1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

A1 LIST OF ALL RELEVANT DRAWINGS OR DOCUMENTS THAT DIRECTLY RELATE TO


A SUBSTATION MINIMUM ELECTRICAL CLEARANCES THE CURRENT REVISION OF THE DRAWING A

REQUIREMENTS TO BE IN ACCORDANCE WITH SSE SUBSTATION DESIGN SPECIFICATION DOC No. SP-PS-399
DOCUMENT REFERENCE:
NOMINAL SYSTEM VOLTAGE
REF CLEARANCE (mm)
400kV 275kV 132kV 33kV
NOTES:-
E PHASE TO EARTH 2800 2100 1200 500 1. ELECTRICAL REQUIREMENTS BASED ON DRD DOC. REF. RI-XXX-DRD-0.
Ph 2. ALL DIMENSIONS GIVEN IN MILLIMETRES (mm) U.N.O.
PHASE TO PHASE 3600 2400 1400 430
3. EXISTING SUBSTATION LAYOUT TAKEN FROM DRAWING NUMBERS
S DESIGN CLEARANCE FOR SAFETY 5500 4800 3500 2900 215_1104_1072_00_00 AND 215_1104_1079_00_00.
4. SITE SURVEY TAKEN FROM 215_0802_1036_00_02.
SD SAFETY DISTANCE 3100 2400 1400 800
B 14836 5. PROPOSED 400kV & 275kV BAYS TAKEN FROM SSEN STANDARD BAY B
Ds WORKING & ACCESS CLEARANCE (VERTICAL) 5200 4500 3500 2900 ARRANGEMENTS.
6. PROPOSED 400kV SUBSTATION SITE AND PLATFORM TAKEN FROM
63125 Dsh WORKING & ACCESS CLEARANCE (HORIZONTAL) 4600 3900 2900 2300 PREVIOUSLY PLANNING APPROVED URS DRAWING NUMBER
IH INSULATION HEIGHT (PEDESTRIAN ACCESS) 2400 2400 2400 2400 49336064/1006/D - PROPOSED PLATFORM LAYOUT, DATED 11.06.12.
7. NEW 275kV OHL COMPOUND AREA MODIFIED FROM PREVIOUS
SUBMISSION AS PER DRAWING ABOVE.
8
31235 8. FIRE DAMAGE ZONE CALCULATED AS PER NGTS 3.1.3. ISSUE 2, JANUARY
2013.
9. GANTRY AND DOWNLEAD CONNECTION TO AIS EQUIPMENT FROM OHL IS
N1
H I E N ORMA 1 INDICATIVE ONLY AND REQUIRES TO BE FULLY INVESTIGATED AND
ROT XR
97 DESIGNED (INCLUDING WIRE CLEARANCE DIAGRAM) BY OHL ENGINEER.
C 2343 10. ALL CABLE ROUTES, BENDS AND SPACINGS INDICATIVE ONLY AND C
N2
RY ORMA REQUIRE TO BE FULLY INVESTIGATED AND DESIGNED BY CABLE
ANNING BOUNDA THIEN

21410
PL RO
ENGINEER.
XR2

KE
46
1N

11. NEW 275kV BAY CONNECTIONS TO EXISTING KINTORE BUSBAR TO BE

1A
line

XK
ITH
center

ormer

67
Transf

line
r

1B
cente
r
forme
Trans

1C
6
FULLY INVESTIGATED, CONNECTIONS SHOWN INDICATIVELY ONLY.
PI 12. MAIN TRANSFORMER ROAD TO BE POSITIONED TO ENSURE THAT THE

44255
ANTR
Y SA DELIVERY VEHICLE CAN PASS UNDERNEATH EXISTING OVERHEAD LINES
G

DIS W
6363
9985
WITHOUT INFRINGING CLEARANCES.

2ES
13000
CVT 4860

C/
11525
AD

6363
RY RO 2ESW 6110148060
9985
13. CONTROL BUILDING DESIGN TO BE CONFIRMED.
DISC/0
E 13661
ELIV 11525 4860

POND RMER D 25 6 0 14. PREVIOUSLY SUBMITTED PLATFORM AND GROUNDWORKS LAYOUT USED

CB
O 13661
ANS F
IDE TR

PE
CT 35 AS BASIS OF THIS PROPOSED LAYOUT TO HIGHLIGHT THE EXTENSION
5m W

VX
TER

R1
29100 53 THAT WILL BE REQUIRED IN ORDER TO COMPLETE THE AIS WORKS AS

1
CB
CB

HE
D IB D
AIS/G PROPOSED. IF THIS DESIGN IS TO GO AHEAD THEN PLATFORM AND

ESW

A
22000

CT
SA

CVT

D
HPI
RY PI 1500 GROUNDWORKS WILL HAVE TO BE REDESIGNED TO SUIT AND RE-ISSUED

PI
GANT ESW 18152
0
CVT 1500 AS PART OF ANY FUTURE PLANNING SUBMISSION.

