Inspección 300 hrs EJC 5425 .


LUIS Instalación barra estabilizadora del
CARLOS rotor principal.. reglajes de los
PAHUANA damper de amortiguación de la
2-Dec FRANCO UH-1HII EJC5425 barra ...

Espera en
Celestiales
Remolque de aeronaves para de rodaje
plataforma de vuelo EJC 4216 EJC por orden de
ALDEMAR 4224,EJC 4213,EJC 5423 SE seguridad
AYALA REALIZA INSPECCIÓN DE torre de
2-Dec CASTILLO UH-1HII EJC5425 CABINA GENERAL control

LUIS
FERNANDO Instalación paneles del pulmón
MONTILLA chequeo inventario fase 300hrs,
2-Dec SOSA UH-1HII EJC5411 control corrosión sillas de tropa

Chequeo del inventario de fase


ANDRES F 300hrs, limpieza burbujas poto y
CARDONA copiloto, limpieza windshield y
2-Dec RAMIREZ UH-1HII EJC5411 control corrosión pedestal central

Inspección fase al EJC 5425.


Corrección de imprevistos
reposicionamiento de líneas
hidráulicas y de aceite y
abrazaderas en el hueco de la
transmisión.
CARLOS Revisión de libros de inspección y
2-Dec RENTERIA UH-1HII EJC5425 de vuelo.

- Se efectuó limpieza y control


anticorrosivo al lado izquierdo del
techo en la cabina de carga y
pasajeros.
PEDRO - Se efectuó limpieza y control
JOSE anticorrosivo al techo en la cabina
RICARDO de pilotos.
2-Dec BARRERO UH-1HII EJC5411

JAIRO Linea de vuelo ejc 4207


QUIROZ Remocion e instalacion barra
RODRIGUE estabilizadora
2-Dec Z UH-1N EJC4207 Por reporte de mantenimiento
Inspección tanque combustible
delanteros
Linpieza tanques combustible
WILLIAM derecho
CUERVO Instalación bonbas combustible
HERNANDE Instalación paneles superior tamque
2-Dec Z UH-1N EJC4212 combustible

EJC5425 02-Diciembre. Instalacion


barra estabilizadora completada, se
efectuó ajuste de los dampers de la
barra estabilizadora encontrandose
JOSE LUIS un damper contaminado reemplazo
2-Dec ESCOBAR UH-1HII EJC5425 en proceso.
ARGEMIRO
PEREZ Remoción e instalación de la barra
2-Dec ZAPATA UH-1N EJC4207 estabilizadora formas y registro ok
MANUEL Inspección fase de 300 horas, guía
ANTONIO de control corrosión, sección de
2-Dec PATIÑO UH-1HII EJC5411 cabina
FERNANDO Inspección fase de 200 horas
PLATA control corrosión compartimientos
2-Dec NUÑEZ UH-1N EJC4212 de cabina

Remoción reinstalación reemplazo


elemento y packing filtro externo de
combustible motor No 1

Remoción reinstalación inspección


limpieza reemplazo packing y
elemento filtro externo de
combustible motor No 2

Remoción reinstalación inspección


limpieza y reemplazo gasket bujías
motor No 1

Remoción reinstalación inspección


limpieza y reemplazo gasket bujías
motor No 2

DAVID Remoción reinstalación inspección


CASTAÑO limpieza caps PY control automático
2-Dec GARAY UH-1N EJC4212 de combustible motor No 1 y No 2
WALTER -inspection phase 200 hrs
MEJIA * inspection tailboom and control
2/12 AGUDELO UH-1N EJC4212 corrosión and hongus 50%
Inspeccion corrosion limpieza
EDGAR compartimientos lineas de
CASTILLO combustible
2-Dec RUIZ UH-1N EJC4212 Controles de vuelo

Tractado helicopteros EJC - 4224,


EJC-5416- EJC-4213 EJC-3212
LEONEL remosion de pintura de liso de la
2-Dec RIVAS UH-1HII EJC5425 cabina EJC-5425

Inspección fase al EJC 5425.


Corrección de imprevistos,
reposicionamiento de líneas
hidráulicas,de aceites y
reposicionamiento de abrazaderas
del hueco de la transmisión.
CARLOS Revisión de libros de vuelo, para
2-Dec RENTERIA UH-1HII EJC5425 preparar la finalización de la fase.

Fase 200 hrs

- limpieza y inspección de los


elevadores
Aplicación de lubricante seco
- desconexión de la preinstalación
de los servos cíclicos derecho y
CARLOS izquierdo
ANDRES - limpieza y preservación de los
MARTINEZ servos para ser entregados ao
2-Dec CARDONA UH-1N EJC4212 almacén

Se efectuaron ajustes en el rotor


ARGEMIRO principal auto rotaciones bajas
PEREZ formas y registro en formas 2408-
2-Dec ZAPATA UH-1HII EJC5437 13-2 y2408-13-1 actualizadas

MANUEL Inspección fase de 300 horas, guía


ANTONIO de control corrosión sección de
3-Dec PATIÑO UH-1HII EJC5411 cola.
YESID
GUZMAN Sé trabajó en la desmilitarisación de
3-Dec PEREZ UH-1N EJC4209 la aeronave.

JORGE
ERNEY
VIANCHA Remocion de componentes
3-Dec VARGAS UH-1N EJC4202 aeronave en desmilitarizacion

Taller de motores. Desensamble,


limpieza, inspección y
mantenimiento de 02 actuadores de
HERMES banda de sangrado de los motores
3-Dec ZAPATA OTROS T53-L-703
JOSE
AMADEO Trabajos de corrección de reportes
3-Dec SANCHEZ UH-1HII EJC5411 por termino de fase de 300 horas
FERNANDO
PLATA Inspección de 200 horas instalación
3-Dec NUÑEZ UH-1N EJC4212 de paneles y reglaje control cíclico

Se completó balance dinámico al


rotor de cola y se removio equipo y
se instalo en el rotor principal para
ARGEMIRO chequear. Tracking y balance
PEREZ ajusten de N2 motor 1 y motor 2
3-Dec ZAPATA UH-1N EJC4224 formas y registro ok

GUILLERM Inspeccion y control corrosion


O LEON varillaje controles de vuelo area de
CHALACAM la cabina. Chequeo de cushion en
3-Dec A UH-1N EJC4212 proceso.

- Corrección de reportes de pre


inspección 100 %
PEDRO - Ajuste de la varilla de control de
JOSE los Damper de la barra
RICARDO estabilizadora.
3-Dec BARRERO UH-1HII EJC5411

STIVENS
ARCOS
HERNÁNDE Limpieza de la transmición y mástil
3-Dec Z UH-1N EJC4212 en proceso.

se efectuo control corrosion alas


cubiertas laterares 2 del motor y la
cubierta superior .
con pintado de las mismas

JUAN control corrosion instalacion de


CARLOS letreros del lado derecho del motor
3-Dec PINZÓN UH-1HII EJC5425 y plataforma

Inspección fase al EJC 5425.


Corrección de imprevistos
encontrados en la inspección fase.
CARLOS Ejecución libros de vuelo, formas
3-Dec RENTERIA UH-1HII EJC5425 2408-13-2

WILLIAM
CUERVO Desistalacion rotor principal
HERNANDE Desistalacion plato de control
3-Dec Z UH-1N EJC4212 Servicio fase a la transmisión

Linea de vuelo ejc 5437


Se efectuo inspeccion pmd
Se efectuo ajuste al control
collectivo por reporte piloto
JAIRO Se efectuo inspeccion de 25 horas a
QUIROZ la aeronave lubricacion general y
RODRIGUE lavado de palas del rotor principal y
3-Dec Z UH-1HII EJC5437 rotor de cola
EDGAR
CASTILLO Inspeccion limpieza
3-Dec RUIZ UH-1N EJC4212 compartimientos cabina generales
EDGAR
CASTILLO Carreteo aeronaves. En plataforma
3-Dec RUIZ UH-1HII EJC5433 de mantenimiento

Instalación frenos bujías motor No 1

Remoción inspeccion y limpieza


filtros P3 motor No 1 y No 2

Remoción toma aire de sangrado


motor No 1 y No 2

Inspección y limpieza control de


combustible motor No 1 y No 2

Inspección y limpieza housing de


los generadores motor No 1 y No 2

DAVID Tractado aeronaves EJC 4213 y


CASTAÑO EJC 5433 desde la plataforma al
3-Dec GARAY UH-1N EJC4212 hangar
ELMER
JAVIER Corrección de reportes en estatus
VILLAMIZA en / efectuados por el QC en
3-Dec R UH-1HII EJC5427 inspección de 100 %

CARLOS Fase 200 hrs


ANDRES
MARTINEZ - limpieza y inspección remoción de
3-Dec CARDONA UH-1N EJC4212 hongos tailboom parte interna

EJC5425 03-Diciembre.Control
corrosion y aplicación primer pernos
que aseguran la XMSN. Reemplazo
de un damper de la barra
JOSE LUIS estabilizadora en proceso. EJC4205
3-Dec ESCOBAR UH-1HII EJC5425 Remoción elevadores.

