NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
a. Sewer Under-Ground Piping Work b. Fabrication of Pipe
1 PTA 1-2 PRO Merak PT. Bakrie Kasei Corporation JGC. CORPORATION May 94 - Feb. 95 Completed
Support, Piping Work Platform
2 PTA I - PRO Merak Shut Down Maintenance Work PT. Bakrie Kasei Corporation JGC. CORPORATION 1st Sept. 94 -15th Sep.94 Completed
Dismantling / Transportation & Re-Install of Extruder Machine
3 EXTRUDER LINE Cibitung PT. Topla Abadi Jaya PT. Taiyo Sinar Raya Teknik 10 Dec. 94 -25 Dec. 94 Completed
Line
Erection & Mechanical Work of Equipment & Fabrication/
4 10P-Project Tangerang PT. Toray Synthetic PT. Taiyo Sinar Raya Teknik Jan. 95 - 30 Jun. 95 Completed
Installation of Hoist Rail
5 Topla Project. Cibitung Piping & Platform Work PT. Topla Abadi Jaya PT. Taiyo Sinar Raya Teknik 10. Jan. 95 30 Jan. 95 Completed
6 AJ.-1 Project Cibitung Machines Installation PT. NSK Bearing Manufacturing Ind. PT. Taiyo Sinar Raya Teknik Feb. 95 - Apr. 95 Completed
Erection & Mechanical Work of Heavy Equipment ( PTA Chemical
7 PTA I - 2 PRO Merak PT. Bakrie Kasei Corporation JGC. CORPORATION Mar 95 - May . 96 Completed
Plant ) 3500 - Ton
8 PTA I - PRO Merak Shut Down Maintenance Work PT. Bakrie Kasei Corporation JGC. CORPORATION 21 Jun.95 -10 Jul. 95 Completed
PT. MARUPLA INDONESIA ( Marubeni &
9 Suzuki Autobike Conveyor Cibitung Conveyor Line & Drum Tester Installation PT. ISI / SUZUKI Sep. 95 - Oct 95 Completed
Plant Equipment )
10 Step-1 / Step- 2 Project Bekasi Piping, Electrical, Fabrication Work & Machine Installation PT. MI / ISUZU PT. Chiyoda International Indonesia Oct. 95 Completed
11 Riken Project Cibitung Erection & Mechanical Work of Equipment's PT. Riken Asahi Plastic Direct By GTA Oct. 95 - Nov. 95 Completed
Dismantling, Sliding Moving Re- Install of 11 units Big Press PT. MARUPLA INDONESIA ( Marubeni &
12 11 units Big Press Machines Cibitung PT. ISI / SUZUKI Dec. 95 Completed
Machine (Total 770 - Ton) Plant Equipment )
13 EXTRUDER LINE Cibitung Extruder Machine Installation PT. Topla Abadi Jaya Direct By GTA Dec. 95 Jan . 96 Completed
14 AJ.-2 Project Cibitung Machine Installation PT. NSK Bearing Manufacturing Ind. Direct By GTA Dec. 95 - Jun. 96 Completed
15 Crank Shaft & cyl. Head line Sunter Piping, Electrical, Fabrication Work & Machines Installation PT. Astra Daihatsu Motor Direct By GTA Dec. 95 - Jan. 96 Completed
Piping, Electrical, Fabrication Work & Machines Installation
16 Cyl. Body Line Sunter PT. Astra Daihatsu Motor Direct By GTA Mar. 96 Completed
(Dismantling / Re-Install of Cyl. Body Line)
PT. MARUPLA INDONESIA ( Marubeni &
17 Marsol Expansion Project Cibitung Extruder M/C Line & Others M/C Installation PT. Marsol Mar. 96 - April 96 Completed
Plant Equipment )
18 TJP.Project Cikarang Machine Installation TOSHIBA PT. Kaliguma Transindo Apr. 96 - May. 96 Completed
19 PTA 1 PRO & 1-2 PRO Merak Commisioning Work & Daily Maintenance (PTA Plant) PT. Bakrie Kasei Corporation JGC. CORPORATION Feb. 96 - May 96 Completed
Painting Shop, Hoist & Conveyor
20 Pulogadung Painting Shop, Hoist & Conveyor Line Fabrication & Installation. PT. Mitsubishi Krama Yudha Motor Nakanishi Metal Work Apr. 96 - Jun. 96 Completed
Line
21 BPP-1 Upgrading Project Balikpapan Erection & Mechanical Work of Heavy Equipment (2500 -Ton) PERTAMINA Nippon Express (Singapore) Apr. 96 - Jun 97 Completed
22 PTA I - PRO Merak Shut Down Maintenance Work PT. Bakrie Kasei Corporation JGC. CORPORATION Jun. 96 Completed

23 PTA I - 2 PRO Merak Shut Down Maintenance Work PT. Bakrie Kasei Corporation JGC. CORPORATION Jul. 96 Completed
24 Machine Installation Bogor Injection Machines Installation PT. Pralon PT. Kaliguma Transindo Jun. 96 Completed
Refrigerator Painting and Conveyor
25 Pulogadung Painting Shop, Hoist & Conveyor Line Fabrication & Installation Lippo Melco ( Mitsubishi Electric ) Nakanishi Metal Work Jul. 96 - Aug. 96 Completed
Line
26 Press Machine Cikampek Press Machine Installation PT. Kotobuki Indo Classic PT. OKA Int'l Logistama Jul. 96 Completed
27 Slitter & Leveller Line Karawang Machine Installation & Mechanical Work PT. Sarana Steel Center ( ITOCHU ) PT. OKA Int'l Logistama Jul. 96 - Aug. 96 Completed
28 Slitter & Leveller Line Cikarang Machine Installation & Mechanical Work PT. Nicorindo PT. Taiyo Sinar Raya Teknik Jul. 96 Completed
29 Dunlop Tyre Project Cikampek Machine Installation & Mechanical Work (Total 1800 ton) PT. Sumi Rubber Indonesia PT. Taiyo Sinar Raya Teknik Oct. 96 - Dec. 96 Completed
30 Statomer SDM Merak Shut Down Maintenance Work PT. Statomer NCC Aug. 96 Completed
Painting Shop Hoist & Conveyor
31 Pulogadung Painting Shop, Hoist & Conveyor Line Fabrication & Installation PT. Mitsubishi Krama Yudha Motor Nakanishi Metal Work Aug. 96 - Dec. 96 Completed
Line
32 Laminating Line Bogor Mechanical Installation Work PT. Lintec Indonesia Nippon Express (Tokyo H/O) Aug. 96. Completed
33 Machine Installation Cikarang Press Machine Installation PT. Kawamura Indah Indonesia PT. OKA Int'l Logistama Sep. 96 Completed
34 Mechanical Installation Cibitung Press Machine Installation PT. Taiyo Toshin Indonesia PT. OKA Int'l Logistama Sep. 96 Completed
35 Lifter Conveyor Cilincing Lifter Conveyor Line ( for Back-Hoe ) Installation PT. Komatsu
1 of 21Indonesia PT. Artawa Indonesia Sep. 96 - Oct. 96 Completed
36 Rotary Shear Line Cibitung Mechanical Installation & Mechanical Work PT. Mitra Dayacipta Metalindo ( NICHIMEN ) Konoike Engineering Sep. 96 - Nov. 96 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
37 Exor -1 Pj. SDM. Work Balongan Shut Down Maintenance Work PERTAMINA UP-VI BALONGAN PT. Catur Yasa Sep. 96 - Nov. 96 Completed
Die - Casting Machine/ Melting Furnace Installation ( 800T,
38 Alumunium Die-Casting Karawang PT. Astra Daihatsu Motor Direct By GTA Nov. 96 - Dec 96 Completed
1250T,1650T) Piping & Electrical Work
PT. MARUPLA INDONESIA ( Marubeni &
39 Injection Line Cibitung Machine Installation (11 units & Accsessories) PT. Topla Techno Nov. 96 - Dec. 96 Completed
Plant Equipment )
40 Fabrication Work Cibitung Fabrication Work PT. Mitra Dayacipta Metalindo ( NICHIMEN ) Direct By GTA Nov. 96 - Dec. 96 Completed
41 AJ- 3 Project Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Nov. 96 - Apr. 97 completed
Shut Down Maintenance / Modification of Painting Shop Hoist
42 SDM/ Modification Pulogadung PT. Mitsubishi Krama Yudha Motor Nakanishi Metal Work Dec. 96 Completed
Fabrication.
43 PSF( CP) Project Tangerang Erection & Mecanical Work of Heavy Equipment PT. Teijin Fiber Indonesia/ TEIJIN PT. Chiyoda International Indonesia Dec. 96 - Sep. 97 Completed
44 Crank Shaft Line Sunter Mechine Installation & Re-Install PT. Astra Daihatsu Motor Direct By GTA Jan. 97 Completed
45 Machine Installation Bekasi Machine Installation PT. Tochigifuji Indonesia PT. OKA Int'l Logistama Jan. 97- Feb. 97 Completed
46 Machine Installation Cikampek Machine Installation PT. Kawamura Indah Indonesia PT. OKA Int'l Logistama Jan. 97 Completed
47 INK/GRAPIA, NEWS PAPER Bogor Machine and Tank Installation PT. Cemani Toka PT. OKA Int'l Logistama Feb. 97 - Jul. 97 Completed
48 Machine Installation Cibitung Injection M/C Installation PT. Nippon Plast PT. OKA Int'l Logistama Apr. 97 Completed
49 PTA Project Merak Fabrication and Manpower Supply PT. Amoco Mitsui PTA Indonesia PT. Artawa Indonesia Mar. 97 - Jun. 97 Completed
50 New Engine Line Sunter Machine, Installation, Piping Electrical Work PT. Astra Daihatsu Motor Direct By GTA May' 97 Completed
51 Injection Line Cibitung Injection M/C Installation PT. Topla Techno Direct By GTA May' 97 Completed
52 Injection Line Cibitung Injection M/C Installation PT. Showpla Indonesia Konoike Engineering Apr. 97 - May' 97 Completed
Cancelled continue
Erection & Mechanical Work of Heavy Equipment (AROMATIC
53 Aromatic Plant TPC. Project Tuban PT. Trans Pacific Petrochemical Indotama NIPPON EXPRESS CO. LTD. Jun. 97 - as Tuban
PLANT)
Aromatics Pj.
Erection & Mechanical Work of Heavy Equipment
54 AAI-Project. Anyer PT. Nisshoku Tripolyta Acrylindo MITSUBISHI HEAVY INDUSTRIES Jun.97 - May 98 Completed
(1800 Ton)
55 Machine Installation Karawang Machine Installation PT. Tochigifuji Indonesia PT. OKA Int'l Logistama Apr. 97 Completed
56 Machine Installation Karawang Machine Installation PT. Univance Indonesia PT. OKA Int'l Logistama Apr. 97 Completed
57 SBR Project Bojonegara Diesel Engine Generator installation Work PT. Satomo Indopolymer PT. KALIGUMA TRANSINDO Jun. 97 Completed
58 Injection Line Jakarta Utara 1650 Ton Aluminium Die- Casting Installation PT. Federal Nusa Metal Direct By GTA Jun. 97 - Jul. 97 Completed
59 Slitter line Kerawang Dismantling, Transportation & Re-Installing Slitter Line PT. Sarana Steel Center ( ITOCHU ) PT. OKA Int'l Logistama Aug. 97 Completed
60 JIG LINE Sunter Machine and JIGS Installation Work PT. Gaya Motor Direct By GTA Sep. 97 Completed
61 Machine Installation Karawang Drum Tester , Slip Tester Fabrication Work Hoist Fabrication PT. Toyota Astra Motor Direct By GTA Sep. 97 Completed
62 SDM Work Cilegon Fabrication, Shut Down Maintenance and Manpower Supply PT. Krakatau Steel ( Expansion & SDM ProjectPT.
) VOEST ALPINE DUTA Aug. 97 - Apr. 98 Completed

