PART A REQUIRED FOR THE PAVEMENT STUD WHEN LAID TO THE CORRECT LINE AND DIRECTION. THE WALLS OF THE SAMPLING AND TESTING
CAVITY SHALL BE SPLAYED BACK AT THE ANGLE OF APPROXIMATELY 30O TO THE VERTICAL TO FACILITATE A
FACILITIES FOR THE ENGINEERS “DOVE-TAIL” JOINT AFTER THE MORTAR HAS SET.
SAMPLING SHALL BE TAKEN AT THE PLANT OR WAREHOUSE PRIOR TO DELIVERY OR AT THE TIME OF DELIVERY.
IF SAMPLING IS DONE PRIOR TO SHIPMENT, THE ENGINEER SHALL HAVE THE ACCESS TO THE MATERIALS TO BE
SAMPLED. THE ENGINEER SHALL BE PROVIDED ALL REASONABLE FACILITIES FOR INSPECTION AND SAMPLING
THE CONTRACTOR SHALL AT ALL TIMES DURING THE DURATION OF THE CONTACT PROVIDE FOR THE USE OF THE BOTTOM OF THE CAVITY SHALL BE LEVELLED WITH ASPHALT CONCRETE PRIOR TO PLACING THE STUD BASE
SHALL BE CONDUCTED SO AS NOT TO INTERFERE UNNECESSARILY WITH THE OPERATION OF THE WORKS.
ENGINEER ALL EQUIPMENT, INSTRUMENTS AND APPARATUS, ALL INFORMATION AND RECORDS AND QUALIFIED WHICH SHALL BE POUNDED INTO POSITION WITH A POUNDER FOOT ATTACHED TO THE PNEUMATIC DRILL.
CHAINMEN AND LABORERS REQUIRED BY THE ENGINEER FOR INSPECTING AND MEASURING THE WORKS. SUCH SAMPLES SHALL CONSIST OF ONE OF THE MANUFACTURER'S ORIGINAL SEALED CONTAINERS SELECTED AT
EQUIPMENT, INSTRUMENTS AND APPARATUS SHALL INCLUDE THOSE LISTED IN THE SPECIAL PROVISIONS. THE DEPTH OF THE ACTIVITY SHALL BE SUCH THAT WHEN THE STUD BASE AND REFLECTORS HAVE BEEN RANDOM FROM THE LOT OR BATCH OF FINISHED MATERIAL THAT WAS MANUFACTURED SIMULTANEOUSLY OR
INSTALLED THE ELEVATION OF THE FLOOR OF THE LENS SOCKET SHALL NOT BE GREATER THAN 2.0 MM OR LESS CONTINUOUSLY, AS A UNIT BETWEEN THE TIME OF COMPOUNDING AND THE TIME OF PACKAGING OR PLACING IN
THE CONTRACTOR SHALL PROVIDE WITHIN THIRTY (30) CALENDAR DAYS AFTER NOTICE TO COMMENCE WORK, THAN 1.0 MM ABOVE THE PAVEMENT SURFACE. SHIPPING CONTAINERS.
THE VEHICLE LISTED IN THE SPECIAL PROVISIONS FOR THE EXCLUSIVE USE OF THE ENGINEER. THE VEHICLES ON
DELIVERY SHALL BE NEW AND SHALL BE DRIVEN BY A COMPETENT QUALIFIED AND EXPERIENCED DRIVER WHO OBTAIN THE HOT-POURED TYPE SEALANT PORTION FOR TESTING FROM THE SELECTED MANUFACTURER'S
WHEN THE STUDS ARE INSTALLED INTO A CEMENT CONCRETE PAVEMENT, THE STUD SHALL BE GROUTED INTO ORIGINAL SEALED CONTAINER IN ACCORDANCE WITH ASTM 05167. THE SAMPLE PORTION ADDED TO AND HEATED
SHALL BE UNDER THE DIRECT ORDER OF THE ENGINEER.
POSITION WITH ASPHALT CONCRETE CONTAINING FINE AGGREGATE ONLY OR WITH A CEMENT MORTAR AS IN THE MELTER SHALL WEIGH 800 ± 50 G.
DESCRIBED IN SUBSECTION 607.2.3 ABOVE.
IMMEDIATELY AFTER ALL MATERIALS TO BE USED IN THE PROJECT HAVE PASSED THE MINIMUM TESTING HEAT THE MATERIAL IN ACCORDANCE WITH ASTM 05167.
REQUIREMENTS BASED ON THE STANDARD SPECIFICATIONS FOR DPWH, THE MANNER OF OPERATION IN THIS
PARTICULAR PROJECT SHALL HAVE THE FOLLOWING SEQUENCE: TESTING FOR HOT-POURED TYPE SEALANT SHALL BE IN ACCORDANCE WITH ASTM 05329.