JORGE
ERNEY
VIANCHA Remocion de componentes
3-Dec VARGAS UH-1N EJC4209 aeronave en desmilitarizacion
EDUARDO Servicio de aceite a la transmisión
SANTOS con royco 555 inspección huecos
3-Dec BONILLA UH-1HII EJC5425 tailboom instalación cubiertas
Inspección de pisos remoción de
ALDEMAR bellcro remplazo instalación de cinta
AYALA negra bellcro para instalación de
3-Dec CASTILLO UH-1HII EJC5425 blindaje corrosión y pintura

* inspection phase 200 hrs


WALTER - inspection and treatment corrosion
MEJIA tailboom 90%
3-Dec AGUDELO UH-1N EJC4212 - clean and treatment hongus 100%

YESID
GUZMAN Sé trabajó en la desmilitarisación de
6-Dec PEREZ UH-1N EJC4209 la aeronave.
ANDRES F
CARDONA
6-Dec RAMIREZ UH-1HII EJC5411 Inventario aeronave

Taller de motores. Ensamble de 02


actuadores de la banda de
sangrado de los motores T-53 L-703
S/N X6-105 y S/N X1-55.
lavado de filtros de aire P3 de los
motores T400 CP400 con
HERMES ultrasonido y elaboración de tarjetas
6-Dec ZAPATA OTROS amarillas.
JOSE
AMADEO Trabajos de inspección de fase de
6-Dec SANCHEZ UH-1HII EJC5425 300 horas, inspección repack

- Se reemplazó tubo de presión de


aceite de la transmisión ubicado
entre el radiador y la
válvula de drenaje
- Se efectuó limpieza al
compartimiento inferior de los
pedales de piloto y copiloto
- Se instalaron cubiertas de acceso
a la parte interna del tail boom en la
parte inferior
- Se instaló tapa del hueco del
diablo removida por remplazo del
tubo de presión de aceite
de la transmisión
PEDRO - Se le diligenciaron formatos 2408-
JOSE 13-1 y 2408-13-2 en el libro del
RICARDO helicóptero.
6/12 BARRERO UH-1HII EJC5411
Inspección de la transmisión
remplazo de abrazaderas
Inspección de líneas por roturas
desgaste obstrucción y corrosión
ALDEMAR inspección por goteras y escapes
AYALA en líneas de Hidráulico aceite
6-Dec CASTILLO UH-1HII EJC5425 combustible

STIVENS
ARCOS Control corrosión de la barra
HERNÁNDE estabilizadora, remoción del tubo
6-Dec Z UH-1N EJC4212 delantero del tren de aterrizaje.

Repack hanguers, caja de 42


grados caja de 90 grados, quill de
LEONEL salida de la transmisión, inspección
6-Dec RIVAS UH-1HII EJC5425 de ejes

Limpieza, inspección y control


corrosión de los motores, caja
RAFAEL combinada, paredes de fuego y
AVELLA deck del motor
6-Dec PATIÑO UH-1N EJC4212

Control corrosion. Barra


GUILLERM estabilizadora para pintar.
O LEON Inspeccion y limpieza palas rotor
CHALACAM principal. Inspeccion y limpieza silla
6-Dec A UH-1N EJC4212 copiloto.
ELMER
JAVIER
VILLAMIZA
6-Nov R UH-1HII EJC5425 Inicio de inspección repack

Remoción limpieza inspección y


reinstalación mala compresor motor
No 1

Inspección limpieza control


corrosión alabes del compresor
motor No 1

Remoción inspección y limpieza


malla compresor motor No 2

Inspección limpieza y control


corrosión alabes compresor motor
No 2

DAVID Remoción reinstalación reemplazo


CASTAÑO gasket toma blee air motor No 1 y
6-Dec GARAY UH-1N EJC4212 No 2
Inspeccion y limpieza palas y hub
GUILLERM rotor principal. Tratamiento
O LEON corrosion Barra estabilizadora para
CHALACAM pintar. Inspeccion y limpieza silla
6-Dec A UH-1N EJC4212 copiloto y remoción del frame
ARGEMIRO Se continúa con las pruebas y
PEREZ ajustes al rotor principal y ajuste del
6-Dec ZAPATA UH-1N EJC4224 motor #2

- inspection phase 200 hrs


* inspection and treatment hongus
tailboom 100 % completed
* installed bellcranck of flight control
WALTER control tube of gearbox 90°
MEJIA * installed bellcranck of flight control
6/12 AGUDELO UH-1N EJC4212 tube of intermediate gearbox 42°

JORGE
ERNEY
VIANCHA Remocion de componentes
6-Dec VARGAS UH-1N EJC4209 aeronave en desmilitarizacion
EDUARDO
SANTOS Inspección repack hangers
6-Dec BONILLA UH-1HII EJC5425 cuoplings cajas 42 y90

Inspección pernos del bipode y


LUIS trípode del motor ... Inspección y
CARLOS lubricación de los acoples flexible
PAHUANA ejes impulsores del rotor de cola ..
6-Dec FRANCO UH-1HII EJC5425 EJC 5425
JUAN
CARLOS
6-Dec PINZÓN UH-1HII EJC5425 iniciamos inspeccion repack

Inspeccion corrosion y remosion


EDGAR pintura tubos de soportes conjunto
CASTILLO de sillas pasajeros
6-Dec RUIZ UH-1N EJC4212 Lavado de sillas pasajeros
FERNANDO
PLATA Inspección fase de 200 horas
6-Dec NUÑEZ UH-1N EJC4212 inspección sillas de pilotos

Reenplazo bellcram control rotor de


WILLIAM cola
CUERVO Instalación rotor de cola
HERNANDE Torqueo tuerca rotor de cola
6-Dec Z UH-1N EJC4212 Linpieza compresor motor 1 y 2
Fase 200 hrs

- ensamble de contrapezas de la
CARLOS crosshead
ANDRES - reemplazo de link's 2EA rotor de
MARTINEZ cola
6-Dec CARDONA UH-1N EJC4212 - limpieza interna tailboom al 100%

Linea de vuelo ejc 4224


Se efectuo inspeccion pmd
JAIRO Se efectuaron correcciones de
QUIROZ tracking and balance al rotor
RODRIGUE principal brazo de arrastre.
6-Dec Z UH-1N EJC4224 Continua...
JOSE LUIS EJC5425 06-Diciembre. Reem
6-Dec ESCOBAR UH-1HII EJC5425 EJC5425 06-Diciembre

LUIS
CARLOS Inspección lubricación engarce
PAHUANA acoples flexible.. ejes del rotor de Pendiente
6-Dec FRANCO UH-1HII EJC5425 cola .. EJC 5425 repuestos

LUIS
FERNANDO
MONTILLA
6-Dec SOSA UH-1HII EJC5411 Corrección reportes 100%

Inspección fase al EJC 5425


Inspección y control de corrosión y
CARLOS reempaqur de la grasa a los ejes
6-Dec RENTERIA UH-1HII EJC5425 impulsores del rotor de cola

YESID
GUZMAN Sé trabajó en la desmilitarisación de
7-Dec PEREZ UH-1N EJC4209 la aeronave.

Linea de vuelo ejc 5437


Inspeccion pmd
Se removieron tail pipe y. Cubiertas
del motor por reporte piloto
JAIRO Se removieron pared de fuego y
QUIROZ pipa. De
RODRIGUE Exosto
7-Dec Z UH-1HII EJC5437 Continua..

Limpieza cabina de pilotos y de


carga, instalación cinturones de
ANDRES F seguridad pasajeros, limpieza
CARDONA burbujas, instalación montantes
7-Dec RAMIREZ UH-1HII EJC5411 ametralladoras

STIVENS Control corrosión y desarme de la


ARCOS barra estabilizadora. Desensamble
HERNÁNDE del plato dinámico y estático,
7-Dec Z UH-1N EJC4212 limpieza y control corrosión.
ELMER
JAVIER
VILLAMIZA Inspección 100 horas
7-Dec R UH-1N EJC4207

Control
corrosión
tailboom,
compartimie
nto de la
bodega,
LEONEL lubrica ion
7-Dec RIVAS UH-1HII EJC5425 Co hanguers,
EDUARDO Inspección de 100 horas instalacion
SANTOS de equipos de trackin al rotor de
7-Dec BONILLA UH-1N EJC4207 cola Remoccion

Se completo control corrosion Barra


estabilizadora y desensamble para
GUILLERM pintar. Aplicacion de adoline. Se
O LEON desensamblo conjunto del plato y
CHALACAM gimbal ring para remplazar pernos
7-Dec A UH-1N EJC4212 rotativos.