63 A.A.I Project Anyer Steel Structure Work PT. Nisshoku Tripolyta Acrylindo PT. SUMICON UTAMA Sept. 97 - Oct 97 Completed
64 A.A.I Project Anyer Equipment Modification Work PT. Nisshoku Tripolyta Acrylindo Mitsubishi Heavy Industries Oct. 97 - Apr 98 Completed
65 Painting Shop Cikampek Aluminum Painting Installation Work PT. Showa Aluminum Indonesia Direct By GTA Oct. 97 Completed
66 AJ-4 Project Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Sept. 97 - May 98 Completed
67 Injection Line Cibitung Injection M/C Installation Work, 1, 650 T & 1.250 T & 850 T PT. Showpla Indonesia NISSIN TRANSPORTATION Oct. 97 Completed
68 Office Fab. Shop Bojonegara Fabrication Shop Building PT. Guna Teguh Abadi Direct By GTA Jul. 97 - Aug 97 Completed
69 Wire Line Bekasi M/C Installation Work PT. Breaker Indonesia Direct By GTA Nov. 97 - Dec. 97 Completed
70 Machine Installation Bekasi Machine Installation Work PT. Sliontec Ekadharma Indonesia Direct By GTA Dec. 97 - Jul. 98 Completed
71 Injection Line Cibitung Injection M/C Installation Work,1.250 T & 850 T PT. Showpla Indonesia Konoike Engineering Mar. 98 Completed
72 Injection Line Cibitung Injection M/C Installation Work, 650 T PT. Showpla Indonesia NISSIN TRANSPORTATION Mar. 98 Completed
73 Injection Line Cibitung Injection M/C Installation Work, 1, 650 T & 1.250 T PT. Showpla Indonesia Konoike Engineering Apr. 98 Completed
74 PRESS MACHINE Cikampek Machine Installation Work PT. Towakogyo Indonesia Japan Trancity Apr. 98 Completed
75 SM-2 Project Bojonegara Erection and Mechanical Work (2000 Ton) PT. Styrindo Mono Indonesia MITSUBISHI HEAVY INDUSTRIES Apr. 98 - Aug. 99 Completed
76 G.O.P PROJECT Gersik Repair / Modification and Installation Work PT. Petro Kimia Gersik NIPPON EXPRESS CO. LTD. Jul. 98 - Aug. 98 Completed
77 Injection Line Cibitung Injection M/C Installation Work, 850 T PT. Showpla Indonesia Konoike Engineering Aug. 98 Completed
78 Conecting Rod Line Ciujung M/C Installation Work PT. Yasunaga Indonesia Japan Trancity Jul. 98 Completed
79 AJ 5-9 Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Jul. 98 Completed
80 SDM - Project Anyer Shut Down Maintenance Work PT. Nisshoku Tripolyta Acrylindo Direct By GTA Oct. 98 Completed

81 SDM - Project Anyer Shut Down Maintenance Work PT. Asahimas Chemical TAKADA KOGYO Oct. 98 Completed
2 of 21
Bontang,
82 AMJ-Project Heavy lift Erection Work PT. Pupuk Kaltim SHINWHA ENGINEERING Oct. 98 - Aug.99 Completed
Kalimantan
83 AJ - 5-9 Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Jan 99 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
84 SDM-Project Anyer Shut Down Maintenance Work PT. Nisshoku Tripolyta Acrylindo NCC Jan - Feb 99 Completed
85 RBS-Project Anyer Erection Work PT. Daelim Utama Construction Direct By GTA Feb. 99 Completed
86 AJ- 05 Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Feb ' 99 Completed
87 AJ- 05 Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Mar ' 99 Completed
88 Engine Line Bekasi Dismantling & Re-install of 14 Machine PT. Indomobil Suzuki International PT. OKA Int'l Logistama Mar '99 Completed
89 Machine Installation Cikarang Machine Installation Work PT. Sansyu Konoike Engineering Mar ' 99 Completed
90 SM-2 Project Bojonegara Commissioning Work PT. Styrindo Mono Indonesia MITSUBISHI HEAVY INDUSTRIES Mar ' - Jun' 99 Completed
91 OTP Project Anyer Erection Mechanical Work PT. Lautan Otsuka Chemical TAKADA KOGYO Jul - Dec 99 Completed
92 SDM - Project Merak Shut Down Maintenance Work PT. Bakrie Kasei Corporation TAKADA KOGYO Apr. - May ' 99 Completed

93 SDM - Project Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Apr. - May ' 99 Completed

94 RFCC SDM-Project Balongan Shut Down Maintenance Work PERTAMINA UP-VI BALONGAN PT. PERTAFENIKKI ENGIENERING Jul - Oct ' 99 Completed

95 SDM NTA ' 99 Anyer Shut Down Maintenance Work PT. Nisshoku Tripolyta Acrylindo NIIGATA / UNEFECO J.O. August '99 Completed

96 CA - 2 Project Anyer Shut Down Maintenance Work PT. Asahimas Chemical TAKADA KOGYO Oct ' 99 Completed

97 Change of H/E Anyer Shut Down Maintenance Work PT. Asahimas Chemical TAKADA KOGYO Oct ' 99 Completed
98 Transportation Anyer Transportation Work of 50 Ton Heat Exchanger PT. Asahimas Chemical TAKADA KOGYO Oct ' 99 Completed
99 SM - 2 Project Bojonegara Daily Maintenance PT. Styrindo Mono Indonesia Direct By GTA Sep. ~ Nov.'99 Completed
100 Machine Installation Cikande Machine Installation Work PT. Yasunaga Indonesia Direct By GTA Oct ' 99 Completed
101 SDM - Project Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Oct ' 99 Completed
102 Machine Installation Cibitung Machine Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Oct ' 99 Completed
103 Machine Installation Sunter Machine Installation Work PT. Pantja Motor Direct By GTA Oct ' 99 Completed
104 Dismantling Work Bandung Dismantling of Vacum Furnance, Machining Room & Gantry PT. UMC / IPTN Direct By GTA Oct ' 99 Completed
105 Moving / Installation Work Cilegon Over-Hauling, Re-Setting & Re-Alignment of Machines PT. Tjokro Putra Persada Direct By GTA Dec. '99 - Feb. 2000 Completed

106 H/E Repair Bojonegara Assist for Heat Exchanger Reparing Work PT. Styrindo Mono Indonesia PACKINOX Jan. 2000 - Feb. 2000 Completed

107 Maintenance Work Bojonegara Maintenance Work PT. Styrindo Mono Indonesia MITSUBISHI HEAVY INDUSTRIES Jan. 2000 - Feb. 2000 Completed

108 SDM Work Anyer Shut Down Maintenance Work PT. Nisshoku Tripolyta Acrylindo NIIGATA / UNEFECO J.O. Feb. 2000 Completed
M/C Installation (Expansion
109 Cibitung M/C Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Jan. ~ Dec. 2000 Completed
Project)
110 Machine Installation Cikarang M/C Installation Work PT. IK Precision Konoike Engineering Jan. 2000 Completed
111 Machine Installation Cikarang M/C Installation Work PT. Sansyu Konoike Engineering Jan./Feb. 2000 Completed
112 New Boiler Bandung BOILER Installation Work PT. Unilon Textile Industries TAKADA KOGYO Mar. 2000 Completed
113 Machine Installation Cibitung M/C. Installation Work PT. Aiwa Indonesia Direct By GTA Jun. 2000 Completed
114 Machine Installation Sunter M/C. Installation and Fabrication Work PT. Pantja Motor Direct By GTA May - Jun. 2000 Completed
115 Machine Installation Cikarang M/C. Installation Work PT. Sansyu Konoike Engineering Apr. - Jul. 2000 Completed
116 Machine Installation Cilegon M/C. Installation Work PT. Dresser Rand Service Indonesia Direct By GTA May - Jun. 2000 Completed
117 Modification Work Cibitung Painting Room Modification Work PT. Samatech Indonesia Direct By GTA Jun. 2000 Completed

118 SDM - Work Merak Shut-Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA May - Jun. 2000 Completed

119 SM2 - SDM Bojonegara Shut-Down Maintenance Work PT. Styrindo Mono Indonesia Mitsubishi Heavy Industries Jul. - Aug. 2000 Completed

120 SM2 - H/E. Repair Bojonegara Assist for Heat Exchanger Repairing Work PT. Styrindo Mono Indonesia Packinox Jul. 2000 Completed

121 SDM - Work Anyer Shut-Down Maintenance Work PT. Nisshoku Tripolyta Acrylindo NIIGATA / UNEFECO J.O. Jul. - Aug. 2000 Completed

122 Machine Installation Cibitung Press M/C Installation Work PT. Samatech Indonesia Marubeni Industrial Plant Aug, 2000 Completed
123 Machine Installation Sunter M/C Installation Work PT. Gaya Motor Direct By GTA Aug, 2000 Completed
3 of 21
124 Expansion - PJ Sunter Gravity Casting and Melting Furnace Installation Work PT. Astra Daihatsu Motor Direct By GTA Sept.2000 Completed
125 Expansion - PJ Cibitung M/C Installation Work PT. Riken Asahi Plastic UNEFECO Oct- Nov.2000 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
Bontang,
126 KPI- Project Heavy lift Erection Work PT. Pupuk Kaltim SHINWHA ENGINEERING Sept.2000 - Jan.2001 Completed
Kalimantan
127 E/Q INSTALLATION Tangerang Equipment Installation Work PT. Petsenia Resindo TAKADA KOGYO Dec. 2000 Completed
128 Machine Installation Cibitung M/C Installation Work PT. NSK Bearing Manufacturing Ind. Direct By GTA Jan - Jun 2001 Completed

129 Shut-Down Maintenance Anyer PTA & CTA Dryer Dismantling / RE-Installing Work PT. Polyprima Karyareksa Direct By GTA February 2001 Completed

130 Shut-Down Maintenance Anyer Acessories & Elelctrical Work PT. Polyprima Karyareksa Direct By GTA February 2001 Completed
Shut-Down Maintenance work UEB
131 Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Feb - Mar 2001 Completed
-3
132 Maintenance Work Merak Manpower Supply PT. Bakrie Diafoil TAKADA KOGYO Feb - Mar 2001 Completed

133 Routine Daily Maintenance Anyer Maintenance Work PT. Chandra Asri Petrochemical Direct By GTA 1st April '01 - 31 March '03 Completed
Bontang,
134 K-4 Project Heavy Lift Erection Work Phase-1 & Phase-2 PT. Pupuk Kaltim PT. Rekayasa Industri ( Persero) May '01 - Mar '02 Completed
Kalimantan
135 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA April'01 Completed

136 Machine Installation Pondok Ungu Press M/C Installation Work PT. Indopack Pratama Direct By GTA May'01 Completed
137 Machine Installation Cibitung M/C Installation Work PT. Yamatogomu Indonesia Japan Trancity May'01 Completed

138 Shut-Down Maintenance Anyer Maintenance Work PT. Chandra Asri Petrochemical Direct By GTA June-July'01 Completed

139 Machine Installation Cibitung Press M/C Installation Work PT. Pan-Sadoshima Direct By GTA June'01 Completed
140 ASC Phase IV Project Anyer Erection Work PT. Asahimas Chemical TAKADA KOGYO Aug'01 ~ Mar'02 Completed
141 IBP-3 Project Tangerang Erection Work PT. Petnesia Resindo PT. Catur Niki June-Nov'01 Completed
142 Machine Installation Kerawang M/C Installation Work PT. Freyabadi Indotama PT. Rakintam July'01 Completed
143 Machine Relocation Kerawang M/C Relocation & Installation PT. Freyabadi Indotama PT. Rakintam August'01 Completed

144 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA July'01 Completed

145 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA August'01 Completed

146 SMT Project Cikarang Unloading & Rough Setting of Machine at PT. SMT PT. SMT-Indonesia PT. Nittsu Lemo Indonesia Logistik August '01 Completed

147 Laminating Line Bogor Dismantling & Re-installation Work of Machine PT. Lintec Indonesia Direct By GTA August '01 Completed

148 Machine Installation Sunter Installation of Tank and Machine PT. Tancho Mandom PT. Rakintam August '01 Completed
149 AJ9 B Project Cibitung Relocation & Installation of Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA August '01 Completed
150 Machine Installation Bekasi Installation of Machine PT. Pan-Sadoshima Components Direct By GTA August '01 Completed
151 Flare Stack Work Anyer Repair Work for Flare Stack PT. Chandra Asri Petrochemical Takada Kogyo September '01 Completed

152 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Sulfindo Adiusaha Direct By GTA September '01 Completed

153 Machine Installation Cikande Relocation of Machine & Stage Modification PT. Yasunaga Indonesia Direct By GTA September '01 Completed
154 Pump Installation Anyer Installation of Pump PT. Chandra Asri Petrochemical Takada Kogyo September '01 Completed
155 Laminating Line Bogor Installation of Press Machine PT. Lintec Indonesia Direct By GTA September '01 Completed
156 Machine Relocation Cikarang Relocation & Installation of Machine PT. Indonesia Epson Industry PT. Nittsu Lemo Indonesia Logistik September '01 Completed
157 LOC Project Anyer Remove & Re-installation of Evaporator (REF-932) PT. Lautan Otsuka Chemical Takada Kogyo September '01 Completed

158 LOC Project Anyer Shut Down Maintenance Work PT. Lautan Otsuka Chemical Takada Kogyo October '01 Completed

159 Machine Installation Anyer Installation Work PT. Polyprima Karyareksa Direct By GTA October '01 Completed

160 Dism. & Trans. of Kanagata Cikarang Dismantling & Transportation of Kanagata PT. Konoike Transport Indonesia Direct By GTA October '01 Completed

161 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Oct. ~ Dec. 01 Completed