ITEM 612 - REFLECTIVE THERMOPLASTIC STRIPING MATERIAL (SOLID FORM) SAMPLES FOR TESTING OF COLD APPLICATION TYPE SHALL CONSIST OF SUFFICIENT QUANTITIES OF EACH
COMPONENT TO PROVIDE 3.785 LITERS (1 GAL) OF SEALANT MATERIAL. TESTING SHALL BE IN ACCORDANCE WITH
PART B THE PAINTING OF LANE MARKERS AND TRAFFIC STRIPS SHALL INCLUDE THE CLEANING OF THE PAVEMENT ASTM 01851.
OTHER GENERAL REQUIREMENTS SURFACES, THE APPLICATION, PROTECTION AND DRYING OF THE PAINT COATINGS, THE PROTECTION OF
PEDESTRIANS, VEHICULAR OR OTHER TRAFFIC, THE PROTECTION OF ALL PARTS OF THE ROAD STRUCTURE AND
SHALL BE PROVIDED BY THE CONTRACTOR AND SHALL MAINTAIN SUCH OFFICES, STORES, WORKSHOPS
ITS APPURTENANCES AGAINST DISFIGUREMENT BY SPATTERS, SPLASHES OR SMIRCHES OF PAINTS OR OF PAINT
LATRINES AND MESSING ACCOMMODATIONS AS ARE NECESSARY. THESE SHOULD BE LOCATED IN THE
MATERIALS, AND THE SUPPLYING OF ALL TOOLS, LABOR AND TRAFFIC PAINT NECESSARY FOR THE ENTIRE
CONTRACTORS COMPOUND, DISTINCT AND SEPARATE FROM ENGINEERS COMPOUND. THE DIMENSIONS AND WORK.
LAYOUT OF THE BUILDINGS AND PLACES SHALL BE SUBJECT TO THE APPROVAL OF THE PROJECT ENGINEER. THE
CONTRACTOR SHALL PROVIDE AND MAINTAIN THROUGHOUT THE DURATION OF THE CONTRACT. THE PAINT SHALL NOT BE APPLIED DURING RAIN OR WET WEATHER OR WHEN THE AIR IS MISTY, OR WHEN IN THE
OPINION OF THE ENGINEER, CONDITIONS ARE UNFAVORABLE FOR THE WORK. PAINT SHALL NOT BE APPLIED
MOBILIZATION UPON DAMP PAVEMENT SURFACES, OR UPON PAVEMENT WHICH HAS ABSORBED HEAT SUFFICIENT TO CAUSE
SHALL CONSIST OF MOBILIZATION OF EQUIPMENT AND MANPOWER, MATERIALS AND OTHER ITEMS THAT THE PAINT TO BLISTER AND PRODUCE A POROUS FILM OF PAINT.
SHALL BE USED IN THE IMPLEMENTATION OF THE PROJECT. ALL CEMENT MATERIALS SHALL BE STORED THE APPLICATION OF PAINT SHALL PREFERABLY BE CARRIED OUT BY A MACHINE SPECIALLY MADE FOR THIS
IMMEDIATELY UPON DELIVERY AT SITE, IN A WEATHER PROOF BUILDING WHICH WILL PROTECT THE CEMENT PURPOSE BUT WHERE BRUSHES ARE USED, ONLY ROUND OR OVAL BRUSHES NOT EXCEEDING 100 MM IN WIDTH
FROM DAMPNESS, THE FLOOR SHALL BE RAISED FROM THE GROUND BY 4 INCHES. ALL SIGNAGES SHALL BE WILL BE PERMITTED. THE PAINT SHALL BE SO APPLIED AS TO PRODUCE A UNIFORM, EVEN COATING IN CLOSE
PLACED AT THE DESIGNATED LOCATIONS APPROVED BY THE PROJECT ENGINEER. CONTACT WITH THE SURFACE BEING PAINTED.
TRAFFIC PAINT SHALL BE APPLIED TO THE PAVEMENT AT THE RATE OF 0.33 L /M2 AND SHALL DRY SUFFICIENTLY
DEMOBILIZATION TO BE FREE FROM CRACKING IN FROM 15 TO 30 MINUTES.
FOLLOWS ONLY AFTER THE PROJECT WAS FINALLY ACCEPTED AND SURROUNDINGS ARE PROPERLY CLEANED. ALL MARKINGS SHALL PRESENT A CLEAN CUT, UNIFORM AND WORKMANLIKE APPEARANCE. MARKINGS THAT FAIL
TO HAVE A UNIFORM, SATISFACTORY APPEARANCE EITHER BY DAY OR NIGHT, SHALL BE CORRECTED BY THE
PART E CONTRACTOR IN A MANNER ACCEPTABLE TO THE ENGINEER AND AT NO COST TO THE GOVERNMENT.