Inspección sistema de pedales


tubos de control bastón cíclico
colectivo brazos del
limpiaparabrisas parte delantera de
la estructura puertas de tripulación y
ALDEMAR carga por rajaduras fracturas
AYALA roturas y corrosión limpieza y de pintura e
7-Dec CASTILLO UH-1HII EJC5425 pintura insumos

Fase 200 hrs

- instalación crosshead
- reglaje de los pedales
- llenado de las formas 2408-13-1 y
2408-13-2
CARLOS
ANDRES Limpieza y transporte motor de
MARTINEZ HUEY al almacén de
7-Dec CARDONA UH-1N EJC4212 abastecimientos bell

Limpieza, inspección y reparación


de álabes de la primera etapa del
HERMES compresor del motor #2 del
7-Dec ZAPATA UH-1N EJC4212 helicóptero EJC 4212
JUAN seguimos con inspeccion repack y
CARLOS se efectuo cambio de hanger por
7-Dec PINZÓN UH-1HII EJC5425 alta corrosion
JOSE LUIS EJC5425 07-Diciembre. Inventario
7-Dec ESCOBAR UH-1HII EJC5425 Aeronave.
Instalación malla compresor motor
No 2

Inspección limpieza y regulación


idol stop motor No 1 y No 2

Inspección limpieza y chequeo


rigging gobernador motor No 1 y No
2

Inspección limpieza y chequeo por


fugas unidad control de combustible
motor No 1 y No 2
DAVID
CASTAÑO Limpieza y control corrosión pared
7-Dec GARAY UH-1N EJC4212 de fuego trasera

Inspección de 100 Horas EJC4207


Inspección de risa de la transmisión
Lavado de compresores.
Inspección filtro P3 de los dos
motores, remoción e instalación.
CARLOS Toma de balance a rotor de cola.
7-Dec RENTERIA UH-1N EJC4207

- Se inspeccionó, se efectuó
limpieza, tratamiento anticorrosivo
por hongos, se cambiaron
empaques, se instaló cinta
antifricción a las puertas de acceso
de los compartimientos
eléctricos en el lado izquierdo,
PEDRO compartimiento del servo del rotor
JOSE de cola y válvula del
RICARDO sistema de calefacción (6EA)
7-Dec BARRERO UH-1HII EJC5411
ARGEMIRO
PEREZ Se removió equipo vibres y se
7-Dec ZAPATA UH-1N EJC4224 hicieron ajustes al motor # 2

- inspection phase 200 hrs


* installed cover vertical fin
* installed cover position light
tailboom
WALTER * delivery works for installed
MEJIA bellcrancks gearbox 42° and 90°
7/12 AGUDELO UH-1N EJC4212 control tube flights
WALTER
MEJIA
7-Dec AGUDELO UH-1HII EJC5410 - delivery engine to shop CLAVE
LUIS
CARLOS Instalación acoples flexible hanger
PAHUANA ejes alineación ejes impulsores del
7-Dec FRANCO UH-1HII EJC5425 rotor de cola .. EJC 5425

LUIS
FERNANDO Control corrosión cabina, instalación
MONTILLA paneles del pulmón, remplazo tubo
7-Dec SOSA UH-1HII EJC5411 de aceite del oil cooler
ANDRES F Documentación 2408-13-1 y 2408-
CARDONA 13-2 , elaboración del inventario
7-Dec RAMIREZ UH-1HII EJC5411 general de la aeronave

Reglaje cuerno elevadores


WILLIAM sincronizados
CUERVO Inspección tubos de control tail
HERNANDE boom
7-Dec Z UH-1N EJC4212 Inspección estructural tail boom

Inspección tratamiento de corrosión


inspección de roturas rajaduras
abolladuras de paneles
estructurales montantes sillas
pasajeros y carga ganchos de
ALDEMAR anclaje puedes de trasmisión y
AYALA carga por corrosión pintura y
7-Dec CASTILLO UH-1HII EJC5425 limpieza techo de la cabina

MANUEL Inspección fase de 300 horas,


ANTONIO inspección 100 por ciento, adelantar
10-Nov PATIÑO UH-1HII EJC5411 documentación
RAFAEL Ajustes de mínimas de los motores,
AVELLA N1, N2 y ajuste de resortaje de los Pernos de solenoide de mí
7-Dec PATIÑO UH-1N EJC4212 aceleradores.
YESID
GUZMAN Sé trabajó en la desmilitarisación de
10-Dec PEREZ UH-1N EJC4209 la aeronave.
ANDRES F
CARDONA Correcciones anotaciones 100%
10-Dec RAMIREZ UH-1HII EJC5411
FERNANDO
PLATA Inspección de arnés de pilotos
10-Dec NUÑEZ UH-1N EJC4212 armado barra estabilizadora
ARGEMIRO Ajustes sistema N1 y Cushsion
PEREZ motor #2 y ajustes leva
10-Dec ZAPATA UH-1N EJC4224 compensadores sistema N2

terminacion total y entrega de


documentacion de inspeccion
JUAN numero 14 repack..
CARLOS control corrosion del lado izquierdo
10-Dec PINZÓN UH-1HII EJC5425 del motor
EDGAR
CASTILLO Limpieza e inspeccion corrosion
10-Dec RUIZ UH-1N EJC4212 compartimiento de la transmision
JOSE Trabajos inspección de 100 horas,
AMADEO control corrocion y remplazo pernos
10-Dec SANCHEZ UH-1HII EJC5433 rotativos

WILLIAM Engrase main drive shaft


CUERVO Inspección motor 1 filtro p3
HERNANDE Inspección motor 2 filtro p3
10-Dec Z UH-1N EJC4212

Caza fallas en línea de vuelo y


reglajes de los motores debido a la
HERMES caída de N2 a 96 % y 85% de
10-Dec ZAPATA UH-1N EJC4224 torque del helicóptero EJC 4224.
ELMER
JAVIER
VILLAMIZA Inspección de 100 horas, control
10-Dec R UH-1HII EJC5433 corrosión por 90 dias
LEONEL Repack, control corrosión turbina,
10-Dec RIVAS UH-1HII EJC5425 instalación tapas de inspección

® 10 diciembre 2021
® Línea de vuelo EJC 4224
® Cumplimiento de reportes
® Regulación del couchon
RUBEN acelarador motor nro 2
ANTONIO ® Regulación del sistema de N2
10-Dec URUETA UH-1N EJC4224 ® PMD

LUIS
FERNANDO Inspección fase de 300 horas,
MONTILLA inspección y chequeo del 100 por
10-Dec SOSA UH-1HII EJC5411 ciento de la aeronave

Inspección control corrosión EJC


LUIS 5425
CARLOS Completado lubricación acoples
PAHUANA flexible de los ejes impulsores del
10-Dec FRANCO UH-1HII EJC5425 rotor de cola ..

Reinstalación del tubo transversal a


los tubos longitudinal izquierdo y
derecho del tren de aterrizaje,
STIVENS aplicación de sellante. Reinstalación
ARCOS de la barra estabilizadora en
HERNÁNDE proceso, control corrosión a las
10-Dec Z UH-1N EJC4212 balineras de la barra estabilizadora.
Permiso por Cirugia de
colecistectomia por laparoscopia
GUILLERM que se practicara a mi esposa en el
O LEON Hospital Militar Central Bogota, lo
CHALACAM cual requerie de un acompañante
10-Dec A OTROS durante El procedimiento quirurgico.

Instalación filtro P3 reemplazo


packing motor No 1

Instalación filtro P3 reemplazo


packing motor No 2

Inspección cubierta superior entrada


aire motor No 2
DAVID
CASTAÑO Llenado de formas libro loogbook y
10-Dec GARAY UH-1N EJC4212 libro de fase

Inspección, fase de 300 HRS,


control corrosión, remosion,
Inspección e instalación de paneles
ALDEMAR del piso, chequeo y reglaje tubos de
AYALA control colectivo, chequeo reglaje
10-Dec CASTILLO UH-1HII EJC5425 del cíclico.

PEDRO
JOSE
RICARDO - Corrección reportes inspección
10/12 BARRERO UH-1HII EJC5411 post fase 100%.

Desensamble y mantenimiento de
RAFAEL las balineras del gimbal ring.
AVELLA Ensamble del conjunto de la barra
10-Dec PATIÑO UH-1N EJC4212 estabilizadora.
EDUARDO
SANTOS Tractado del hangar a la línea de
10-Dec BONILLA UH-1HII EJC5433 vuelo para lavado de conpressor

Fase 200 hrs


- entrega de trabajos realizados al
inspector
CARLOS
ANDRES - se realizó repack al Eje Principal
MARTINEZ para helicóptero que se encuentra
10-Dec CARDONA UH-1N EJC4212 en el área de operaciones

- inspection phase 200 hrs


* applied PRC cover flight position
WALTER tailboom
MEJIA -* installed cover down tailboom 50
10/12 AGUDELO UH-1N EJC4212 %
WALTER
MEJIA
10-Dec AGUDELO UH-1N EJC4200 - repack Main drive shaft

EJC5433
Remoción e instalación de pernos
rotatorios que faltaban.
Traslado de la.aeronave para la
linea de vuelo.
CARLOS Preparación para lavado de
10-Dec RENTERIA UH-1HII EJC5433 compressor

JAIRO Linea de vuelo ejc 5437


QUIROZ Remocion e instalacion starter
RODRIGUE generador del motor por
10-Dec Z UH-1HII EJC5437 Cambio
EJC5425 10- Diciembre.
JOSE LUIS Diligenciamiento formas 2408-13-1
10-Dec ESCOBAR UH-1HII EJC5425 y 2408-13-2.