162 Machine Installation Cikarang Installation of Machine PT. Indonesia Epson Industry PT. Nittsu Lemo Indonesia Logistik November '01 Completed
163 Machine Installation Bogor Installation of Machine PT. NGK Busi Indonesia PT. Nittsu Lemo Indonesia Logistik November '01 Completed
164 Machine Installation Cibitung Installation of Machine PT. Alpha Industri PT. Konoike Transport Indonesia November '01 Completed
4 of 21
165 Load & Unload Clarifier Anyer Loading & Unloading Clarifier PT. Polyprima Karyareksa Direct By GTA November '01 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
166 Machine Installation Karawang Installation of Machine Compressor PT. FCC Indonesia PT. Kaliguma Transindo November '01 Completed
167 Laminating Line Bogor Installation of Press Machine PT. Lintec Indonesia Direct By GTA Nov. ~ Dec. '01 Completed
168 Machine Installation Cibitung Assembly & Installation of Machine PT. YKK PT. Rakintam December '01 Completed
169 Machine Installation Sunter Dism., Trans. & Installation of Machine TOYOTA PT. Rakintam December '01 Completed
PT. Matsushita Kotobuki Electronics
170 Conveyor Installation Cibitung Installation of Conveyor for TV Assembling Line PT. Rakintam Dec. '01 & Feb. '02 Completed
Industris Indonesia
171 AJ9 B/W Project Cibitung Unloading & Installation of Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA December '01 Completed
172 Hot Plate Mc. Replacement Pondok Ungu Replacement of Hot Plate Machine Parts PT. Indopack Pratama Direct By GTA December '01 Completed
173 Pilot Plant 2001 Merak Machine Installation & Piping Work for MCCI Pilot Plant 2001 PT. Mitsubishi Chemical Indonesia Takada Kogyo Dec. '01 ~ Jan. '02 Completed
Fabrication & Installation of Walkway and Fence for Electrolyzer
174 ASC Phase IV Project Anyer PT. Asahimas Chemical Takada Kogyo Jan~Feb. '02 Completed
on Cell Room
175 Fab. & Inst. Of Loading Trailer Bandung Fabrication & Installation of Loading Trailer PT. Aichi Tex Indonesia Direct By GTA Jan. '02 Completed

176 Machine Installation Cibitung Installation of Machine PT. Alpha Industri PT. Konoike Transport Indonesia Jan. '02 Completed

177 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Jan. '02 Completed

178 Machine Installation Bekasi Unloading & Installation of Press Machine PT. Kotera Indonesia PT. Nittsu Lemo Indonesia Logistik Jan. '02 Completed
179 Machine Installation Cikarang Installation of New Machine & Relocation Work PT. Sansyu PT. Rakintam Feb. '02 Completed
180 Machine Over Haul Cibitung Over Haul of Calender Machine (Roll No. 3 & 4) PT. Sliontec Ekadharma Indonesia Direct By GTA Feb. '02 Completed
181 2AAJB/1 Project Cibitung Unloading & Installation of Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA Feb. '02 Completed
Unloading, Rough Installation of Component parts & Machinery
182 Machine Installation Bogor PT. NGK Busi Indonesia PT. Nittsu Lemo Indonesia Logistik Feb. '02 Completed
Parts
183 GTG Installation Bontang Gas Turbine Generator Installation Work PT. Pupuk Kaltim PT. Rekayasa Industri ( Persero) Feb. ~ April'02 Completed

184 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Feb. '02 Completed

185 Machine Installation Cikarang Installation of Machine PT. Sansyu PT. Konoike Transport Indonesia Feb. '02 Completed
186 Machine Relocation Bekasi Relocation & Installation of Machine PT. Nesinak Industri Direct By GTA Mar. '02 Completed
187 CAPC Project Anyer Install New Treated Water Supply Facility in Utility Plant PT. Chandra Asri Petrochemical Direct By GTA Mar. '02 Completed
188 CAPC Project Anyer Install New Raw C4 Line for Fuel Gas PT. Chandra Asri Petrochemical Direct By GTA Mar. '02 Completed

189 Shut-Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA Mar. '02 Completed
PT. Matsushita Kotobuki Electronics
190 Conveyor Installation Cibitung Installation of Conveyor for TV Assembling Line PT. Rakintam Mar. '02 Completed
Industris Indonesia
191 Conveyor Installation Cikarang Fab. Lifter & Align of Conveyor for TV Assembly Line PT. Sanyo Nippon Express (Singapore) Mar. '02 & Apr. '02 Completed
192 2AJB/3 & 2AJB/4 Pro Cibitung Unloading & Installation of Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA Mar. '02 Completed
193 Machine Installation Bandung Machine Installation Work PT. Aichi Tex Indonesia Direct By GTA Mar. '02 Completed
194 SM2 R Project Merak Erection Work and HE Packinox Replacement PT. Styrindo Mono Indonesia NIPPON EXPRESS CO. LTD. Apr. ~ Jun '02 Completed
195 CP Plant Tangerang Heater Dismantling and Reinstall Work PT. Teijin Fiber Indonesia/ TEIJIN Direct By GTA Apr. ~ May '02 Completed
196 Machine Installation Cibitung Unloading, Unpacking & Installation of Machine AJ9/8 PT. NSK Bearing Manufacturing Ind. Direct By GTA May '02 Completed
197 Machine Installation Cibitung Unloading, Unpacking, Installation, Centering & Leveling PT. NSK Bearing Manufacturing Ind. Direct By GTA May '02 Completed
198 Machine Installation Cikarang Unloading & Installation of Injection Molding Machine PT. IK Precision PT. Konoike Transport Indonesia May '02 Completed
199 Machine Installation Cikande Machine Installation Work PT. Yamatogawa Indonesia Direct By GTA May '02 Completed

200 Shut Down UAB #1, UAB#2 Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA May '02 Completed

201 Gas Booster Station PJ Rengat (KP-276) Mechanical Erection Work, Piping & Steel Structure Works PERUSAHAAN GAS NEGARA PT. Rekayasa Industri ( Persero) May ~ Nov '02 Completed

202 Laminating Line Bogor Installation of Fitmate Machine PT. Lintec Indonesia Direct By GTA June '02 Completed
203 Chandra Asri PJ Anyer Catalyst Replacement of C4/C5 Hydrogenation Reactor PT. Chandra Asri Petrochemical Direct By GTA Aug '02 Completed
204 Machine Installation Anyer Installation of HTM Burner Economizer PT. Polypet Karyapersada Direct By GTA Sep '02 Completed
205 Machine Installation Karawang Unloading, Unpacking, Installation, Centering & Leveling PT. Kaneda Indonesia PT. Nittsu Lemo Indonesia Logistik August '02 Completed
206 Machine Installation Cikarang Installation of Injection Machine PT. IK Precision PT. Konoike Transport Indonesia August '02 Completed
Loading the Injection Molding Machine on the Pallet the
207 Aiwa Electronic Sukabumi PT. Aiwa5 Indonesia
of 21 PT. Kaliguma Transindo August '02 Completed
container
208 Relocation Work Cibitung Relocation of GR Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA August '02 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
209 Shut-Down Maintenance Merak Shut Down Maintenance Work (September 2002) PT. Sulfindo Adiusaha Direct By GTA September '02 Completed
210 Machine Installation Cibitung Installation, Unloading, Installation, Centering & Leveling PT. Nojima Chemical PT. Konoike Transport Indonesia September '02 Completed
Mechanical Work CTA 1 RRD-2 Pilot Plan Project (Steel
211 Fabrication Work Merak Mitsubishi Chemical Corporation Ind Takada Duta Waskita Baja J/O Sep-Oct '02 Completed
Structure)
Mechanical Work CTA 1 RRD-2 Pilot Plan Project (Mechanical
212 Erection Work Merak Mitsubishi Chemical Corporation Ind Takada Duta Waskita Baja J/O Sep-Oct '02 Completed
Work)
213 Shut-Down Maintenance Merak PTA-1 Periodical Work PSDM 2002 Mitsubishi Chemical Corporation Ind Takada Duta Waskita Baja J/O Sep-Oct '02 Completed

214 Shut Down Maintenance Merak Shut Down Maintenance PT. Unggul Indah Cahaya Tbk. Direct By GTA Sep '02 Completed

215 Maintenance Work Anyer Maintenance Work at PT. Lautan Otsuka Chemical Mitsubishi Chemical Corporation Ind Takada Duta Waskita Baja J/O October'02 Completed
216 Erection Work Anyer Removal & Reinstallation of Heat Exchanger VCM 2 PT. Asahimas Chemical Takada Duta Waskita Baja J/O October'02 Completed
217 Laminating Line Bogor Dismantle of Extruder and Laminating Machine PT. Lintec Indonesia Direct By GTA October'02 Completed
218 Machine Installation Cibitung Unloading & Installation of Machine PT. Meiwa Mold Indonesia PT. Naditama-Trancy Logistics Ind October '02 Completed
219 Machine Installation Bekasi Installation of Kneeder Machine PT. Sliontec Ekadharma Indonesia Direct By GTA October'02 Completed
220 Press Machine Line Bekasi Installation of Press Machine PT. Sunstar PT. Konoike Transport Indonesia October'02 Completed
221 Furnace Line Bekasi Unloading, Unpacking & Installation of Furnace PT. Kwang Hwa Shing Industrial Direct By GTA October'02 Completed
222 CA2 Plant Anyer Removal and Installation of Tower for CA-2 Plant PT. Asahimas Chemical Takada Duta Waskita Baja J/O October'02 Completed
223 Machine Installation Bekasi Installation of Sumitomo Injection Molding Machine PT. Honoris Indonesia PT. Konoike Transport Indonesia November'02 Completed
224 Machine Installation Cibitung Remove, Relocation and Installation of Machine Panasonic Gobel PT. Rakintam December '02 Completed
225 Furnace Installation Bekasi Installation of Machine PT. Kwang Hwa Shing Industrial Direct By GTA December '02 Completed
226 Maintenance Work Bekasi Replacement of Roll Calendar Machine PT. Sliontec Ekadharma Indonesia Direct By GTA January '03 Completed
Turn Around Maintenance '2003 for Mechanical (Including :
227 Shut Down Maintenance Anyer PT. Chandra Asri Petrochemical Direct By GTA Jan ~ Mar '03 Completed
Planning, Technical & Scheduling).
228 Shut Down Maintenance Anyer Replacement of 3 Unit of TLE PT. Chandra Asri Petrochemical Direct By GTA Jan ~ Mar '03 Completed
229 Machine Installation Cibitung Relocation Work of LA Machine and GR Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA January '03 Completed
230 Machine Installation Cibitung Installation of AJ10B Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA February '03 Completed

231 Machine Installation Cibitung Installation of Injection Molding Machine (1650Ton & 1300Ton) PT. Oriental Kyowa Industries Direct By GTA February '03 Completed

232 Machine Installation Karawang Installation of Machine PT. E-Pack Indonesia PT. Konoike Transport Indonesia February '03 Completed
Replacement of Flare Tip and Muffler of LLDPE Flare Stack L-
233 Shut Down Maintenance Anyer PT. Chandra Asri Petrochemical Direct By GTA Jan ~ Mar '03 Completed
8931
234 Machine Installation Cikarang Installation of Injection Machine PT. IK Precision Direct By GTA March '03 Completed
235 Shut Down Maintenance Anyer Pall Ring Replacement of Caustic/ Water Wash Tower PT. Chandra Asri Petrochemical Direct By GTA March '03 Completed
236 Machine Installation Cibitung Installation of AJ10B/2F and AJ09B/A Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA March '03 Completed
Installation of Injection Molding Machine (1300Ton, 800Ton &
237 Machine Installation Cibitung PT. Oriental Kyowa Industries Direct By GTA March '03 Completed
600Ton)
238 Machine Installation Karawang Installation of Forging Machine PT. Kaneta Indonesia PT. Nittsu Lemo Indonesia Logistik March '03 Completed
Installation of 1,650Ton, 500Ton, 800Ton Die Casting Machine,
239 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik Feb~Apr '03 Completed
Holding Furnish
Installation of Dowa Furnce & Accessories include Floor
240 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik April'03 Completed
Protection, DC-12 Machine.
241 Machine Installation Cikampek Installation of Die Saperate & Turne Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik April'03 Completed
242 Machine Installation Bogor Installation of BW Machine and BW-5 PT. Lintec Indonesia Direct By GTA April'03 Completed
Installation of Equipment DA 38A Welding 1st Step, Moving Zig
243 Machine Installation Sunter PT. Astra Daihatsu Motor Direct By GTA April'03 Completed
Equipment Zebra
244 Silo Installation Tangerang Installation of Silo PT. Pamindo Tiga T Direct By GTA April'03 Completed
245 Machine Installation Cibitung Relocation of GR Machine (SF & NT-3C) PT. NSK Bearing Manufacturing Ind. Direct By GTA April'03 Completed
246 Piping Work Cikampek Piping Work PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik April'03 Completed
247 Machine Installation Cikande Installation of Machining Line for Daihatsu Parts. PT. Yasunaga Indonesia PT. Naditama-Trancy Logistics Ind May'03 Completed
248 Machine Installation Sunter Installation of Equipment DA 38A Welding 2nd Step PT. Astra Daihatsu Motor Direct By GTA May'03 Completed
249 Machine Installation Cibitung Machine Installation PT. NSK Bearing Manufacturing Ind. Direct By GTA May'03 Completed
6 of 21
250 Shut Down Maintenance Merak Open and Close Channel Cover for Heat Exchanger PT. Sentra Sentika Jaya PT. Semanggi Technic Utama June'03 Completed
251 Machine Installation Cikampek Installation of 200Ton & 300Ton Press Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik June'03 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
252 Shut Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA June~July'03 Completed
253 Machine Installation Bogor Installation of Machine BW-05, BW-016 & BW-17 PT. Lintec Indonesia Direct By GTA July'03 Completed
254 Relocation Work Cikampek Relocation of Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik July'03 Completed
Installation of Injection Molding Machine (1600Ton, 800Ton,
255 Machine Installation Cibitung PT. Oriental Kyowa Industries Direct By GTA July'03 Completed
200Ton)
256 Machine Installation Merak Installation of Equipment for DS Project PT. Standard Toyo Polymer Direct By GTA July'03 Completed
257 Machine Installation Cikande Installation of Machining Line for Toyota Parts PT. Yasunaga Indonesia PT. Naditama-Trancy Logistics Ind July'03 Completed
258 Erection and Mechanical Work Subang Mechanical Erection Work for Subang CO2 Removal Project PERTAMINA DOH JAWA BAGIAN BARAT PT. Rekayasa Industri ( Persero) July ~ Nov'03 Completed
259 Heavy Lifting Work Subang Heavy Lifting Work for Subang CO2 Removal Project PERTAMINA DOH JAWA BAGIAN BARAT PT. Rekayasa Industri ( Persero) July~Aug'03 Completed
260 Shut Down Maintenance Balongan Mechanical Issue T/A RCC Pertamina UP-VI Balongan PERTAMINA UP-VI BALONGAN Direct By GTA July~Oct'03 Completed
261 Fabrication Work Karawang Fabrication of T-6 Furnace Base PT. Astra Daihatsu Motor Sanken Sangyo Co., Ltd August '03 Completed
Fabrication and Installation of Cooling Water System and
262 Machine Installation Cibitung PT. Sunstar PT. Konoike Transport Indonesia August'03 Completed
Installation of Quiching Machine
Installation of Machine and Remove and Reinstall of Ban Bury
263 Machine Installation Bekasi PT. Rapindo PT. Unefeco August'03 Completed
Mixer
264 Machine Installation Cikampek Installation of Washing Machine & Carved Seal Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Lemo Indonesia Logistik August'03 Completed
265 Machine Installation Cibitung Installation of Injection Machine PT. Meiwa Mold Indonesia PT. Naditama-Trancy Logistics Ind August'03 Completed
266 Machine Installation Cibitung Installation of Injection Molding Machine PT. Oriental Kyowa Industries Direct By GTA August'03 Completed
267 Machine Installation Cibitung Machine Relocation PT. NSK Bearing Manufacturing Ind. Direct By GTA September'03 Completed
268 Machine Installation Cibitung Installation of Injection Molding Machine PT. Meiwa Mold Indonesia PT. Naditama-Trancy Logistics Ind September'03 Completed
269 Pump Alignment Sakernan Final Alignment and Testing for Raw Water Pump PERUSAHAAN GAS NEGARA PT. Rekayasa Industri ( Persero) September'03 Completed
270 Machine Installation Cibitung Installation of Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA October'03 Completed
271 Machine Installation Cibitung Installation of 300Ton Press Machine PT. Sunstar PT. Konoike Transport Indonesia October'03 Completed
272 Machine Installation Cikande Disamantling and Installation of OP-200 and OP-220 Machine PT. Yasunaga Indonesia PT. Naditama-Trancy Logistics Ind October'03 Completed
273 Machine Installation Bekasi Replacement of Roll Calendar Machine PT. Sliontec Ekadharma Indonesia Direct By GTA October'03 Completed