SURFACE COURSES
ITEM 613 - CONCRETE JOINT SEALANT (HOT-POURED ELASTIC AND COLD APPLIED TYPES)
FLUSH SURFACE TYPE 3. DPWH STANDARD SPECIFICATIONS FOR CONCRETE JOINT SEALANT (HOT-POURED ELASTIC AND
DELIVERY AND STORAGE
THE STUD SHALL BE INSTALLED INTO THE PAVEMENT IN ACCORDANCE WITH THE MANUFACTURER‟S COLD-APPLIED TYPES), ITEM 613 - DWPH DEPARTMENT ORDER NO. 11 SERIES OF 2016
INSTRUCTIONS BUT SHALL ALSO COMPLY WITH THE FOLLOWING REQUIREMENTS. CAVITIES IN THE PAVEMENT JOINT SEALER SL-IALLBE DELIVERED IN MANUFACTURER'S ORIGINAL UNOPENED CONTAINERS AND PACKAGING,
SHALL BE CLEARLY CUT TO THE DIMENSIONS OF THE PAVEMENT STUD AND SHALL ALLOW A CLEARANCE OF 10 WITH LABELS CLEARLY IDENTIFYING PRODUCT NAME AND MANUFACTURER. THE JOINT SEALER SHALL BE
MM AROUND THE STUD BASE. THE LONGITUDINAL CENTERLINE AXIS OF THE CAVITY SHALL BE THE SAME AS THAT STORED IN DRY AND SHADED AREA IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. CONTAINERS
SHALL BE SEALED UNTIL IT IS READY FOR USE. EXPIRED JOINT SEALER SHALL BE REMOVED FROM THE SITE.
PROJECT NAME AND LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
PREVENTIVE MAINTENANCE OF ROAD: DONALD H. IBE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ASPHALT OVERLAY - DAANG MAHARLIKA (MN) -
REGION XI ENGINEERING ASSISTANT
K 1401+776 - K 1402+237, K 1402+271 - K 1403+897
CONSTRUCTION REQUIREMENTS
DAVAO DE ORO 2ND DISTRICT ENGINEERING OFFICE PREPARED:
ANTHONY T. LUMASAG LORNA B. ROBIN EDWIN M. ORTIZ MINDA R. ROSLINDA
COMPOSTELA, DAVAO DE ORO -
CHRISTIAN RENCY S. GELLA ENGINEER II / UNIT HEAD (HIGHWAY DESIGN) CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER II
MONTEVISTA - MONKAYO, DAVAO DE ORO DATE: DATE: DATE: DATE:
TYPICAL ROADWAY SECTION DETAILS
℄ MEDIAN
PROJECT NAME AND LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
PREVENTIVE MAINTENANCE OF ROAD: DONALD H. IBE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ASPHALT OVERLAY - DAANG MAHARLIKA (MN) -
REGION XI TYPICAL ROADWAY SECTION DETAILS ENGINEERING ASSISTANT
K 1401+776 - K 1402+237, K 1402+271 - K 1403+897
DAVAO DE ORO 2ND DISTRICT ENGINEERING OFFICE (TYPICAL ROADWAY SECTION, DESIGN PAVEMENT PARAMETERS,
PREPARED:
ANTHONY T. LUMASAG LORNA B. ROBIN EDWIN M. ORTIZ MINDA R. ROSLINDA
COMPOSTELA, DAVAO DE ORO ZOOM A DETAIL, ZOOM B DETAIL, APPROXIMATE SLOPE RATIOS) -
CHRISTIAN RENCY S. GELLA ENGINEER II / UNIT HEAD (HIGHWAY DESIGN) CHIEF, PLANNING & DESIGN SECTION OIC - ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER II
MONTEVISTA - MONKAYO, DAVAO DE ORO DATE: DATE: DATE: DATE:
TYPICAL ROADWAY SECTION DETAILS
℄
SEE "ZOOM E" DETAILS
2.00 3.35 3.35 3.35 3.35 3.35 3.35 2.00
LANE 6 LANE 5 LANE 4 LANE 3 LANE 2 LANE 1
PROPOSED STUD
TYPICAL ROADWAY SECTION
EXISTING ASPHALT OVERLAY
SHOWING EXISTING 6-LANE CARRIAGEWAY WITHOUT MEDIAN AND
EXISTING PCCP PROPOSED ASPHALT OVERLAY ON LANES 3 & 4
℄ MEDIAN
PROJECT NAME AND LOCATION: SHEET CONTENT: DRAFTED: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
PREVENTIVE MAINTENANCE OF ROAD: DONALD H. IBE
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS ASPHALT OVERLAY - DAANG MAHARLIKA (MN) -
REGION XI ENGINEERING ASSISTANT
K 1401+776 - K 1402+237, K 1402+271 - K 1403+897