After the steam piping has been commissioned, explain the testing and final state of:
- De-superheater or attemperator - 2
- Boiler management - 4
- Boiler - 4
4) You are the chief power engineer in charge of a power plant. You are to install a
back-up 750kW emergency generator. What are 6 items to consider?
- what are micro turbines?
- What are the common flows and speeds?
- What is an important aspect of a microturbine?
- Draw a microturbine with a recurperator
6) List 10 Final Tests you would do to ensure the piece of equipment is safe and efficient
– 20 marks
7) If you are the chief involved in a retrofit or a new plant, explain the 3 key aspects of
Evaluating the need of the project. – 15 marks
- something about a supervisor role – 1 mark
- List the 4 steps involved – 4 marks