274 Machine Installation Bekasi Unloading, Unpacking, Sliding Inside and Installation of Machine PT. Nesinak Industri Direct By GTA November'03 Completed

275 Machine Installation Bekasi Unloading, Unpacking, Sliding Inside and Installation of Machine PT. IK Precision PT. Konoike Transport Indonesia November'03 Completed

276 Machine Installation Sunter Remove, Sliding and Reinstallation of Machine PT. Astra Daihatsu Motor Direct By GTA November'03 Completed

277 Machine Installation Cibitung Unloading, Unpacking, Sliding Inside and Installation of Machine PT. Meiwa Mold Indonesia PT. Naditama-Trancy Logistics Ind November'03 Completed

278 Pump Alignment Sakernan Final Alignment of 2 Unit of Raw Water Pump PERUSAHAAN GAS NEGARA PT. Rekayasa Industri ( Persero) December '03 Completed

279 Machine Installation Bekasi Unloading, Unpacking, Sliding Inside and Installation of Machine PT. IK Precision PT. Konoike Transport Indonesia December '03 Completed

Unloading, Unpacking, Sliding Inside, Installation, Centering and


280 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia December '03 Completed
Leveling of L Side Cover
281 Pump Alignment Subang Final Alignment of Pump for CO2 Removal Project PERTAMINA DOH JAWA BAGIAN BARAT PT. Rekayasa Industri ( Persero) December '03 Completed
Unloading, Unpacking, Installation, Centering, Leveling and
282 Machine Installation Bekasi PT. Sliontec Ekadharma Indonesia Direct By GTA December '03 Completed
Setting Accessories of Roll Calendar Machine
283 Machine Installation Cikampek Unloading, Unpacking, and Installation of Fice Line Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia December '03 Completed
284 Machine Installation Bogor Installation of BC-2 & BC-4 Machine PT. Lintec Indonesia Direct By GTA December '03 Completed
285 Relocation Work Bekasi Relocation of Lathing 16 MAG -8 Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA January '04 Completed
Jack Up-Down and Alignment of Valve Body Area Machines,
286 Machine Alignment Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia January '04 Completed
Transfer Machine & Case Area Machine
Installation of Machine at PT. Systech Indonesia 1shipment ~
287 Machine Installation Subang PT. Systech Indonesia PT. Nittsu Lemo Indonesia Logistik January ~ May '04 Completed
13th Shipment
Unloading, Installation and Relocation of Machine at
288 Machine Installation Sunter PT. Astra Daihatsu Motor Direct By GTA January '04 Completed
Transmission Line & Relocation of Cylinder Block of Machine
289 Machine Installation Bekasi LA Machine & FGX-2500N Machine Installation PT. NSK Bearing Manufacturing Ind. Direct By GTA January '04 Completed
Unloading, Unpacking, Sliding Inside, Installation, Alignment &
290 Machine Installation Bekasi PT. Sliontec Ekadharma Indonesia Direct By GTA January '04 Completed
Setting Accessories for Rewind Machine
7 of 21
291 Machine Installation Bekasi Unloading, Unpacking, Sliding Inside and Installation of Machine PT. Nesinak Industri Direct By GTA January '04 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
292 Machine Installation Cibitung Unloading, Unpacking, Sliding Inside and Installation of Machine PT. Sumco Indonesia PT. Nittsu Lemo Indonesia Logistik January '04 Completed
Unloading, Unpacking, Installation of Center Less Line Machine
293 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia January '04 Completed
including Alignment & Setting Accessories
Unloading, Unpacking, Installation of Machine for Water Jet and
294 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia January '04 Completed
Polisher including Alignment & Setting Accessories
295 Machine Installation Cikampek Unloading & Unpacking of Die Casting Machine Shipment-1 & 2 PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia January '04 Completed
Unloading, Unpacking and Installation of Forging Machine
296 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia January '04 Completed
including Alignment and Setting Accessories
297 Machine Installation Cikande Installation of Machine Line FX. 4 PT. Yasunaga Indonesia Direct By GTA February '04 Completed
Installation of Die Casting Machine 1250t Type Yamaha Pj.
298 Machine Installation Karawang PT. Yamaha Indonesia PT. Nittsu Shoji Indonesia February '04 Completed
Karawang
299 Machine Installation Bekasi Remove, Transport & Reinstall of Motor PT. NSK Bearing Manufacturing Ind. Direct By GTA February '04 Completed
Unloading, Unpacking, Replacement of Miss Collector including
300 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia February '04 Completed
Alignment and Setting Accessories
301 Machine Installation Bekasi Installation of Plastic Injection Molding Machine 3 Units PT. IK Precision PT. Konoike Transport Indonesia February '04 Completed
302 Relocation Work Karawang Relocation of Drilling Machine PT. Kaneta Indonesia PT. Nittsu Shoji Indonesia February '04 Completed
Mechanical and Steel Structure Erection Work for Blue Sky
303 Erection and Mechanical Work Balongan PERTAMINA PLBB BALONGAN PT. Rekayasa Industri ( Persero) Feb '04 ~ Feb'05 Completed
Balongan Project
304 Heavy Lifting Work Balongan Heavy Lifting Work for Blue Sky Balongan Project. PERTAMINA PLBB BALONGAN PT. Rekayasa Industri ( Persero) May ~ Aug'04 Completed
305 Machine Installation Bekasi Replacement of Roll Calendar Machine PT. Sliontec Ekadharma Indonesia Direct By GTA March '04 Completed

Unloading/ Unpacking/ Assembling & Secondary Wiring of Piping


306 Machine Installation Cibitung PT. ISI / SUZUKI PT. Kaliguma Transindo March '04 Completed
Re-Hook Up 1 Set of Amino 200Ton Hydraulic Press Machine.

307 Machine Installation Sidoarjo Unloading, Unpacking & Installation Machine PT. Hisamitshu Pharmacy PT. Konoike Transport Indonesia March '04 Completed
308 Modification Work Sunter Modification Travel Line (Pentaghrap) PT. Astra Daihatsu Motor Direct By GTA March '04 Completed
309 Relocation Work Cikampek Disamantling & Reinstallation Acc. Six Index Mo - Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia March '04 Completed
310 Shut Down Maintenance Merak Shut Down Maintenance Work PT. Unggul Indah Cahaya Tbk. Direct By GTA March'04 Completed
311 Machine Installation Karawang Installation of Electrical for Die Casting Machine 1250Ton PT. Yamaha Indonesia PT. Nittsu Shoji Indonesia March '04 Completed
312 Machine Installation Serpong Unloading and Installation of Machine PT. Puspitech PT. Nittsu Lemo Indonesia Logistik April '04 Completed
313 Machine Installation Cikampek Installation of OKK PV-400 NC PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia April '04 Completed

314 Machine Installation Cibitung Unloading, Unpacking, Sliding Inside and Installation of Machine PT. Kawashima Engineering Plastic PT. Konoike Transport Indonesia April '04 Completed

