BAR 

BENDING SCHEDULE GITET 500/150 kV AMPEL ‐BOYOLALI
 Lokasi                                                                     : PONDASI TOWER 01
 Gambar Referensi                                                : ‐

P L T P L T
Dimensi PAD                                                                    : 6400 6400 1000 Dimensi  CHEMNEY                                 : 1100 1100 2200
Jumlah Leg                                                                       : 4 Leg Jumlah Leg                                                : 4 Leg
Selimut Beton                                                                  : 50 mm Selimut Beton                                           : 50 mm
Selimut Beton                                                                  : 50 mm Sesifikasi Besi Tulangan Utama              : 22 mm 36 bh
Sesifikasi Besi Tulangan                                                  : 22 mm Sesifikasi Besi Tulangan Begel                : 12 mm
Jarak Tulangan                                                                 : 150 mm Jarak Tulangan                                         : 140 mm
Jumlah Tulangan /PAD                                                   : 168 bh   

jml  jml berat jml total   waste  besi 


pjg pot berat/m jml Leg jml berat pjg/btg cut waste  jml waste 
KODE POSISI SKET dia besi pot 1 unit pot /btg  dipakai
(m) (pcs) (kg) (kg) (unit) (kg) (pcs) (m) (pcs)  (m)  (btg) (m)  (pcs) 
1 2 3 4=1x2x3 5 6=4x5 7=2x5 8 9=8:1 10=8‐(1x9)
 PILECAP (PAD)
6300
A D 22 8.10 84 2.98 2,030.22 4 8,120.87 336      12.00        1.00        3.90 336        3.90          336

900

900
TUL. UTAMA PAD D 22 ‐ 150 A               ‐               ‐
B D 22 8.10 84 2.98 2,030.22 4 8,120.87 336      12.00        1.00        3.90 336        3.90          336
              ‐               ‐
900

900
B

6300

200
SPACER 16 D 22
D 22 2.22 16 2.98 106.18 4 424.71 64      12.00        5.00        0.88 13        0.88            12
812

812
       3.10              1

200 200

A D 22 6.78 4 2.98 80.97 4 323.88 16      12.00        1.00        5.22 16        5.22            16


4 D 22 264               ‐               ‐
6256

264

 CHEMNEY

A D 22 2.50 36 2.98 268.12 4 1,072.47 144      12.00        4.00        2.02 36        2.02            36
              ‐               ‐
1000
A TUL. UTAMA 36 D 22 75
75

B Ø 12 4.15 15 0.89 55.26 4 221.05 60      12.00        2.00        3.70 30        3.70            30


B BEGEL Ø 12 ‐ 140 C               ‐               ‐
1000

1000

B
2056

A
C EXTRA 4 Ø 12 C Ø 12 1.15 4 0.89 4.08 4 16.33 16      12.00      10.00        0.50 2        0.50              1
       5.10              1

440
jml 
jml berat jml total   waste  besi 
pjg pot pot 1  berat/m jml unit jml berat pjg/btg cut waste  jml waste 
BORE PILE dia besi titik
1 unit pot /btg  dipakai

(m) (pcs) (kg) (kg) (unit) (kg) (pcs) (m) (pcs)  (m)  (btg) (m)  (pcs) 
1 2 3 4=1x2x3 5 6=4x5 7=2x5 8 9=8:1 10=8‐(1x9)

Tulangan Utama 8 D 16 A D 16 11.16 8 1.58 141 100 14,095.58 800      12.00        1.00        0.84 800        0.84          800
              ‐               ‐
96
A

768 10300

Tulangan Begel Ø 10 ‐ 175 Ø 10 12.00 5 0.62 37 100 3,699.00 500      12.00        1.00               ‐ 500               ‐               ‐
              ‐               ‐