HPI

CB
0
0

88
1372 15. PROPOSED SWITCH OF BLACKHILLOCK AND PETERHEAD/KEITH BAYS TO
35000

5m W
ESW
R4

CT
CT 7

48234
PI SGT4 kV BE CONFIRMED AND FULL IMPLICATIONS CONSIDERED.

PI
915 6 75

IDE TR
AIS/G
IB 400/2

SG
R30 29100

T2
000

ANSF
IB

87792
AIS/G R7
22679 24 m 00
14
OS MAP NJ71SE
14.5x 0

OR
12
PI REPRODUCED BY PERMISSION OF ORDNANCE SURVEY ON BEHALF OF HMSO.

MER D
10
IB
AIS/G CROWN COPYRIGHT AND DATABASE RIGHT 2016. ALL RIGHTS RESERVED.
8

ORDNANCE SURVEY LICENCE NUMBER EL273236.

E
PI

LIVER

ESW
6

E E

CVT
5m

HPI
14.5x SA
4

Y
5m CSE
2

14.5x

ROAD

HPI
88853

BL 1
R4
21058

XH
88

AC
ESW
0
KEY:-

K
1

HIL
SGT5 kV

L
75

OC
400/2

K
3

EQUIPMENT EXISTING
R700 36. 7m
5

6000
0 14.5x EQUIPMENT PROPOSED 2023
7
27800

BL 2
EQUIPMENT PROPOSED 2026
94166
9

XH
AC
16545

EQUIPMENT FUTURE WORKS


10100
11

K HIL

SG
13

T1
OC
R30000
15

12x6m

K
F F
22258

IB

R3
AIS/G

KIN
18152
29645

m
12x10

XZ1
CA
CVT
26645

RD
35000
3

CSE
17787

INE

TEA

SG
XT3
38256

T3
LIN
29100

G
22679 24028
CSE

PI
CT
OAD

T
ERY R CVT

13163
9000

LIV

PI
0 ER DE ESW

SA
00 FORM

TEA
ANS

CS
30

XT2
SA
G R IDE TR G

LIN
E
5m W RY
GANT

GW
16600

25821
EXISTING

294

ES
5
11

T
TOWER 91 45

62
1280
7800

ENCE
RITY F 40978

F
U
ADE S
EC LWAY
PALIS R WA

TEA
M ET E
RI
2m PE

LIN
G E XT1
AS
T
SCALE AT 1:1000

4
H 14500 H
0m 25m 50m 75m 100m

A
28281

PRELIMINARY DESIGN ONLY


NOT TO BE USED FOR
RES SO 1 CONSTRUCTION
FETTE
XS1

R
0
46

J 36 J
58
62

49

60
0

83
62

5
0

0
PLA

SO 2 00
RES 36
NN

FETTE XS2

DRAFT
ING

A96
E&
BO

TOR

D
UN

IN
OK
DA

7T
B97
RY

E
NC
FE
P/W
ED
K OS K
OP
PR Rev: Drawn: Approved: Description:
PMR FOR INTERNAL COMMENT ONLY.
0B Checked: Date: CIRCUIT BAY POSITIONS AMENDED.
26.02.20 FUTURE CABLE ROUTES ADDED.
EXISTING
TOWER

RY
DA
OUN
B
G
NNIN SSE Inveralmond House, 200 Dunkeld Road
A
PL Perth, PH1 3AQ, UK www.sse.com
L Project: L
BLACKHILLOCK TO PETERHEAD (EAST COAST)

T
ECH
UN
Project Number: LT000220 Location: KINTORE

OD
Title:

7T
KINTORE SUBSTATION 400kV UPGRADE

B97
TEMPORARY 400/275kV TRANSFORMER INSTALLATION
ELECTRICAL LAYOUT - FINAL 2026
Drawing Status: PRELIMINARY Drawn: PMR
Scale: 1:1000 @ A1 Checked:

Date: 24.02.2020 Approved:

M Drawing Number: Sheet No: Revision No: M


Date Plotted: 26.02.2020
File Name: LT220_KINT_1104_0010_00_0A_DRAFT - EAST COAST 400kV Upgrade - Kintore GIS OPTION (Temporary 2023).dwg LT220_KINT_1104_0012 00 0B
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

You might also like