315 Machine Installation Cikarang Unloading, Unpacking, Sliding Inside and Installation of Machine PT. Ingress Malindo Venture PT. Nittsu Lemo Indonesia Logistik April '04 Completed
Disconnecting, Replacement Bearings, Reinstallation & Setting
316 Machine Installation Bekasi PT. Sliontec Ekadharma Indonesia Direct By GTA April '04 Completed
accessories for AC and Kneeder Machine
317 Machine Installation Bekasi Unloading, Unpacking & Installation of Machine PT. Asmo Indonesia PT. Konoike Transport Indonesia April '04 Completed
318 Machine Installation Cikarang Unloading, Unpacking & Installation of Machine PT. Sanyo Jaya Component PT. Nittsu Lemo Indonesia Logistik April '04 Completed
319 Machine Relocation Sunter Relocation of all Machines from Sunter to Karawang PT. Honda Prospect Motor PT. Nittsu Shoji Indonesia April ~ June'04 Completed
320 Machine Installation Cikampek Installation of New Primary Line Driven Gear PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia April~ June '04 Completed
321 Fabrication Work Karawang Fabrication of Bracket for Machine for Honda Prospect Project PT. Honda Prospect Motor PT. Nittsu Shoji Indonesia May'04 Completed
322 Machine Installation Cikarang Unloading, Open Case, Shifting and Machine Installation PT. ASTOM PT. Nittsu Lemo Indonesia Logistik June'04 Completed
323 Machine Installation Cibitung Installation of Machine PT. Alpha Industri PT. Konoike Transport Indonesia June'04 Completed
324 Machine Relocation Cikande Relocation of Machine OP-70 & OP-14 PT. Yasunaga Indonesia Direct By GTA June'04 Completed
325 Machine Installation Cikarang Unloading, Unpacking & Installation of Machine PT. S-IK Indonesia PT. Konoike Transport Indonesia June'04 Completed
326 Machine Installation Cikarang Unloading, Unpacking & Installation of Machine PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia June'04 Completed
327 Machine Installation Cikarang Unloading, Open Case, Shifting and Machine Installation PT. Toyo Seal Indonesia PT. Nittsu Lemo Indonesia Logistik June'04 Completed
Installation of AP Machine, Installation Injection Machine &
328 Machine Installation Cibitung Relocation of Sigo Machines. & Installation of XMW-80A & ASM- PT. NSK Bearing Manufacturing Ind. Direct By GTA June'04 Completed
500 ZR Machine
329 Machine Installation Bekasi Remove and Change Roller PT. Sliontec Ekadharma Indonesia Direct By GTA June'04 Completed
8 of 21
330 Machine Installation Subang Installation of Machine at PT. Systech Indonesia 14th Shipment PT. Systech Indonesia PT. Nittsu Lemo Indonesia Logistik June'04 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
Heavy Lift, Erection and Mechanical Work for Tuban Aromtics : PT. PERTAFENIKKI ENGINEERING/ JGC
331 Erection and Mechanical Work Tuban PT. Trans Pacific Petrochemical Indotama July '04 ~ Nov '05 Completed
Aromatic Facility Plant Project. CORPORATION
332 Machine Installation Cibitung Unloading, Upacking and Installation of Tobe Machine PT. Keihin Indonesia PT. Nittsu Shoji Indonesia July'04 Completed
333 Machine Installation Cibitung Unloading, Upacking and Installation of Machine PT. Yamatori Indonesia PT. Nittsu Lemo Indonesia Logistik July'04 Completed
334 Machine Installation Karawang Unloading, Upacking and Installation of Machine PT. Atsumitech PT. Nittsu Lemo Indonesia Logistik July'04 Completed
335 Machine Relocation Sunter Relocation of Housing Clutch Machine PT. Astra Daihatsu Motor Direct By GTA August '04 Completed
336 Transportation Cibitung Transport machine for moving moving inside factory PT. Toyo Ink Indonesia PT. Daiko Buana Prima August '04 Completed
337 Machine Installation Bekasi Remove and Reinstall of Kneeder Machine PT. Sliontec Ekadharma Indonesia Direct By GTA August '04 Completed
Unloading, Unpacking and Installation and Leveling of Tai Tong
338 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia August'04 Completed
Machine
Unloading, Unpacking, Sliding Inside, Centering & Leveling of
339 Machine Installation Karawang PT. Atsumitech PT. Nittsu Lemo Indonesia Logistik August'04 Completed
Machine
340 Machine Relocation Karawang Relocation, Reinstallation and Leveling Machine at FCC PT. FCC Indonesia PT. Nittsu Shoji Indonesia October'04 Completed
341 Machine Relocation Cikande Relocation Machine Flexible Machine 4 PT. Yasunaga Indonesia Direct By GTA October'04 Completed
342 Machine Relocation Cibitung Relocation of Lathing Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA Oct ~ Nov'04 Completed
Erection Work for Equipment Shelter HA2 and HA3 for Tuban PT. PERTAFENIKKI ENGINEERING/ JGC
343 Erection and Mechanical Work Tuban PT. Trans Pacific Petrochemical Indotama Oct '04~ June'05 Completed
Aromatics Project CORPORATION
344 Machine Relocation Kerawang Dismantling, Relocation and Reinstall Machine PT. Freyabadi Indotama Direct By GTA December '04 Completed
Remove and Reinstall Machine from PT. Yamaha MFG to PT.
345 Machine Relocation Pulogadung PT. Yamaha Indonesia PT. Konoike Transport Indonesia December'04 Completed
Ihara MFG Indonesia
346 Machine Installation Cikampek Installation of New Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Nov ~ Dec'04 Completed
347 Machine Installation Cikarang Unloading, Unpacking and Installation of Machine PT. ASTOM PT. Nittsu Lemo Indonesia Logistik Nov ~ Dec'04 Completed
348 Erection and Mechanical Work Tuban Mechanical Erection Tuban Aromatic Project for Utility Plant PT. Trans Pacific Petrochemical Indotama Pers. WIKA ADHI KARYA IKPT JO Dec'04 ~ Dec'05 Completed
349 Machine Installation Cikampek Unloading, Unpacking and Installation of Machine PT. Univance Indonesia PT. Nittsu Lemo Indonesia Logistik Dec'04 Completed
Unloading, Unpacking, Sliding Installation, Centering & Leveling
350 Machine Installation Cibitung PT. Omron Indonesia PT. Nittsu Lemo Indonesia Logistik Dec'04 Completed
for Machine
351 Machine Installation Karawang Installation of Blowmolding Machine PT. Kyoraku Blowmoulding Machine PT. Konoike Transport Indonesia Dec'04 Completed
Relocation and Installation of Machine of GR and LA Machine
352 Machine Relocation Cibitung PT. NSK Bearing Manufacturing Ind. Direct By GTA Dec'04 ~ Sep'05 Completed
including Compressor Motor
353 Machine Relocation Cikarang Remove and Reinstallation of Machine PT. Atsumi Indonesia PT. Konoike Transport Indonesia Dec'04 Completed
354 Mechanical Installation Subang Gasket Replacement of MDA Pump PERTAMINA DOH JAWA BAGIAN BARAT PT. Rekayasa Industri ( Persero) Dec'04 Completed
355 Machine Installation Bekasi Replacement of Roll Calendar Machine PT. Sliontec Ekadharma Indonesia Direct By GTA Jan'05 Completed
356 Mechanical Installation Tuban Installation of Add. Stiffener Plate PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Jan'05 Completed
357 Machine Relocation Tuban Relocation of Convection Modules PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Feb'05 Completed
358 Machine Installation Bekasi Installation of New Machine PT. Sliontec Ekadharma Indonesia Direct By GTA Mar'05 Completed
359 Machine Installation Karawang Installation of New DC1250Ton Machine PT. Yamaha Motor Indonesia PT. Nittsu Shoji Indonesia Mar'05 Completed
Assist Equipment Nozzle Inspection including Inspection of
360 Mechanical Inspection Tuban PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Mar'05 Completed
Ebara and Niigata Pump
Temporary Cover Open & Close for Header Box and Top Area of
361 Machine Installation Tuban PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Mar'05 Completed
Convection Modules
362 Machine Installation Tuban Installation of Nikkiso Pumps PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Mar'05 Completed
363 Mechanical Installation Tuban Scaffoling Work for Remachining Flange Nozzle PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Mar'05 Completed
364 Mechanical Installation Tuban Install Duct Padding and Achoring Welding Works PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Mar'05 Completed
Mechanical Erection Work for Water Treatment Package for
365 Mechanical Erection Work Tuban PT. Trans Pacific Petrochemical Indotama PT. METITO Indonesia Mar~Aug'05 Completed
Tuban Aromatic Project
Reconstruction 32-F & Maintenance Assitance for Mechanical
366 Maintenance Work Anyer PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) Apr ~ Sep'05 Completed
Work
367 Machine Installation Sunter Installation Material for E-90 Body Shop Set Up PT. Gaya Motor Direct By GTA April ~ May'05 Completed
368 Machine Installation Bekasi Replacement of Roll Calendar Machine PT. Sliontec Ekadharma Indonesia Direct By GTA May'05 Completed
369 Machine Installation Cikarang Unloading, Unpacking and Installation for Tapping Machine PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia May'05 Completed
370 Modification Work Tuban Discharging and Modification of Dredging Equipment PT. Boskalis International Indonesia Direct By GTA May'05 Completed
Installation for New Agitator and PTA Dreier Steam and Coloumn 9 of 21
371 Shut Down Maintenance Anyer PT. Polyprima Karyareksa Direct By GTA June ~ July'05 Completed
Internal Replacement
372 Shut Down Maintenance Anyer Maintanance Work at CTA Drier PT. Polyprima Karyareksa Direct By GTA June ~ July'05 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
373 Shut Down Maintenance Anyer Overhaul Cooler PT. Polyprima Karyareksa Direct By GTA June ~ July'05 Completed
374 Machine Installation Yasunaga Installation of Flexible Line 4 ~ 7 Machine PT. Yasunaga Indonesia Direct By GTA June~July'05 Completed
375 Machine Installation Cikampek Installation of Heat Treatment Dowa Furnace PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia June~July'05 Completed
376 Machine Installation Cikampek Installation of Gear Line New Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia June~July'05 Completed
377 Machine Installation Cikampek Installation of MVB Line New Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia June~July'05 Completed
378 Machine Installation Cikampek Fabrication and Installation of Gate Crane PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia June~July'05 Completed
379 Machine Installation Kalideres Installation of Holding Furnace PT. Tembaga Mulia Semanan PT. Nittsu Shoji Indonesia July'05 Completed
380 Machine Installation Cikarang Unloading, Unpacking, and Installation of Mitutoyo Machine PT. Toyota Motor PT. Nittsu Shoji Indonesia July'05 Completed
381 Machine Installation Cikampek Installation 1,650Ton Toshiba Die Casting Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Aug ~ Sep'05 Completed
382 Shut Down Maintenance Subang Shut Down Maintenance for Terrain A and Terrain B PERTAMINA DOH JAWA BAGIAN BARAT PT. Rekayasa Industri ( Persero) July ~ Sep'05 Completed
383 Machine Installation Cikampek Installation 800Ton Die Casting Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Sep~Oct'05 Completed
384 Mechanical Work Tuban Restoration of Koch Tray & MD Tray PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION July~Oct'05 Completed
385 Mechanical Work Tuban Furnance Rectification Work PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION July~Oct'05 Completed
386 Modification Work Tuban Modify Pipe Support Connection PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION July~Oct'05 Completed
387 Machine Installation Bogor Installation of Gold Former Machine PT. NGK Busi Indonesia PT. Nittsu Shoji Indonesia Oct'05 Completed
Installation of AS Machine, Chiller Machine, HT Mesh Belt
388 Machine Installation Cibitung PT. NSK Bearing Manufacturing Ind. Direct By GTA Oct'05 Completed
Machine
Remove, Replacement, Centering and Leveling of Tapping
389 Machine Relocation Cikarang PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia Oct'05 Completed
Machine
390 Machine Installation Cikampek Relocation of OKK and Grinding Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Nov'05 Completed
391 Machine Installation Bekasi Installation, Centering and Leveling for Winder Roll Machine PT. Sliontec Ekadharma Indonesia Direct By GTA Nov'05 Completed
392 Fabrication Work Tuban Fabrication and Installation for Temporary Support at CCR PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Nov'05 Completed
393 Machine Installation Cikarang Unloading, Unpacking and Installation for Tapping Machine PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia Nov'05 Completed
394 Machine Installation Cikampek Installation of Hobbing and Gear Shaping Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Nov'05 Completed
395 Machine Installation Cikarang Installation of Injection Molding Machine PT. IK Precision PT. Konoike Transport Indonesia Nov'05 Completed
396 Machine Relocation Bekasi Relocation & Installation Molding of Machine PT. Nesinak Industri Direct By GTA Dec'05 Completed
397 Machine Installation Cikampek Installation of OKK PVC MVB Line PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Dec'05 Completed
398 Machine Installation Yasunaga Installation of Flexible Line 2 PT. Yasunaga Indonesia Direct By GTA Dec'05 Completed
399 Mechanical Work Bekasi Replacement of Pressure Lift Chamber PT. Sliontec Ekadharma Indonesia Direct By GTA Dec'05 Completed
400 Machine Installation Cikampek Installation of 4 WD Machine for Assy. Line PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Dec'05 ~ Jan '06 Completed
401 Machine Relocation Kerawang Dismantling, Relocation and Reinstallation of Conche Machine PT. Freyabadi Indotama Direct By GTA Dec'05 Completed
Installation of Shoot Blasting Machine, Press Machine, OKK
402 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Jan'06 Completed
Machine, EG Gear Line, EG Module Gang Head
Pump Cassing Disassembly Modification Work & Wall
Modification, Modification of CC Heater Pipe Extension,
403 Modification Work Tuban PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Jan'06 ~ Feb'06 Completed
Modification CCR Structure, Modification of Horizontal Branching
CCR Structure, Modification of Plat Form
404 Fabrication Work Tuban Fabrication Hand Rail PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Jan'06 Completed
405 Machine Installation Cibitung Installation of AS Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA Jan'06 Completed
406 Machine Installation Cikampek Installation of 2 Units DC Dies, Frut GS Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Jan'06 Completed
407 Relocation Work Cibitung Relocation of GR, & AS Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA Feb'06 Completed
Installation of Dran Nozzle & Instrument Nozzle, Agitator Motor
408 Machine Installation Tuban PT. Trans Pacific Petrochemical Indotama JGC. CORPORATION Feb'06 Completed
Base, Installation of Additional Gas Sampling Furnace
409 Relocation Work Tangerang Relocation & Installation of Pre Hardning Line PT. YKK AP Indonesia PT. Nittsu Lemo Indonesia Logistik Feb'06 Completed
410 Machine Installation Yasunaga Installation of Flexible Line 1 PT. Yasunaga Indonesia Direct By GTA Feb'06 Completed
411 Machine Installation Bekasi Replacement of Roll Calendar Machine No. 2, 3 and 4 PT. Sliontec Ekadharma Indonesia Direct By GTA Feb'06 Completed
412 Machine Installation Cikampek Installation 800Ton Press Machine for DC Line PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Feb'06 Completed
413 Machine Installation Cibitung Installation of AS Machine, GR Machine and LA Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA March'06 Completed
Leak Test and Repair of Distribution Box from Absorbent
414 Mechanical Work Tuban Chamber, Pneumatic Test for Absorbent Chamber Distribution PT. Trans Pacific
10 of 21 Petrochemical Indotama JGC. CORPORATION March'06 Completed
Box
415 Machine Installation Cikampek Installation New Die Casting Machine DC-500Ton Toshiba PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia March'06 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
416 Machine Installation Cikarang Unloading, Unpacking, Sliding & Rough Setting of Press Machine PT. ASTOM PT. Nittsu Lemo Indonesia Logistik March'06 Completed