Cazafallas, reparación y chequeo


GERARDO funcional luz anti colisión.
CRUZ Cazafallas, reparación y chequeo
SALAMANC funcional extensiones de ICS
1-Dec A UH-1HII EJC5418 tripulantes.
LUIS
FELIPE Caza fallas al sistema de
1-Dec PARRA UH-1HII EJC5411 calefacción de la aeronave.

Cambio switch del receptáculo de la


planta externa.
Remoción del receptáculo de la
LUIS planta externa e instalación del
FELIPE mismo.
1-Dec PARRA UH-1N EJC4224

Instalación generador principal


CAMILO Instalación generador arrancador
GALLEGO Documentación formato 2408-13 -1
1-Dec TORRES UH-1HII EJC5411 y 2408-13-2

Cazafallas sistema indicación


GERARDO presión aceite XMSN.
CRUZ Remoción, reemplazo y chequeo
SALAMANC funcional transmisor presión aceite
2-Dec A UH-1HII EJC5415 XMSN.

GERARDO
CRUZ Remoción batería de aeronave.
SALAMANC Remoción y limpieza componentes
2-Dec A UH-1HII EJC5425 pedestal central.
LUIS Diligenciamiento formas 2408-13-1
FELIPE Diligenciamiento formas 2408-13-2
2-Dec PARRA UH-1HII EJC5411
Caza fallas sistema de calefacción
Reparación arnés eléctrico sistema
CAMILO radio altimetro
GALLEGO Caza fallas gps y cambio de
2-Dec TORRES UH-1HII EJC5411 Antena. Gps

Remoción, inspección y limpieza


GNS 430. Piloto y copiloto.
Remoción,inspección y limpieza
transponder.
GERARDO Remoción,inspección y limpieza
CRUZ ADF KR87.
SALAMANC Remoción,inspección y limpieza
3-Dec A UH-1HII EJC5425 cajas control ICS piloto y copiloto.
LUIS
FELIPE Remoción equipo SKY conect de la
3-Dec PARRA UH-1HII EJC5427 aeronave según O/I 112
CAMILO Corrección reportes 100%
GALLEGO Documentación formato 2408-13-1
3-Dec TORRES UH-1HII EJC5411 y 2508-13-2

Inspección y limpieza
compartimiento de batería.
Inspección y limpieza sistema radio
UHF.
GERARDO Inspección y limpieza Giroscopo
CRUZ Direccional.
SALAMANC Inspección y limpieza sistema radar
6-Dec A UH-1HII EJC5425 altimetro

Inspección, limpieza y adecuación


LUIS del arnés principal del motor.
FELIPE Cambio de amarres del arnés del
6-Dec PARRA UH-1HII EJC5425 motor.

Reparación e instalación adaptador


de fase lado piloto
Inspección y prueba funcional
indicador de actitud lado piloto
Reemplazó switch luz de la
CAMILO transmisión
GALLEGO Reparación cables de antenas
6-Dec TORRES UH-1HII EJC5411 sistema radio altimetro

LUIS
FELIPE Inspección, limpieza y adecuación
7-Dec PARRA UH-1HII EJC5425 arnés electrico de motor.
Instalación y prueba funcional
indicador rmi copiloto
Reemplazó bombillos luces de
fuselaje
Reparación e instalación
CAMILO extensiones ics tripulantes
GALLEGO Documentación formato 2308-13-1
7-Dec TORRES UH-1HII EJC5411 y 2408-13-2

GERARDO Inspección y limpieza sistema ELT.


CRUZ Inspección y limpieza sistema radar
SALAMANC altímetro KRA405B.
7-Dec A UH-1HII EJC5425 Inspección y limpieza sistema ICS.
LUIS
FELIPE
10-Dec PARRA UH-1HII EJC5427 Inventario general de la aeronave.
CAMILO Corrección reportes 100%
GALLEGO Documentación formato 2408-13-1
10-Dec TORRES UH-1HII EJC5411 y 2308-13-1

Inspección y limpieza sistema radio


UHF.
GERARDO Reparación y chequeo funcional
CRUZ Foot switch tripulante izquierdo.
SALAMANC Inspección y limpieza panel control
10-Dec A UH-1HII EJC5425 de motor.

Instalación batería principal


Instalación y prueba funcional radar
CAMILO meteorológico
GALLEGO Documentación formato 2408-13-1
10-Dec TORRES UH-1N EJC4213 y 2408-13-2
HH

emolque del EJC 4216 y 54


8
8

FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
8

8
8

8
8

FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
8

8
8

8
8

8
5

8
FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
FALTANTE
S 8

HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
8

JC5425 06-Diciembre. Reem


8

FALTANTE
S 8

FALTANTE
S 8

8
8

HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
8

2
FALTANTE
S 8

FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

ernos de solenoide de mí
8

8
8

HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

8
8

FALTANTE
S,
HERRAMIE
NTAS
ESPECIALE
S (Grua,
Equipo
NDT, Banco
Pitostatico,
en otros) 8

4
4

8
8

8
8

4
Sé trabajó
en la
YESID desmilitarisa
GUZMAN ción de la
1-Dec PEREZ UH-1N EJC4209 aeronave. 8

Control
corrosión
sistema de
controles de
vuelo,
instalación
de botas
cíclicos,
ANDRES F chequeo
CARDONA Rigg
1-Dec RAMIREZ UH-1HII EJC5411 pedales. 8

Taller de
motores.
Remoción,
limpieza e
inspección
de la válvula
divisora de
flujo del
motor T-53
L-703 S/N
LE-12629Z
para casa
fallas en la
línea de
vuelo del
HERMES helicóptero
1-Dec ZAPATA OTROS EJC 5437. 8
Impieza
inspección y
control
corrosión de
las zapatas
del tren de
aterrizaje,
limpieza
inspección y
control
corrosión de
los tubos
transversale
sy
longitudinale
s del tren de
aterrizaje,
aplicación
de primer a
las zapatas
y al tren de
aterrizaje,
reinstalación
de las
zapatas al
tren de
aterrizaje.
Remoción
del rotor
principal y
STIVENS remoción
ARCOS del plato
HERNÁNDE dinámico y
1-Dec Z UH-1N EJC4212 estático. 8

Instalación
palas del
rotor
principal,
balanceo,
alineación,
LEONEL tratamiento
1-Dec RIVAS UH-1HII EJC5425 anticorrosivo 8
Instalación
cubierta
vertical fin,
instalación
cubierta Tail
skid,
instalación
cubierta y
luces del
LUIS tailboom
FERNANDO control
MONTILLA corrosión
1-Dec SOSA UH-1HII EJC5411 Tail boom 8

Remoción
rotor
principal.
Remoción
conjunto del
plato
dinamico y
manga
colectiva.
Prepracion
Barra
estabilizador
GUILLERM a para
O LEON enviar al
CHALACAM taller de
1-Dec A UH-1N EJC4212 pinturas. 8

Instalaccion
de barra
estabilizador
a inspección
de ductos
de escape
EDUARDO motor y
SANTOS control de
1-Dec BONILLA UH-1HII EJC5425 corrossion 8

Inspección
fase de 300
horas,
Instalación Remolque del EJC 4216 y 54
sillas de los
Pasajeros,
MANUEL acondiciona
ANTONIO miento de la
1-Dec PATIÑO UH-1HII EJC5411 cabina. 8
inspección
limpieza y
reemplazo
packing y
elemento
filtro de
aceite motor
No 1 y
motor No 2

Remoción
reinstalación
inspección
limpieza y
reemplazo
packing y
elemento
filtro de
aceite
Gearbox

Remoción
reinstalación
inspección
limpieza y
reemplazo
packing
metiring tee
motor No 1
y motor No
2

Llenado de
formas libro
DAVID de fase
CASTAÑO 2408-13-2 e
1-Dec GARAY UH-1N EJC4212 ítem fallas 8

Preinstalaci
on e
instalación
de rotor FALTANTE
principal S,
barra HERRAMIE
estabilizador NTAS
a instalación ESPECIALE
de grúa S (Grua,
tratamiento Equipo
ALDEMAR de NDT, Banco
AYALA inspección Pitostatico,
1-Dec CASTILLO UH-1HII EJC5425 de palas . en otros) 8
Se efectuó
PMD y se
removio
pipa de
escape del
motor para
cambiar
ARGEMIRO válvula
PEREZ difusora de
1-Dec ZAPATA UH-1HII EJC5437 combustible 8

Inspección
fase al EJC
5425
Preparación
de bancos y
herramienta
s para
posteriorme
nte
ensamblar
palas al hub
del rotor
principal.
Alineamient
o y balanceo
del rotor
principal
Instalación
del rotor
CARLOS principal a la
1-Dec RENTERIA UH-1HII EJC5425 aeronave 8

Limpieza e
inspeccion.
Corrosion
compartimie
ntos
EDGAR traseros
CASTILLO celdss de
1-Dec RUIZ UH-1N EJC4212 combustible 4