417 Mechanical Erection Work Balongan Replacement of Catalyst Cooler 15-E-113A PERTAMINA UP-VI BALONGAN Direct By GTA March'06 Completed
Installation of Die Casting Machine 1250t Type Yamaha Pj.
418 Machine Installation Karawang PT. Yamaha Indonesia PT. Nittsu Shoji Indonesia April~May'06 Completed
Karawang
419 Machine Installation Yasunaga Installation of Flexible Line 8 PT. Yasunaga Indonesia Direct By GTA April~May'06 Completed
420 Machine Installation Cikampek Installation of Seiwa Grinding Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia May'06 Completed
Installation of Press Machine DH250 Toshiba and New Assembly
421 Machine Installation Cibitung PT. Keihin Indonesia PT. Nittsu Shoji Indonesia May'06 Completed
Line
422 Machine Installation Karawang Installation of CNC Grinding Machine PT. TRIX PT. Nittsu Shoji Indonesia June'06 Completed
423 Machine Installation Cibitung Installation of Rail Jig Machine and Accessories PT. Astra Honda Motor PT. Nittsu Shoji Indonesia June'06 Completed
424 Machine Installation Cikampek Installation of Heat Treatment and Baritory Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia June'06 Completed
Rigging and Mechanical Work for Ujung Pangkah Development
425 Mechanical Erection Work Gresik Amerada Hess (Indonesia-Pangkah) Ltd. PT. Inti Karya Persada Teknik Dec'06 ~ Jan'07 Completed
Project
426 Mechanical Erection Work Cibinong Manufacturing and Erection Mechanical Equipment P8 Up Grade PT. Indocement Tunggal Prakarsa PT. Wijaya Karya July'06 ~ Feb'07 Completed
427 Mechanical Erection Work Cibinong Manufacturing and Erection Mechanical Equipment P6 Up Grade PT. Indocement Tunggal Prakarsa PT. Wijaya Karya Dec'06 ~ Feb'07 Completed
428 Machine Installation Cibitung Installation of LA Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA July '06 Completed
429 Machine Installation Karawang Installation of New Ganshing Unit PT. Honda Prospect Motor PT. Nittsu Shoji Indonesia July'06 Completed
430 Machine Installation Bogor Installation Common Base and Relocation of Komatsu Machine PT. NGK Busi Indonesia PT. Nittsu Shoji Indonesia July'06 Completed
Installation of Metal Nut Assembly, Hopper, Part Feeder and
431 Machine Installation Cibitung PT. Fuji Seimitsu PT. Nittsu Shoji Indonesia Aug'06 Completed
Electrical Panel
Unloading, Unpacking, Sliding Installation and General Purpose
432 Machine Installation Cikarang PT. ASTOM PT. Nittsu Lemo Indonesia Logistik Aug'06 Completed
Lathe and Driling Machine
433 Machine Installation Cibitung Installation of LA, GR, and AS Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA Aug'06 Completed
Cleaning, Loading and Unloading Catalyst of 204-R-001 including
434 Mechanical Work Tuban PT. Trans Pacific Petrochemical Indotama Direct By GTA Aug'06 Completed
remove and reinstall center screen
435 Machine Installation Cibitung Installation of Machine PT. Meiwa Kyowa Indonesia PT. Konoike Transport Indonesia Sep'06 Completed
436 Machine Installation Cikarang Unloading, Unpacking & Installation of Machine PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia Oct'06 Completed
Installation of Robodrill Machine, Installation of New Painting
437 Machine Installation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Oct'06 Completed
Robot and Electrical Panel
438 Machine Installation Pulogadung Remove of Tapping Machine PT. Yamaha MFG Indonesia PT. Konoike Transport Indonesia Oct'06 Completed

439 Shut-Down Maintenance Cilamaya Turm Around Works for Cleanning Vessel and Exchanger PERTAMINA DOH JAWA BAGIAN BARAT PT. Tracon Industri Nov'06~Dec'06 Completed

440 Machine Installation Cikampek Installation of Mori Seiki Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Nov'06 Completed
441 Machine Installation Cibitung Installation of Die Casting Machine SD-50N PT. Keihin Indonesia PT. Nittsu Shoji Indonesia Nov'06 Completed
Installation of Die Casting Machine 1250t Type Yamaha Pj.
442 Machine Installation Karawang PT. Yamaha Indonesia PT. Nittsu Shoji Indonesia Nov'06 Completed
Karawang
443 Modification Work Cibinong Assist Work for Modification at Preheater and Calciner Area PT. Indocement Tunggal Prakarsa Direct By GTA Jan'07 Completed
444 Machine Installation Cibitung Replacement of Calender Machine (Roll No. 4) PT. Sliontec Ekadharma Indonesia Direct By GTA Feb. '07 Completed
Relocation and Reinstallation Schotthe Machine at NGK Busi
445 Machine Installation Bogor PT. NGK Busi Indonesia PT. Nittsu Shoji Indonesia Feb'07 Completed
Indonesia, Cilengkap
446 Machine Installation Cilegon Installation of Machine PT. Neomax Indonesia PT. Nittsu Shoji Indonesia April '07 Completed
Installation of Die Casting Machine DC350J and Installation of
447 Machine Installation Cibitung PT. Keihin Indonesia PT. Nittsu Shoji Indonesia April '07 Completed
Furnce
448 Machine Relocation Cikampek Relocation of Shot Blasting Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia April '07 Completed
Remove 1 (One) Unit Furnace and Relocation 1 (one) unit Mold
449 Machine Relocation Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia April '07 Completed
Preheater at PT. Honda Prospect Motor Karawang
450 Mechanical Erection Work Cibinong Pipe Conveyor Support P-6/7/8/11 PT. Indocement Tunggal Prakarsa PT. Wijaya Karya May ~ Aug '07 Completed
451 Machine Relocation Cikarang Remove, Relocation and Installation of Tapping Center Machine PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia May'07 Completed
452 Machine Relocation Karawang Installation of Blowmolding Machine PT. Kyoraku Blowmoulding Machine PT. Konoike Transport Indonesia May'07 Completed
453 Modification Work Cikampek Modification of Assy. Tester PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia May'07 Completed
454 Transportation Bojonegara Transportation DC Reactor R-051 PT. Sulfindo Adiusaha Direct By GTA May'07 Completed
11 of 21
455 Shut-Down Maintenance Bojonegara Annual Shut Down Maintenance 2007 PT. Sulfindo Adiusaha Direct By GTA June'07 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
456 Installation Work Cibitung Installation 1 (One) Unit New Heat Furnace PT. Ochiai Indonesia PT. Nittsu Shoji Indonesia June'07 Completed
Installation of Grinding Machine, Assy Machine and Lathing
457 Installation Work Cibitung PT. NSK Bearing Manufacturing Ind. Direct By GTA Dec'08 Completed
Machine.
458 Piping Work Cibinong P3 & P4 Water Cooling Piping PT. Indocement Tunggal Prakarsa Direct By GTA Dec'07 ~ June'08 Completed
Installation of Hamming Press Machine and Jig Welding
459 Installation Work Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Dec'08 Completed
Structure
Installation of Die Casting Machine 1650Ton, 800Ton and
460 Installation Work Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Nov ~ Dec'08 Completed
500Ton
461 Relocation Work Cikampek Relocation 2 Units Machine Gear Line 2nd Factory PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Dec'08 Completed
Installation of Grinding Machine, Assy Machine and Lathing
462 Installation Work Cibitung PT. NSK Bearing Manufacturing Ind. Direct By GTA Jan'08 Completed
Machine.
463 Installation Work Cibitung Installation of Cylinder Kneeder Machine PT. Sliontec Ekadharma Indonesia Direct By GTA Jan'08 Completed
464 Installation Work Cikampek Installation and Relocation Valve Body Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Jan'08 Completed
465 Installation Work Karawang Relocation and Installation NP-4 Case Line PT. Honda Prospect Motor PT. Nittsu Shoji Indonesia Jan'08 Completed
466 Installation Work Cikampek Installation of Pure Water Tank & Shape Gear Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Jan'08 Completed
467 Installation Work Karawang Installation Hamming Press Machine PT. Honda Prospect Motor PT. Nittsu Shoji Indonesia Jan'08 Completed

468 Installation Work Cikampek Installation Gear Line Machine, Washing Machine, 4WD Machine PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia Jan'08 Completed
Supply Manpower for Commissioning Work at Tangguh LNG
469 Manpower Supply BRITISH PETROLIUM BUT. JGC Corp - PT. KBR Indonesia Feb'08 - Aug 2009 Completed
Project
470 Installation Work Cibitung Installation of Press Machine PT. Fuji Seimitsu PT. Nittsu Shoji Indonesia Mar'08 Completed
Installation of Preheater Die Casting Machine, Double Head
471 Installation Work Cikampek PT. Honda Precision Parts Manufacturing PT. Honda Precision Parts Manufacturing Mar'08 Completed
Module Machine NTM-4
Installation of Grinding Machine, Assy Machine and Lathing
472 Installation Work Cibitung PT. NSK Bearing Manufacturing Ind. Direct By GTA Mar'08 Completed
Machine.
473 Installation Work Cibitung Installation Die Separator Machine PT. Tomita Asia PT. Nittsu Shoji Indonesia Mar'08 Completed
Supply Manpower and Equipment for Bio Ethanol Plant for
474 Manpower Supply Lampung PT. Medco Ethanol PT. Rekayasa Industri ( Persero) Mar'08 ~ June'08 Completed
Gasohol Project
475 Installation Work Cibitung Installation Milling Machine PT. TRIX PT. Nittsu Shoji Indonesia April'08 Completed
476 Installation Work Cikampek Installation of Engine Valve PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia April'08 ~ June'08 Completed
Piping Work - Wayang Windu Piping Work Area - B Wayang Windu Unit 2 Geothermal Power
477 Pangalengan PT. Magma Nusantara Limited PT. Rekayasa Industri ( Persero) April'08 ~ Dec'08 Completed
Project Project
Mechanical and Steel Structure Erection Work for EPC RCC
478 Revamping Project Balongan PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) April'08 ~ Jan'09 Completed
Revamping Project
479 Installation Work Karawang Relocation of Tapping Center Machine PT. IHARA MFG Indoensia PT. Konoike Transport Indonesia June'08 ~ Nov'08 Completed
480 Installation Work Cilengkap erection of Concrete Precast Structure 3401 PT. NGK Busi Indonesia PT. Nittsu Shoji Indonesia June'08 ~ Nov'08 Completed
481 Installation Work Cibitung Installation of 200T Press Machine and Heating Machine PT. Yutaka Indonesia PT. Nittsu Shoji Indonesia June'08 Completed
Installation of Padder Roll No. 1 & 3 and Bearing Replacement
482 Installation Work Cibitung PT. Sliontec Ekadharma Indonesia Direct By GTA June'08 Completed
for Roll Calendar Machine No. 4

Installation of Forging Machine 300Ton, Heat Treatment


483 Installation Work Cikampek PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia July'08 Completed
Machine, Vibrator Isolator Machine and Die Casting Machine

Installation of Heating Machine using 18 Set of Gimpole incld.


484 Installation Work Cibitung PT. NSK Bearing Manufacturing Ind. Direct By GTA July ~ Aug'08 Completed
Assit Vendor for Precommissioning & Commissioning
485 Installation Work Cikande Installation of Flexible Machine 3 - 5 - 8 PT. Yasunaga Indonesia Direct By GTA July ~ Aug'08 Completed
486 Installation Work Anyer Installation of Calendar Filter Machine PT. Polypet Karyapersada Direct By GTA Aug'08 Completed

487 Installation Work Cileungsi Replacement of Blade and Modification Cutter Line Machine PT. Lintec Indonesia Direct By GTA Aug'08 Completed
Installation of Shoot Blasting Machine and, Die Casting Machine
488 Installation Work Cibitung PT. Keihin Indonesia PT. Nittsu Shoji Indonesia Aug'08 Completed
and Machining Machine
489 Installation Work Merak Replacement of Internal Column Sulzer Cemtech Pte Ltd PT. Polychem Aug'08 Completed
490 Installation Work Cibitung Installation of Robot Painting Machine PT. Kansai Paint Indonesia PT. Nittsu Shoji Indonesia July ~ Aug'08 Completed
Penggantian Internal Part, Cleanning dan Repair Main
491 Maintenance Work Balongan PERTAMINA UP-VI BALONGAN Direct By GTA Nov ~ Dec'08 Completed
Equipment Unit RCC (TA 2008)
12 of 21
492 Maintenance Work Balongan Penggantian Cover Plate di 15-R-104 TA 2008 PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
Fabrikasi insert Plate & Install for feed nozle, Repair deflector,
493 Maintenance Work Balongan Repair support defenser, cutting plate ring bottom distance PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
25mm di 15-R-101 (Vapour cup).
494 Maintenance Work Balongan Dismantle of Whitdrawal Pipe 8" & 1/4" PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
495 Maintenance Work Balongan Fabricated dan Installation of Whitdrawal Pipe 8" & 1/4" PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed

Fabricated form work for riser (Dia. 1318 x 1m sebanyak 2 pcs


496 Maintenance Work Balongan dan Dia. 1318 x 0,6m sebanyak 3 pcs) dan pemasangan PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
additional lug pada depleg 15-R-101 dalam rangka TA 2008.

Penggantian Plate dan perbaikan shell orifice chamber serta


497 Maintenance Work Balongan penggantian part shoot blower of COB 21 unit dalam rangka TA PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
2008.

Repair of Cyclon lug sebanyak 10 pcs, Repair of air intack stack,


498 Maintenance Work Balongan PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
Repair / built up of cyclon & cross over dalam rangka TA 2008.

Repair of blow silencer 15-SIL-101, Bongkar pasang guillotine


499 Maintenance Work Balongan PERTAMINA UP-VI BALONGAN Direct By GTA Dec'08 Completed
COB dalam rangka TA 2008.
500 ROP Project Balongan Mechanical Work for RCC off Gas to Propylene Project PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) Mar 2009 - Nov 2010 Completed
501 ROP Project Balongan Heavy Lifting Work for RCC off Gas to Propylene Project PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) Mar 2009 - 2010 Completed
ISBL Piping Above Ground Work for RCC off Gas to Propylene
502 ROP Project Balongan PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) Mar 2009 - Nov 2010 Completed
Project, 290.000 Dia.Inch

503 ROP Project Balongan BOILER Piping Work for ROPP Project, 12.000 Dia.Inch PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) Mar 2009 - Jun 2010 Completed

504 ROP Project Balongan Steel Structure Work for RCC off Gas to Propylene Project PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) Mar 2009 - April 2010 Completed
Relocation of Machine (280 Unit) to New Factory for Machining
505 Installation Work Cibitung PT. Astra Otoparts Divisi Winteq PT. Federal Nittan Industries Mar - Aug 2009 Completed
Lines.
Konstruksi Perbaikan Regenerator dalam rangka Pit Stop FCCU
506 Maintenance Work Plaju PERTAMINA UP-III Plaju Direct By GTA June - July 2009 Completed
RU III Plaju.
Maintenace for Catalyst 204-R-001 and 204-V-003 Step 1 & Step
507 Maintenance Work Tuban PT. Trans Pacific Petrochemical Indotama Direct By GTA June - Aug Completed
2
508 ROP Project Balongan Erection of Concrete Precast Structure 3401 PERTAMINA UP-VI BALONGAN PT. Rekayasa Industri ( Persero) July 2009 Completed
509 Installation Work Cibitung Installation of New Slitter Coiler Machine 1 Unit PT. Hanwa Steel Indonesia PT. Konoike Transport Indonesia July 2009 Completed
510 Installation Work Cibitung Relocation of Press Machiner PT. Nesinak Industri Direct By GTA July 2009 Completed
Relocation of Isonet Machine Line for Mechanical, Piping, Civil,
511 Relocation Work Cibitung PT. Federal Nittan Industries Direct By GTA Aug - Sep 2009 Completed
Insulation and Electrical Work
512 Piping Work Balongan Repair of Steam Pipe 18" Outlet 15-F-102 PERTAMINA UP-VI BALONGAN Direct By GTA September 2009 Completed

513 Installation Work Cibitung Installation of Die Casting and Aluminium Furnace Machine PT. Keihin Indonesia PT. Nittsu Shoji Indonesia November 2009 Completed

514 Maintenance Work Plaju Replacement of Carbamate Condenser #1 Pusri II PT. Pupuk Sriwidjaja Direct By GTA December 2009 Completed

515 Maintenance Work Plaju Assist Work for Replacement of Plenum PERTAMINA UP-III Plaju PT. Srijasa Brikasa Perkasa January 2010 Completed

516 Maintenance Work Plaju Repair of APH PERTAMINA UP-III Plaju Direct By GTA January 2010 Completed

517 Installation Work Cibitung Installation of new GR M/C PT. NSK Bearing Manufacturing Ind. Direct By GTA January 2010 Completed

518 Installation Work Cibitung Installation of new LA M/C PT. NSK Bearing Manufacturing Ind. Direct By GTA January 2010 Completed

Ammonium Nitrate Prill Plant Mechanical, Heavy Lift and Steel Structure Erection Work for
519 Bontang PT. Kaltim Nitrate Indonesia PT. Rekayasa Industri ( Persero) March 2010 - May 2012 Completed
Project Ammonium Nitrate and Prill Plant Project

520 LPG Recovery Project Tuban Mechanical Work for LPG Recovery Project PT. Tuban LPG Indonesia Direct By GTA March 2010 - June 2010 Completed

521 Maintenance Work Balikpapan Repair Chimney Liner Stack F-2-02 Pertamina
13 ofUP
21V Balikapan Direct By GTA March - June 2010 Completed

522 Maintenance Work Balikpapan Dismantling Debutanizer Reboiler F-3-04A HCU-A Pertamina UP V Balikapan Direct By GTA March - April 2010 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
523 Change Bearing Jakarta Pusat Change Bearing at Roll Calender No. 3 & No. 4 PT. Sliontec Ekadharma Indonesia Direct By GTA May 2010 Completed

524 Maintenance Work Balongan Overhaul Compressor, Turbine and Accessories 32-K-101 KLBB PERTAMINA UP-VI BALONGAN Direct By GTA June 2010 Completed

525 Installation and Dismantling Work Balongan Installation and Dismantling Scaffolding for 19-C-102 PERTAMINA UP-VI BALONGAN Direct By GTA June 2010 Completed

Cleaning and Minor Repair Main Equipment Unit NPU


526 Maintenance Work Balongan (Regenerator, Reactor, Heat Exchanger, Fin Fan, Flare) in order PERTAMINA UP-VI BALONGAN Direct By GTA June - July 2010 Completed
to TA KLBB 2010
Furnace I/II, Stack, APH Coloumn 1-1/2/3/4, Stripper 2-1/3,
527 Maintenance Work Plaju Evaporator 3-1 dalam rangka TA Crude Distilling Unit II Plaju PERTAMINA UP-III Plaju Direct By GTA August 2010 Completed
tahun 2010
528 Installation Work Cibitung Installation of new Assembly Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA August 2010 Completed
529 Relocation Work Cibitung Relocation of Lathing Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA August 2010 Completed
530 Installation Work Cibitung Installation of New Grinding Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA August 2010 Completed
531 Relocation Work Cibitung Relocation of Grinding Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA September 2010 Completed
532 Relocation Work Cibitung Relocation of Assembly Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA September 2010 Completed
Relocation of TMV 610 APC & Dyna #2 Machine at HPPM include
533 Relocation Work Cikampek Manpower, Equipment, Tools, & Floor Protection Consumable, PT. Honda Precision Parts Manufacturing PT. Nittsu Shoji Indonesia September 2010 Completed
Site Expenses
534 Maintenance Work Cilegon Tube Bundle Extraction of EA-118F PT. Chandra Asri Petrochemical Direct By GTA Oktober - November 2010 Completed
Painting Work for Spool for Ammonium Nitrate Prill Plant Project
535 Piping Work Bontang PT. Kaltim Nitrate Indonesia PT. Rekayasa Industri ( Persero) October - December 2010 Completed
(Shop Fabrication Spool)
536 Equipment Installation Bekasi Equipment Installation Work for D-Line Project PT. Shinko Plantech PT. Riken Indonesia October - Desember 2010 Completed
537 Maintenance Work Cilegon Replacement Internal Colomn PT. Polychem Indonesia PT. Sulzer Chemtech Pte Ltd Oktober - November 2010 Completed
538 Installation Machine Cibitung Installation of New Machine (AS) 3121L, AM, AU & BH PT. NSK Bearing Manufacturing Ind. Direct By GTA November 2010 Completed

539 Installlation Machine Bekasi Installation of Die Casting Machine 800T No. 16, 17 and 18 PT. Yamaha Parts Manufacturing Indonesia PT. Nittsu Shoji Indonesia Nov 2010 - Jan 2011 Completed

540 Maintenance Work Bontang Mechanical Work for Replacement of Steam Superheater E-0500 PT. Kaltim Parna Industri Direct By GTA Nov - Dec 2010 Completed

541 Installation Machine Cibitung Installation of New Machine HT MB-004 PT. NSK Bearing Manufacturing Ind. Direct By GTA Dec-10 Completed
542 Relocation Work Bekasi Relocate Machine and 500T Material PT. Astra Daido Steel Indonesia PT. Astra Otoparts Tbk Desember 2010 Completed
543 Replacement Work Bogor Replacement of Cooling Drum BC-4 ADH PT. Lintec Indonesia Direct By GTA Desember 2010 Completed
Constructability Study untuk penggantian 12 Unit/Bank Air Fin
544 Constructability Study Balongan PERTAMINA UP-VI BALONGAN Direct By GTA Januari 2011 Completed
Cooler 11-E-114-A-M Dalam Rangka Pit Stop RCC 2011
545 Replacement Work Bekasi Mixing Roll Gear Replacement PT. Shinko Plantech PT. Riken Indonesia Januari 2011 Completed
546 Repair Work Merak Repair of Internal Column PT. Polychem Indonesia Direct By GTA Januari 2011 Completed
547 Installation Work Cikande Rotor Installation Work PT. Yasunaga Indonesia Direct By GTA Feb-11 Completed
Overhaul 15-K-101 & Accs Serta Penggantian Bearing, labyrinth
548 Maintenance Work Balongan PERTAMINA UP-VI BALONGAN Direct By GTA Jan - Feb 2011 Completed
Seal 15-K-101
549 Maintenance Work Balikpapan Retubing Tube Heater F-1-01AB HSC PERTAMINA UP-V BALIKPAPAN Direct By GTA Feb - April 2011 Completed

550 Maintenance Work Balikpapan Replacement Heat Exchanger E-2-09 HVU II TA PERTAMINA UP-V BALIKPAPAN Direct By GTA Mar - April 2011 Completed

551 Installlation Machine Bekasi Installation of Die Casting Machine 800T No. 19 PT. Yamaha Parts Manufacturing Indonesia PT. Nittsu Shoji Indonesia Mar-11 Completed

552 Replacement Work Bogor Install 1 Line Machine BS 10 PT. Lintec Indonesia Direct By GTA Mar-11 Completed

553 Fabrication Work Cilegon Fabrication 240Ton Counter Weight SL-6000 PT. Sankyu Indonesia International Direct By GTA Mar - April 2011 Completed

554 Maintenance Work Balongan Overhaul Insitu Landing Boat SPM 12.5 M PERTAMINA UP-VI BALONGAN Direct By GTA Maret 2011 Completed

555 Maintenance Work Balongan Overhaul Loading Arm 41-LA-101 PERTAMINA UP-VI BALONGAN
14 of 21 Direct By GTA March - Jun 2011 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
Perbaikan Regenerator, Reaktor & Furnace FCCU & HVU.II
556 Maintenance Work Plaju PERTAMINA UP-III Plaju Direct By GTA May-11 Completed
Dalam Rangka Minor Shutdown FCCU Group Tahun 2011
557 Maintenance Work Merak Cleaning HE EA-310A at PT Styrindo Mono Indonesia PT. Chandra Asri Petrochemical Direct By GTA May-11 Completed
Civil, Mechanical, Structure and Piping SDK Debottlenecking
558 EPC Work Anyer PT. Chandra Asri Petrochemical Direct By GTA Jun-Nov 11 Completed
Project
Civil, Mechanical and Structure Interconnecting and
559 EPC Work Merak PT. Sulfindo Adiusaha Direct By GTA Jun-Nov 11 Completed
Debottlenecking Project

560 Maintenance Work Bontang Repair and Cleaning Screen R-0502 PT. Kaltim Parna Industri Direct By GTA July-Agust 2011 Completed

561 Mechanical Erection Work Suban Suban Bypass Project Conoco Philips, Ltd PT. Inti Karya Persada Teknik July-Sep 2011 Completed

562 Mechanical Erection Work Tuban Mechanical Erection Belt Conveyor PT. Semen Gresik Direct By GTA Agust-December 2011 Completed

Relocation Pertamina Loading Arm 41-LA-102 Nigata and Fire


563 Relocation Work Balongan PT. Pertamina RU VI Balongan PT. Adhi Karya Sept-October 2011 Completed
Monitor
Pemasangan External Support for Clamp Thermowell 13-TE-130
564 Maintenance Work Balongan PT. Pertamina RU VI Balongan Direct By GTA Oct-11 Completed
pada Reaktor 13-R-102
Perbaikan Insitu SPM 12.500 DWT Milik PT Pertamina RU VI
565 Maintenance Work Balongan PT. Pertamina RU VI Balongan Direct By GTA Oct-11 Completed
Balongan
Pipe Line Up-Grading Dalam Rangka Turn Around Crude
566 Maintenance Work Plaju PERTAMINA UP-III Plaju Direct By GTA Sept-October 2011 Completed
Distilling Unit III Kilang Plaju Tahun 2011
Furnace I/II, Stack dan APH Dalam Rangka Turn Around Crude
567 Maintenance Work Plaju PERTAMINA UP-III Plaju Direct By GTA Sept-October 2011 Completed
Distilling Unit III Kilang Plaju Tahun 2011

568 Piping Work Tuban Piping Replacement 201-E-001 and Bootleg 201-V-001 TPPI Tuban Direct By GTA Nov-Dec 2011 Completed

569 Mechanical Work Jakarta Push-Pull Work ORF Floating LNG Project Nusantara Regas PT. Rekayasa Industri ( Persero) Dec-11 Completed