Remosion.
Baston
colectivo
EDGAR para ser
CASTILLO instalado en
1-Dec RUIZ UH-1HII EJC5429 ejc 5436 2

Remosion
rotor
EDGAR principal.
CASTILLO Remosion.
1-Dec RUIZ UH-1N EJC4212 Swachplate 2
Cambio
filtros
motores
Servicio 200
WILLIAM horas
CUERVO Servicio
HERNANDE filtros
1-Dec Z UH-1N EJC4212 hidraulicos 8

EJC5425
01-
Diciembre.
Se efectuó
ensamble
palas del
rotor
principal y
Hub, Se
efectuó
alineamiento
y balance
estático, se
instaló rotor
principal en
la aeronave.
instalación
barra
estabilizador
JOSE LUIS a en
1-Dec ESCOBAR UH-1HII EJC5425 proceso. 8

Corrección
de reportes
en estatus
en /
efectuados
por el
inspector
ELMER por término
JAVIER de fase y
VILLAMIZA armado de
1-Dec R UH-1HII EJC5427 la aeronave. 8
- Se instaló
generador
arrancador
en el motor
- Se instaló
generador
principal en
la
transmisión
- Se aplicó
p.r.c en la
cubierta
izquierda y
derecha de
las luces de
posición de
cola
- Se instaló
p.r.c en la
cubierta del
patín de
cola (care
vaca)
- Se
autorizaron
formatos
2408-13-1 y
2408-13-2
PEDRO en el libro
JOSE del
RICARDO helicóptero.
1/12 BARRERO UH-1HII EJC5411 8

-inspection
phase 200
hrs
- treatment
corrosión
and
treatment
WALTER hongus
MEJIA tailboom
1/12 AGUDELO UH-1N EJC4212 vertical fin 8

se efectuo
todas las
anotaciones
del libro
JUAN 100% por
CARLOS termino final
1-Dec PINZÓN UH-1HII EJC5427 de fase 8
Remocion
de
componente
JORGE s aeronave
ERNEY en
VIANCHA desmilitariza
1-Dec VARGAS UH-1N EJC4202 cion 8

Remoción
rotor
principal,
remoción
plato
giratorio,
FERNANDO control
PLATA corrosión
1-Dec NUÑEZ UH-1N EJC4212 cabina 8

Trabajos de
reparación y
remplazo
JOSE ventana
AMADEO inferior lado
1-Dec SANCHEZ UH-1N EJC4224 piloto 8

Inspección
EJC 5425
instalación
de palas del
rotor
principal. ...
alineación y
balanceo del
rotor
principal ..
LUIS instalación
CARLOS del rotor
PAHUANA principal la
1-Dec FRANCO UH-1HII EJC5425 helicóptero.. 8
Fase 200hrs

- Limpieza
área del
cuerno y
elevadores

EJC 4224

- Instalación
equipo
CARLOS Rads-at
ANDRES para toma
MARTINEZ del rotor
1-Dec CARDONA UH-1N EJC4212 principal 8

Linea de
vuelo ejc
5437
Remocion
tail pipe y
cubiertas del
motor
Remocion
pipa de
exosto
Remocion
pared de
fuego
JAIRO Se efectuo
QUIROZ chequeo
RODRIGUE torque rotor
1-Dec Z UH-1HII EJC5437 principal 8

Sé trabajó
en la
YESID desmilitarisa
GUZMAN ción de la
2-Dec PEREZ UH-1N EJC4209 aeronave. 8

tractado de
los
hangares
ala
plataforma
de linea de
4
helucoptero
JUAN s ejc
CARLOS 4213..4216..
2-Dec PINZÓN UH-1HII EJC5425 .4225...4205 8
Trabajos de
inspección
de filtros de
los motores
y trabajos
de
JOSE inspección
AMADEO de 200
2-Dec SANCHEZ UH-1N EJC4212 horas 8

Caza fallas
por alta
temperatura
en el
encendido
del motor
T53-L-703
del
helicóptero
EJC 5437
en la linea
de vuelo,
elaboracion
HERMES de formas
2-Dec ZAPATA UH-1HII EJC5437 2408-13-2. 8

Inspección
de huecos
fin vertical y
limpieza por
EDUARDO hongos
SANTOS instalaccion
2-Dec BONILLA UH-1HII EJC5425 de cubiertas 8

Instalación
zapatas de
los tubos
longitudinale
s,
verificación
torque de
los soportes
de los tubos
longitudinale
s con los
transversale
s, aplicación
STIVENS de sellante.
ARCOS Limpieza del
HERNÁNDE mástil de la
2-Dec Z UH-1N EJC4212 transmición. 8
Desensambl
e
reservorios
hidraulicos.
Limpieza,
GUILLERM inspeccion.
O LEON Elaboracion
CHALACAM formas
2-Dec A UH-1N EJC4212 2408-13-2. 8

Tractado de
04
aeronaves.
Corrección
de
novedades
en papelería
forma 2408-
13-1 y 24-
08-13-2
encontradas
en el libro
ELMER de vuelo
JAVIER encontrarás
VILLAMIZA por el
2-Dec R UH-1HII EJC5427 inspector 8

Inspección
300 hrs EJC
5425 .
Instalación
barra
estabilizador
a del rotor
principal..
reglajes de
los damper
LUIS de
CARLOS amortiguaci
PAHUANA ón de la
2-Dec FRANCO UH-1HII EJC5425 barra ... 8
Remolque
de
aeronaves
para
plataforma
de vuelo
EJC 4216 FALTANTE
EJC S,
4224,EJC HERRAMIE
4213,EJC Espera en NTAS
5423 SE Celestiales ESPECIALE
REALIZA de rodaje S (Grua,
INSPECCIÓ por orden de Equipo
ALDEMAR N DE seguridad NDT, Banco
AYALA CABINA torre de Pitostatico,
2-Dec CASTILLO UH-1HII EJC5425 GENERAL control en otros) 8

Instalación
paneles del
pulmón
chequeo
inventario
fase 300hrs,
LUIS control
FERNANDO corrosión
MONTILLA sillas de
2-Dec SOSA UH-1HII EJC5411 tropa 8

Chequeo del
inventario
de fase
300hrs,
limpieza
burbujas
poto y
copiloto,
limpieza
windshield y
control
ANDRES F corrosión
CARDONA pedestal
2-Dec RAMIREZ UH-1HII EJC5411 central 8
Inspección
fase al EJC
5425.
Corrección
de
imprevistos
reposiciona
miento de
líneas
hidráulicas y
de aceite y
abrazaderas
en el hueco
de la
transmisión.
Revisión de
libros de
CARLOS inspección y
2-Dec RENTERIA UH-1HII EJC5425 de vuelo. 8

- Se efectuó
limpieza y
control
anticorrosivo
al lado
izquierdo del
techo en la
cabina de
carga y
pasajeros.
- Se efectuó
limpieza y
control
anticorrosivo
PEDRO al techo en
JOSE la cabina de
RICARDO pilotos.
2-Dec BARRERO UH-1HII EJC5411 8

Linea de
vuelo ejc
4207
Remocion e
instalacion
barra
estabilizador
a
JAIRO Por reporte
QUIROZ de
RODRIGUE mantenimie
2-Dec Z UH-1N EJC4207 nto 8
Inspección
tanque
combustible
delanteros
Linpieza
tanques
combustible
derecho
Instalación
bonbas
combustible
Instalación
WILLIAM paneles
CUERVO superior
HERNANDE tamque
2-Dec Z UH-1N EJC4212 combustible 8

EJC5425
02-
Diciembre.
Instalacion
barra
estabilizador
a
completada,
se efectuó
ajuste de los
dampers de
la barra
estabilizador
a
encontrando
se un
damper
contaminad
JOSE LUIS o reemplazo
2-Dec ESCOBAR UH-1HII EJC5425 en proceso. 8

Remoción e
instalación
de la barra
ARGEMIRO estabilizador
PEREZ a formas y
2-Dec ZAPATA UH-1N EJC4207 registro ok 5

Inspección
fase de 300
horas, guía
de control
MANUEL corrosión,
ANTONIO sección de
2-Dec PATIÑO UH-1HII EJC5411 cabina 8
Inspección
fase de 200
horas
control
corrosión
FERNANDO compartimie
PLATA ntos de
2-Dec NUÑEZ UH-1N EJC4212 cabina 8
reemplazo
packing y
elemento
filtro externo
de
combustible
motor No 2

Remoción
reinstalación
inspección
limpieza y
reemplazo
gasket
bujías motor
No 1

Remoción
reinstalación
inspección
limpieza y
reemplazo
gasket
bujías motor
No 2

Remoción
reinstalación
inspección
limpieza
caps PY
control
automático
de
DAVID combustible
CASTAÑO motor No 1
2-Dec GARAY UH-1N EJC4212 y No 2 8

-inspection
phase 200
hrs
* inspection
tailboom
and control
WALTER corrosión
MEJIA and hongus
2/12 AGUDELO UH-1N EJC4212 50% 8
Inspeccion
corrosion
limpieza
compartimie
ntos lineas
de
EDGAR combustible
CASTILLO Controles de
2-Dec RUIZ UH-1N EJC4212 vuelo 8

Tractado
helicopteros
EJC - 4224,
EJC-5416-
EJC-4213
EJC-3212
remosion de
pintura de
liso de la
LEONEL cabina EJC-
2-Dec RIVAS UH-1HII EJC5425 5425 8

Inspección
fase al EJC
5425.
Corrección
de
imprevistos,
reposiciona
miento de
líneas
hidráulicas,d
e aceites y
reposiciona
miento de
abrazaderas
del hueco
de la
transmisión.
Revisión de
libros de
vuelo, para
preparar la
CARLOS finalización
2-Dec RENTERIA UH-1HII EJC5425 de la fase. 8
Fase 200
hrs

- limpieza y
inspección
de los
elevadores
Aplicación
de
lubricante
seco
-
desconexión
de la
preinstalació
n de los
servos
cíclicos
derecho y
izquierdo
- limpieza y
preservació
n de los
CARLOS servos para
ANDRES ser
MARTINEZ entregados
2-Dec CARDONA UH-1N EJC4212 ao almacén 8

Se
efectuaron
ajustes en el
rotor
principal
auto
rotaciones
bajas
formas y
registro en
formas
ARGEMIRO 2408-13-2
PEREZ y2408-13-1
2-Dec ZAPATA UH-1HII EJC5437 actualizadas 3

Inspección
fase de 300
horas, guía
de control
MANUEL corrosión
ANTONIO sección de
3-Dec PATIÑO UH-1HII EJC5411 cola. 8
Sé trabajó
en la
YESID desmilitarisa
GUZMAN ción de la
3-Dec PEREZ UH-1N EJC4209 aeronave. 8

Remocion
de
componente
JORGE s aeronave
ERNEY en
VIANCHA desmilitariza
3-Dec VARGAS UH-1N EJC4202 cion 8

Taller de
motores.
Desensambl
e, limpieza,
inspección y
mantenimie
nto de 02
actuadores
de banda de
sangrado de
HERMES los motores
3-Dec ZAPATA OTROS T53-L-703 8

Trabajos de
corrección
de reportes
JOSE por termino
AMADEO de fase de
3-Dec SANCHEZ UH-1HII EJC5411 300 horas 8

Inspección
de 200
horas
instalación
de paneles y
FERNANDO reglaje
PLATA control
3-Dec NUÑEZ UH-1N EJC4212 cíclico 8
Se completó
balance
dinámico al
rotor de cola
y se removio
equipo y se
instalo en el
rotor
principal
para
chequear.
Tracking y
balance
ajusten de
N2 motor 1
ARGEMIRO y motor 2
PEREZ formas y
3-Dec ZAPATA UH-1N EJC4224 registro ok 8

Inspeccion y
control
corrosion
varillaje
controles de
vuelo area
GUILLERM de la cabina.
O LEON Chequeo de
CHALACAM cushion en
3-Dec A UH-1N EJC4212 proceso. 8

- Corrección
de reportes
de pre
inspección
100 %
- Ajuste de
la varilla de
control de
los Damper
PEDRO de la barra
JOSE estabilizador
RICARDO a.
3-Dec BARRERO UH-1HII EJC5411 8

Limpieza de
STIVENS la
ARCOS transmición
HERNÁNDE y mástil en
3-Dec Z UH-1N EJC4212 proceso. 8
se efectuo
control
corrosion
alas
cubiertas
laterares 2
del motor y
la cubierta
superior .
con pintado
de las
mismas

control
corrosion
instalacion
de letreros
del lado
JUAN derecho del
CARLOS motor y
3-Dec PINZÓN UH-1HII EJC5425 plataforma 8

Inspección
fase al EJC
5425.
Corrección
de
imprevistos
encontrados
en la
inspección
fase.
Ejecución
libros de
vuelo,
CARLOS formas
3-Dec RENTERIA UH-1HII EJC5425 2408-13-2 8

Desistalacio
n rotor
principal
Desistalacio
n plato de
WILLIAM control
CUERVO Servicio
HERNANDE fase a la
3-Dec Z UH-1N EJC4212 transmisión 8
Linea de
vuelo ejc
5437
Se efectuo
inspeccion
pmd
Se efectuo
ajuste al
control
collectivo
por reporte
piloto
Se efectuo
inspeccion
de 25 horas
a la
aeronave
lubricacion
general y
lavado de
JAIRO palas del
QUIROZ rotor
RODRIGUE principal y
3-Dec Z UH-1HII EJC5437 rotor de cola 8

Inspeccion
limpieza
EDGAR compartimie
CASTILLO ntos cabina
3-Dec RUIZ UH-1N EJC4212 generales 5

Carreteo
aeronaves.
En
plataforma
EDGAR de
CASTILLO mantenimie
3-Dec RUIZ UH-1HII EJC5433 nto 3
No 1

Remoción
inspeccion y
limpieza
filtros P3
motor No 1
y No 2

Remoción
toma aire de
sangrado
motor No 1
y No 2

Inspección y
limpieza
control de
combustible
motor No 1
y No 2

Inspección y
limpieza
housing de
los
generadores
motor No 1
y No 2

Tractado
aeronaves
EJC 4213 y
EJC 5433
DAVID desde la
CASTAÑO plataforma
3-Dec GARAY UH-1N EJC4212 al hangar 8

Corrección
de reportes
en estatus
en /
ELMER efectuados
JAVIER por el QC en
VILLAMIZA inspección
3-Dec R UH-1HII EJC5427 de 100 % 8

Fase 200
hrs

- limpieza y
inspección
CARLOS remoción de
ANDRES hongos
MARTINEZ tailboom
3-Dec CARDONA UH-1N EJC4212 parte interna 8
EJC5425
03-
Diciembre.C
ontrol
corrosion y
aplicación
primer
pernos que
aseguran la
XMSN.
Reemplazo
de un
damper de
la barra
estabilizador
a en
proceso.
EJC4205
JOSE LUIS Remoción
3-Dec ESCOBAR UH-1HII EJC5425 elevadores. 8

Remocion
de
componente
JORGE s aeronave
ERNEY en
VIANCHA desmilitariza
3-Dec VARGAS UH-1N EJC4209 cion 8

Servicio de
aceite a la
transmisión
con royco
555
inspección
huecos
EDUARDO tailboom
SANTOS instalación
3-Dec BONILLA UH-1HII EJC5425 cubiertas 8

Inspección
de pisos
remoción de
bellcro FALTANTE
remplazo S,
instalación HERRAMIE
de cinta NTAS
negra ESPECIALE
bellcro para S (Grua,
instalación Equipo
ALDEMAR de blindaje NDT, Banco
AYALA corrosión y Pitostatico,
3-Dec CASTILLO UH-1HII EJC5425 pintura en otros) 8
* inspection
phase 200
hrs
- inspection
and
treatment
corrosion
tailboom
90%
- clean and
WALTER treatment
MEJIA hongus
3-Dec AGUDELO UH-1N EJC4212 100% 8

Sé trabajó
en la
YESID desmilitarisa
GUZMAN ción de la
6-Dec PEREZ UH-1N EJC4209 aeronave. 8
ANDRES F
CARDONA Inventario
6-Dec RAMIREZ UH-1HII EJC5411 aeronave 8

Taller de
motores.
Ensamble
de 02
actuadores
de la banda
de sangrado
de los
motores T-
53 L-703
S/N X6-105
y S/N X1-55.
lavado de
filtros de
aire P3 de
los motores
T400 CP400
con
ultrasonido y
elaboración
HERMES de tarjetas
6-Dec ZAPATA OTROS amarillas. 8
Trabajos de
inspección
de fase de
JOSE 300 horas,
AMADEO inspección
6-Dec SANCHEZ UH-1HII EJC5425 repack 8
- Se efectuó
limpieza al
compartimie
nto inferior
de los
pedales de
piloto y
copiloto
- Se
instalaron
cubiertas de
acceso a la
parte interna
del tail boom
en la parte
inferior
- Se instaló
tapa del
hueco del
diablo
removida
por
remplazo
del tubo de
presión de
aceite
de la
transmisión
- Se le
diligenciaron
formatos
2408-13-1 y
2408-13-2
PEDRO en el libro
JOSE del
RICARDO helicóptero.
6/12 BARRERO UH-1HII EJC5411 8
Inspección
de la
transmisión
remplazo de
abrazaderas
Inspección
de líneas
por roturas
desgaste FALTANTE
obstrucción S,
y corrosión HERRAMIE
inspección NTAS
por goteras ESPECIALE
y escapes S (Grua,
en líneas de Equipo
ALDEMAR Hidráulico NDT, Banco
AYALA aceite Pitostatico,
6-Dec CASTILLO UH-1HII EJC5425 combustible en otros) 8

Control
corrosión de
la barra
estabilizador
a, remoción
STIVENS del tubo
ARCOS delantero
HERNÁNDE del tren de
6-Dec Z UH-1N EJC4212 aterrizaje. 8

Repack
hanguers,
caja de 42
grados caja
de 90
grados, quill
de salida de
la
transmisión,
LEONEL inspección
6-Dec RIVAS UH-1HII EJC5425 de ejes 8

Limpieza,
inspección y
control
corrosión de
los motores,
caja
combinada,
paredes de
RAFAEL fuego y deck
AVELLA del motor
6-Dec PATIÑO UH-1N EJC4212 8
Control
corrosion.
Barra
estabilizador
a para
pintar.
Inspeccion y
limpieza
palas rotor
GUILLERM principal.
O LEON Inspeccion y
CHALACAM limpieza silla
6-Dec A UH-1N EJC4212 copiloto. 8
ELMER
JAVIER Inicio de
VILLAMIZA inspección
6-Nov R UH-1HII EJC5425 repack 8
inspección y
reinstalación
mala
compresor
motor No 1

Inspección
limpieza
control
corrosión
alabes del
compresor
motor No 1

Remoción
inspección y
limpieza
malla
compresor
motor No 2

Inspección
limpieza y
control
corrosión
alabes
compresor
motor No 2

Remoción
reinstalación
reemplazo
gasket toma
DAVID blee air
CASTAÑO motor No 1
6-Dec GARAY UH-1N EJC4212 y No 2 8
Inspeccion y
limpieza
palas y hub
rotor
principal.
Tratamiento
corrosion
Barra
estabilizador
a para
pintar.
Inspeccion y
GUILLERM limpieza silla
O LEON copiloto y
CHALACAM remoción FALTANTE
6-Dec A UH-1N EJC4212 del frame S 8

Se continúa
con las
pruebas y
ajustes al
rotor
ARGEMIRO principal y
PEREZ ajuste del
6-Dec ZAPATA UH-1N EJC4224 motor #2 8

- inspection
phase 200
hrs
* inspection
and
treatment
hongus
tailboom
100 %
completed
* installed
bellcranck of
flight control
control tube
of gearbox
90°
* installed
bellcranck of
flight control
WALTER tube of
MEJIA intermediate
6/12 AGUDELO UH-1N EJC4212 gearbox 42° 8
Remocion
de
componente
JORGE s aeronave
ERNEY en
VIANCHA desmilitariza
6-Dec VARGAS UH-1N EJC4209 cion 8

Inspección
repack
EDUARDO hangers
SANTOS cuoplings
6-Dec BONILLA UH-1HII EJC5425 cajas 42 y90 8

Inspección
pernos del
bipode y
trípode del
motor ...
Inspección y
lubricación HERRAMIE
de los NTAS
acoples ESPECIALE
flexible ejes S (Grua,
LUIS impulsores Equipo
CARLOS del rotor de NDT, Banco
PAHUANA cola .. EJC Pitostatico,
6-Dec FRANCO UH-1HII EJC5425 5425 en otros) 8
JUAN iniciamos
CARLOS inspeccion
6-Dec PINZÓN UH-1HII EJC5425 repack 8

Inspeccion
corrosion y
remosion
pintura
tubos de
soportes
conjunto de
sillas
pasajeros
EDGAR Lavado de
CASTILLO sillas
6-Dec RUIZ UH-1N EJC4212 pasajeros 8

Inspección
fase de 200
horas
FERNANDO inspección
PLATA sillas de
6-Dec NUÑEZ UH-1N EJC4212 pilotos 8
Reenplazo
bellcram
control rotor
de cola
Instalación
rotor de cola
Torqueo
tuerca rotor
WILLIAM de cola
CUERVO Linpieza
HERNANDE compresor
6-Dec Z UH-1N EJC4212 motor 1 y 2 8

Fase 200
hrs

- ensamble
de
contrapezas
de la
crosshead
- reemplazo
de link's
2EA rotor de
cola
CARLOS - limpieza
ANDRES interna
MARTINEZ tailboom al
6-Dec CARDONA UH-1N EJC4212 100% 8

Linea de
vuelo ejc
4224
Se efectuo
inspeccion
pmd
Se
efectuaron
correcciones
de tracking
and balance
al rotor
JAIRO principal
QUIROZ brazo de
RODRIGUE arrastre.
6-Dec Z UH-1N EJC4224 Continua... 8
EJC5425
JOSE LUIS 06- EJC5425 06-Diciembre. Reem
6-Dec ESCOBAR UH-1HII EJC5425 Diciembre 8
Inspección
lubricación
engarce
acoples
LUIS flexible..
CARLOS ejes del
PAHUANA rotor de cola Pendiente FALTANTE
6-Dec FRANCO UH-1HII EJC5425 .. EJC 5425 repuestos S 8

LUIS
FERNANDO Corrección
MONTILLA reportes
6-Dec SOSA UH-1HII EJC5411 100% 8

Inspección
fase al EJC
5425
Inspección y
control de
corrosión y
reempaqur
de la grasa
a los ejes
impulsores
CARLOS del rotor de FALTANTE
6-Dec RENTERIA UH-1HII EJC5425 cola S 8

Sé trabajó
en la
YESID desmilitarisa
GUZMAN ción de la
7-Dec PEREZ UH-1N EJC4209 aeronave. 8

Linea de
vuelo ejc
5437
Inspeccion
pmd
Se
removieron
tail pipe y.
Cubiertas
del motor
por reporte
piloto
Se
removieron
pared de
JAIRO fuego y
QUIROZ pipa. De
RODRIGUE Exosto
7-Dec Z UH-1HII EJC5437 Continua.. 8
Limpieza
cabina de
pilotos y de
carga,
instalación
cinturones
de
seguridad
pasajeros,
limpieza
burbujas,
instalación
ANDRES F montantes
CARDONA ametrallador
7-Dec RAMIREZ UH-1HII EJC5411 as 8

Control
corrosión y
desarme de
la barra
estabilizador
a.
Desensambl
e del plato
dinámico y
STIVENS estático,
ARCOS limpieza y
HERNÁNDE control
7-Dec Z UH-1N EJC4212 corrosión. 8
ELMER
JAVIER Inspección
VILLAMIZA 100 horas
7-Dec R UH-1N EJC4207 8

Control HERRAMIE
corrosión NTAS
tailboom, ESPECIALE
compartimie S (Grua,
nto de la Equipo
bodega, NDT, Banco
LEONEL lubrica ion Pitostatico,
7-Dec RIVAS UH-1HII EJC5425 Co hanguers, en otros) 8

Inspección
de 100
horas
instalacion
de equipos
EDUARDO de trackin al
SANTOS rotor de cola
7-Dec BONILLA UH-1N EJC4207 Remoccion 8
Se completo
control
corrosion
Barra
estabilizador
ay
desensambl
e para
pintar.
Aplicacion
de adoline.
Se
desensambl
o conjunto
del plato y
gimbal ring
GUILLERM para
O LEON remplazar
CHALACAM pernos
7-Dec A UH-1N EJC4212 rotativos. 8

Inspección
sistema de
pedales
tubos de
control
bastón
cíclico
colectivo
brazos del
limpiaparabr
isas parte
delantera de
la estructura FALTANTE
puertas de S,
tripulación y HERRAMIE
carga por NTAS
rajaduras ESPECIALE
fracturas S (Grua,
roturas y Equipo
ALDEMAR corrosión NDT, Banco
AYALA limpieza y de pintura e Pitostatico,
7-Dec CASTILLO UH-1HII EJC5425 pintura insumos en otros) 8
Fase 200
hrs

- instalación
crosshead
- reglaje de
los pedales
- llenado de
las formas
2408-13-1 y
2408-13-2

Limpieza y
transporte
motor de
CARLOS HUEY al
ANDRES almacén de
MARTINEZ abastecimie
7-Dec CARDONA UH-1N EJC4212 ntos bell 8

Limpieza,
inspección y
reparación
de álabes
de la
primera
etapa del
compresor
del motor #2
del
HERMES helicóptero
7-Dec ZAPATA UH-1N EJC4212 EJC 4212 8

seguimos
con
inspeccion
repack y se
efectuo
cambio de
JUAN hanger por
CARLOS alta
7-Dec PINZÓN UH-1HII EJC5425 corrosion 8

EJC5425
07-
Diciembre.
JOSE LUIS Inventario
7-Dec ESCOBAR UH-1HII EJC5425 Aeronave. 8
Instalación
malla
compresor
motor No 2

Inspección
limpieza y
regulación
idol stop
motor No 1
y No 2

Inspección
limpieza y
chequeo
rigging
gobernador
motor No 1
y No 2

Inspección
limpieza y
chequeo por
fugas
unidad
control de
combustible
motor No 1
y No 2

Limpieza y
control
corrosión
DAVID pared de
CASTAÑO fuego
7-Dec GARAY UH-1N EJC4212 trasera 8
Inspección
de 100
Horas
EJC4207
Inspección
de risa de la
transmisión
Lavado de
compresore
s.
Inspección
filtro P3 de
los dos
motores,
remoción e
instalación.
Toma de
balance a
rotor de
CARLOS cola.
7-Dec RENTERIA UH-1N EJC4207 8
- Se
inspeccionó,
se efectuó
limpieza,
tratamiento
anticorrosivo
por hongos,
se
cambiaron
empaques,
se instaló
cinta
antifricción a
las puertas
de acceso
de los
compartimie
ntos
eléctricos en
el lado
izquierdo,
compartimie
nto del
servo del
rotor de cola
y válvula del
PEDRO sistema de
JOSE calefacción
RICARDO (6EA)
7-Dec BARRERO UH-1HII EJC5411 8

Se removió
equipo
vibres y se
ARGEMIRO hicieron
PEREZ ajustes al
7-Dec ZAPATA UH-1N EJC4224 motor # 2 8
- inspection
phase 200
hrs
* installed
cover
vertical fin
* installed
cover
position light
tailboom
* delivery
works for
installed
bellcrancks
gearbox 42°
WALTER and 90°
MEJIA control tube
7/12 AGUDELO UH-1N EJC4212 flights 6
- delivery
WALTER engine to
MEJIA shop
7-Dec AGUDELO UH-1HII EJC5410 CLAVE 2

Instalación
acoples
flexible
hanger ejes
alineación
ejes
LUIS impulsores
CARLOS del rotor de
PAHUANA cola .. EJC FALTANTE
7-Dec FRANCO UH-1HII EJC5425 5425 S 8

Control
corrosión
cabina,
instalación
paneles del
pulmón,
LUIS remplazo
FERNANDO tubo de
MONTILLA aceite del oil
7-Dec SOSA UH-1HII EJC5411 cooler 8

Documentac
ión 2408-13-
1 y 2408-13-
2,
elaboración
del
ANDRES F inventario
CARDONA general de
7-Dec RAMIREZ UH-1HII EJC5411 la aeronave 8
Reglaje
cuerno
elevadores
sincronizado
s
Inspección
tubos de
control tail
WILLIAM boom
CUERVO Inspección
HERNANDE estructural
7-Dec Z UH-1N EJC4212 tail boom 8

Inspección
tratamiento
de corrosión
inspección
de roturas
rajaduras
abolladuras
de paneles
estructurale
s montantes
sillas
pasajeros y
carga
ganchos de FALTANTE
anclaje S,
puedes de HERRAMIE
trasmisión y NTAS
carga por ESPECIALE
corrosión S (Grua,
pintura y Equipo
ALDEMAR limpieza NDT, Banco
AYALA techo de la Pitostatico,
7-Dec CASTILLO UH-1HII EJC5425 cabina en otros) 8

Inspección
fase de 300
horas,
inspección
100 por
ciento,
MANUEL adelantar
ANTONIO documentaci
10-Nov PATIÑO UH-1HII EJC5411 ón 8
Ajustes de
mínimas de
los motores,
N1, N2 y Pernos de solenoide de mí
ajuste de
resortaje de
RAFAEL los
AVELLA aceleradore
7-Dec PATIÑO UH-1N EJC4212 s. 8

Sé trabajó
en la
YESID desmilitarisa
GUZMAN ción de la
10-Dec PEREZ UH-1N EJC4209 aeronave. 8

Correccione
s
ANDRES F anotaciones
CARDONA 100%
10-Dec RAMIREZ UH-1HII EJC5411 8

Inspección
de arnés de
pilotos
armado
FERNANDO barra
PLATA estabilizador
10-Dec NUÑEZ UH-1N EJC4212 a 8

Ajustes
sistema N1
y Cushsion
motor #2 y
ajustes leva
ARGEMIRO compensad
PEREZ ores sistema
10-Dec ZAPATA UH-1N EJC4224 N2 8

terminacion
total y
entrega de
documentaci
on de
inspeccion
numero 14
repack..
control
corrosion
JUAN del lado
CARLOS izquierdo del
10-Dec PINZÓN UH-1HII EJC5425 motor 8
Limpieza e
inspeccion
corrosion
EDGAR compartimie
CASTILLO nto de la
10-Dec RUIZ UH-1N EJC4212 transmision 8

Trabajos
inspección
de 100
horas,
control
corrocion y
JOSE remplazo
AMADEO pernos
10-Dec SANCHEZ UH-1HII EJC5433 rotativos 8
Engrase
main drive
shaft
Inspección
motor 1 filtro
p3
WILLIAM Inspección
CUERVO motor 2 filtro
HERNANDE p3
10-Dec Z UH-1N EJC4212 8

Caza fallas
en línea de
vuelo y
reglajes de
los motores
debido a la
caída de N2
a 96 % y
85% de
torque del
HERMES helicóptero
10-Dec ZAPATA UH-1N EJC4224 EJC 4224. 8

Inspección
de 100
ELMER horas,
JAVIER control
VILLAMIZA corrosión
10-Dec R UH-1HII EJC5433 por 90 dias 8

Repack,
control
corrosión
turbina,
instalación
LEONEL tapas de
10-Dec RIVAS UH-1HII EJC5425 inspección 8
® 10
diciembre
2021
® Línea de
vuelo EJC
4224
®
Cumplimient
o de
reportes
®
Regulación
del couchon
acelarador
motor nro 2
®
Regulación
RUBEN del sistema
ANTONIO de N2
10-Dec URUETA UH-1N EJC4224 ® PMD 8

Inspección
fase de 300
horas,
inspección y
LUIS chequeo del
FERNANDO 100 por
MONTILLA ciento de la
10-Dec SOSA UH-1HII EJC5411 aeronave 8

Inspección
control
corrosión
EJC 5425
Completado HERRAMIE
lubricación NTAS
acoples ESPECIALE
flexible de S (Grua,
LUIS los ejes Equipo
CARLOS impulsores NDT, Banco
PAHUANA del rotor de Pitostatico,
10-Dec FRANCO UH-1HII EJC5425 cola .. en otros) 8
Reinstalació
n del tubo
transversal
a los tubos
longitudinal
izquierdo y
derecho del
tren de
aterrizaje,
aplicación
de sellante.
Reinstalació
n de la barra
estabilizador
a en
proceso,
control
corrosión a
STIVENS las balineras
ARCOS de la barra
HERNÁNDE estabilizador
10-Dec Z UH-1N EJC4212 a. 8

Permiso por
Cirugia de
colecistecto
mia por
laparoscopia
que se
practicara a
mi esposa
en el
Hospital
Militar
Central
Bogota, lo
cual
requerie de
un
acompañant
GUILLERM e durante El
O LEON procedimien
CHALACAM to
10-Dec A OTROS quirurgico. 8
Instalación
filtro P3
reemplazo
packing
motor No 1

Instalación
filtro P3
reemplazo
packing
motor No 2

Inspección
cubierta
superior
entrada aire
motor No 2

Llenado de
DAVID formas libro
CASTAÑO loogbook y
10-Dec GARAY UH-1N EJC4212 libro de fase 8

Inspección,
fase de 300
HRS, control
corrosión,
remosion,
Inspección e
instalación
de paneles FALTANTE
del piso, S,
chequeo y HERRAMIE
reglaje NTAS
tubos de ESPECIALE
control S (Grua,
colectivo, Equipo
ALDEMAR chequeo NDT, Banco
AYALA reglaje del Pitostatico,
10-Dec CASTILLO UH-1HII EJC5425 cíclico. en otros) 8

- Corrección
PEDRO reportes
JOSE inspección
RICARDO post fase
10/12 BARRERO UH-1HII EJC5411 100%. 8
Desensambl
ey
mantenimie
nto de las
balineras del
gimbal ring.
Ensamble
del conjunto
RAFAEL de la barra
AVELLA estabilizador
10-Dec PATIÑO UH-1N EJC4212 a. 8

Tractado del
hangar a la
línea de
EDUARDO vuelo para
SANTOS lavado de
10-Dec BONILLA UH-1HII EJC5433 conpressor 8

Fase 200
hrs
- entrega de
trabajos
realizados al
inspector

- se realizó
repack al
Eje Principal
para
helicóptero
que se
CARLOS encuentra
ANDRES en el área
MARTINEZ de
10-Dec CARDONA UH-1N EJC4212 operaciones 8

- inspection
phase 200
hrs
* applied
PRC cover
flight
position
tailboom
-* installed
WALTER cover down
MEJIA tailboom 50
10/12 AGUDELO UH-1N EJC4212 % 4
WALTER - repack
MEJIA Main drive
10-Dec AGUDELO UH-1N EJC4200 shaft 4
EJC5433
Remoción e
instalación
de pernos
rotatorios
que
faltaban.
Traslado de
la.aeronave
para la linea
de vuelo.
Preparación
para lavado
CARLOS de
10-Dec RENTERIA UH-1HII EJC5433 compressor 8

Linea de
vuelo ejc
5437
Remocion e
instalacion
starter
JAIRO generador
QUIROZ del motor
RODRIGUE por
10-Dec Z UH-1HII EJC5437 Cambio 8

EJC5425
10-
Diciembre.
Diligenciami
ento formas
JOSE LUIS 2408-13-1 y
10-Dec ESCOBAR UH-1HII EJC5425 2408-13-2. 8

You might also like