570 Piping Work Merak Interconnecting Piping Part 2 PT. Sulfindo Adiusaha Direct By GTA Dec-Feb 12 Completed

Loading and Unloading Catalyst on 34-V-104 A/B, 35-V-101 A/B


571 Mechanical Work Balongan PT. Pertamina RU VI Balongan PT. Rekayasa Industri ( Persero) Dec 2011 -July 12 Completed
& 37-V-108 A/B
Removal and Replacement of Shell and Catalyst Basket on
572 Mechanical Work Bontang PT. Kaltim Nitrate Indonesia Direct By GTA Jan-Feb 12 Completed
Equipment 12R003 NH3 Tail Gas Reactor

573 Mechanical Work Bontang Manpower Supply for ANP Project PT. Kaltim Nitrate Indonesia Direct By GTA June - Nov '12 Completed

Piping Work PBI 100.000 MTA Butadiene Extraction Plant


574 Piping Work Anyer PT. Petrokimia Butadiene Indonesia Toyo Engineering Korea Ltd Feb'12 - Jan'13 Completed
130.000 D/I
Steel Structure Work PBI 100.000 MTA Butadiene Extraction
575 Steel Structure Work Anyer PT. Petrokimia Butadiene Indonesia Toyo Engineering Korea Ltd Feb'12 - Nov 12 Completed
Plant
Heavy Lifting & Mechanical Erection Heavy Lifting & Mechanical Erection Work PBI 100.000 MTA
576 Anyer PT. Petrokimia Butadiene Indonesia Toyo Engineering Korea Ltd April'12 - Nov 12 Completed
Work Butadiene Extraction Plant

577 Mechanical Work Bontang MPS for Reinforcement Coal Boiler Plant Project PT. Pupuk Kaltim PT. Inti Karya Persada Teknik Feb'12 - Nov'12 Completed

578 Maintenance Work Balongan Perbaikan Orifice Chamber, Reaktor dan regenerator RCC PT. Pertamina RU-VI Balongan Direct By GTA Feb - Mar '12 Completed

Heavy Lifting & Mechanical Erection


579 Banjarmasin Out of Pit Crushing and Conveying (OPCC) onshore portion PT. Adaro Energy PT. Wijaya Karya April'12 - Dec'12 Completed
Work

580 Mechanical Work Karawang Installation Injection Machine PT. Nipro Indonesia Jaya PT. Nittsu Lemo Indonesia Logistik May-12 Completed

581 Mechanical Work Karawang Installation Extruding Machine (1st Floor) PT. Nipro Indonesia Jaya PT. Nittsu Lemo Indonesia Logistik Jun-12 Completed

Perbaikan Furnace I/II, Stack, APH Dalam Rangka Turn Around


582 Maintenance Work Plaju PT. Pertamina RU-III Plaju Direct By GTA Jun - Jul '12 Completed
Crude Distilling Unit IV Kilang Plaju Tahun 2012

Heavy Lifting & Mechanical Erection 15 of 21


583 Dayung & Grissik Heavy Lifting & Mechanical Erection Work PT. Conoco Phillips PT. Rekayasa Industri ( Persero) August'12 - March'13 Completed
Work
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE

Heavy Lifting & Mechanical Erection Luwuk - PT. Sekawan Kontrindo


584 Heavy Lifting & Mechanical Erection Work DSLNG July'12 - December'14 Completed
Work Sulawesi Tengah (JGC Corporation)

585 Mechanical Work Karawang Installation EOG Machine 2nd Unit & Sakura SI Machine PT. Nipro Indonesia Jaya PT. Nittsu Lemo Indonesia Logistik Sept'-Oct'12 Completed
PENGGANTIAN CATALYST COOLER A, B, C & D,
CLEANING, INSPECTION, REPAIR DI 15-R-101/102/103/104, 15-
586 Maintenance Work Balongan L-107/108/109/109/110, 15-A-102/103, 15-F-101(DFAH), 15-SK- PT. Pertamina RU-VI Balongan Direct By GTA Oct'12 - Nov'12 Completed
101, 15-C-101

Penggantian/Replacement Heat Exchanger E-2-10, E-2-11, E-1-


587 Maintenance Work Balikpapan 10, E-1-11A, E-1-11B dan Fin-Fan Cooler EA-3-08A dalam PT. Pertamina RU V Balikpapan Direct By GTA Oct'12-Nov'12 Completed
Rangka Minor Shutdown Kilang Bpp-II Tahun 2012

588 Installation Work Cibitung Installation for M-Line Project PT. Rapindo PT. Shinko Plantech Jan'13-Feb'13 Completed

589 Installation Machine Serang Installation Machine Fx11 PT. Yasunaga Indonesia Direct By GTA Feb'13 Completed

590 Installation Work Cilegon REPLACEMENT CL-2 AIR PREHEATER PT. Cabot Indonesia Direct By GTA Feb'13-Mar'13 Completed

591 Installation Work Cikampek Install for PACK MOUDULE MACHINE 2 Unit PT. HPPM PT. Nittsu Shoji Indonesia Mar'13 Completed

592 Maintenance Work Balongan Emergency Cleaning dan Repair di Regenerator 32-R-104 PT. Pertamina RU-VI Balongan Direct By GTA Mar'13 Completed

PERBAIKAN REGENERATOR, REACTOR, ORIFICE CHAMBER DAN


593 Maintenance Work Plaju PIPA CATALYST DALAM RANGKA MINOR SHUTDOWN FCCU PT. Pertamina RU-III Plaju Direct By GTA Mar'13-April'13 Completed
GROUP 2012
INSTALLATION OF BLOCK MOULDING MARCH 2013 &
594 Installation Machine Karawang RELOCATION OF RF 414 MACHINE TO RF 511 POSTION PT Freyabadi Indotama Direct By GTA April'13 Completed
FEBRUARY 2013

595 Installation Machine Cikampek INSTALL DC 1650T MACHINE PT. HPPM 2 Unit PT. HPPM PT. Nittsu Shoji Indonesia Mei'13-Jun'13 Completed

596 Installation Machine Cikampek INSTALL PRESS MACHINE AIDA PT. HPPM PT. Nittsu Shoji Indonesia Jun'13 Completed
Cleaning, Inspection and Repair Main Equipment Reactor &
597 Maintenance Work Balongan Regenerator serta Replacement Fin Fan, HE, Vessel dan EBJ PERTAMINA UP-VI BALONGAN Direct By GTA Oct-13 Completed
Dalam Rangka Planned Corrective Maintenance 2013
Penggantian XV Valve, Hot Spot dan Flare Tip dalam rangka
598 Machine Installation Balongan PERTAMINA UP-VI BALONGAN Direct By GTA Oct-13 Completed
Planned Corrective Maintenance RU VI Tahun 2013
599 Machine Installation Balongan PERBAIKAN 31-F-101,103.103,104 PERTAMINA UP-VI BALONGAN Direct By GTA Oct-13 Completed
Heavy Lifting & Mechanical Erection
600 Dumai Pemasangan Column 101-T-3 di Kilang Sungai Pakning PERTAMINA UP-II Dumai Direct By GTA Nov-13 Completed
Work
601 Piping Work Palembang Underground Piping Pusri 2 B - Pupuk Sriwidjaya PUPUK SRIWIDJAYA - PALEMBANG PT. Rekayasa Industri ( Persero) Sep'13-Apr'14 Completed

602 OPCC Project Banjarmasin Extension of CV-260 and additional Work for OPCC Project PT. Adaro Energy PT. Wijaya Karya Sep'13-Mei'14 Completed
Instalasi Desalination Package pada Proyek Resid Fluid Catalytic
603 RFCC Project Cilacap PERTAMINA PT. Adhi Karya Nov'13-Apr'14 Completed
Cracking (RFCC) Cilacap
CONSTRUCTABILITY STUDY RETUBING HEATER F-2-01A & F-2-
604 Constructability Study Balikpapan PERTAMINA UP-V BALIKPAPAN Direct By GTA Nov-13 Completed
01B
605 Equipment Installation Bekasi Replacement Motor Compressor PT. NSK Bearing Manufacturing Ind. Direct By GTA Nov-13 Completed
Mekanikal Cleaning Heat Exchanger dan Pemasangan
606 Mekanikal Cleaning Dumai PERTAMINA UP-II Dumai Direct By GTA Nov-13 Completed
Scaffolding
607 Equipment Installation Bekasi Remove Motor Compressor PT. NSK Bearing Manufacturing Ind. Direct By GTA Dec-13 Completed

608 Equipment Installation Bekasi Replace Motor Compressor PT. NSK Bearing Manufacturing Ind. Direct By GTA Dec-13 Completed
16 of 21
609 Maintenance Work Tuban Repair Inner Screen PT. Trans Pacific Petrochemical Indotama Direct By GTA Dec-13 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
610 Maintenance Work Balongan Repair Generator 32-R-104 PERTAMINA UP-VI BALONGAN Direct By GTA Jan-14 Completed

611 Piping Work Palembang Underground Piping Pusri 2 B - Pupuk Sriwidjaya PUPUK SRIWIDJAYA - PALEMBANG PT. Inti Karya Persada Teknik Jan'14-Feb'14 Completed
Piping Installation - CAP Ethylene Cracking Complex Expansion
612 Piping Work Anyer PT. Chandra Asri Petrochemical Toyo Engineering Corporation Ltd Mar'14-Nov '15 Completed
Project
General Mechanical Installation - CAP Ethylene Cracking
613 Equipment Installation Anyer PT. Chandra Asri Petrochemical Toyo Engineering Corporation Ltd Mar'14-Nov '15 Completed
Complex Expansion Project
General Mechanical Replacement - CAP Ethylene Cracking
614 Mechanical Work Anyer PT. Chandra Asri Petrochemical Toyo Engineering Corporation Ltd Mar'14-Nov '15 Completed
Complex Expansion Project
Heavy Equipment Installation - CAP Ethylene Cracking Complex
615 Equipment Installation Anyer PT. Chandra Asri Petrochemical Toyo Engineering Corporation Ltd Mar'14-Nov '15 Completed
Expansion Project

616 Maintenance Work Jambi Merang Internal Cleaning of Statutory Equipment of Amine System PERTAMINA TALISMAN JOB Direct By GTA Mar-14 Completed

617 Equipment Installation Bekasi Installation for New Furnace Machine PT. NSK Bearing Manufacturing Ind. Direct By GTA May-14 Completed

618 Mechanical Work Cilegon Reinforce Tailgas Flare Stack PT. Cabot Indonesia Direct By GTA May-14 Completed

619 Mechanical Work Cilegon Reinforce Tailgas Flare Stack (Pipe Replacement) PT. Cabot Indonesia Direct By GTA May-14 Completed

620 Mechanical Work Cilegon Load-Out Work for PHE-12, PHE-24, & CPP-2 PT. Guna Nusa Utama Fabricator Direct By GTA May-14 Completed

621 Mechanical Work Palembang Mechanical and Heavy Lift Erection Work - Pusri 2 B PT. Pupuk Sriwijaya PT. Rekayasa Industri ( Persero) Aug-14 Completed

622 Piping Work Palembang Above Ground Piping Work (Amonia) PT. Pupuk Sriwijaya PT. Rekayasa Industri ( Persero) Oct-14 Completed

Mechanical Works & Steel Structure Installation - STG Boiler


623 Mechanical Work Palembang PT. Pupuk Sriwijaya PT. Rekayasa Industri ( Persero) Nov-14 Completed
Batubara Project

624 Mechanical Work Palembang Inland Transportation For Heavy and Over Dimention Cargo PT. Pupuk Sriwijaya PT. Toyo Engineering Oct '14 - Nov' 14 Completed

Cleaning, Inspection, and Repair Main Equipment Unir NPU


(Regenerator, Reactor, Heat Exchanger, Miscellaneous,
625 Mechanical Work Balongan PT. Pertamina (PERSERO) RU VI Balongan Direct By GTA Jan'15 Completed
Coloumn, Fin-Fan, termasuk Replacement, Furnace) Dalam
Rangka Turn Around KLBB 2014

626 Mechanical Work Balongan Pemasangan 5 EIV di Unit 31,32&33 saat TA KLBB 2014 PT. Pertamina (PERSERO) RU VI Balongan Direct By GTA Jan'15 Completed

627 Mechanical Work Cibitung Renewal for Heating Furnace Machine MB-001 PT. NSK Bearing Manufacturing Ind. Direct By GTA Sept'14 Completed

628 Mechanical Work Cibitung Unloading & Unpacking Sliding for Temp Furnace PT. NSK Bearing Manufacturing Ind. Direct By GTA Aug'14 Completed

629 Mechanical Work Cilegon Relocation and Installation Overhead Crane NS Blue Scope Indonesia Direct By GTA Dec'14 Completed

630 Mechanical Work Jambi Merang Provision of cleaning amine regenerator and reboiler Pertamina Talisman JOB Direct By GTA Dec'14 Completed

Mechanical pada Regenerator-Reactor Unit FCCU pada Plant


631 Mechanical Work Plaju PT Pertamina (PERSERO) Refinery Unit III Direct By GTA Feb'15 Completed
Corrective Maintenance (PCM) FCCU Grup Tahun 2015

Change Order Supporting work (Scaffold. Nitrogen, crane,


632 Mechanical Work Balongan forklift, hot bolting, Blind-deblind, tenda, etc) Startup II KLBB PT. Pertamina (PERSERO) RU VI Balongan Direct By GTA Feb'15 - March'15 Completed
2015

Change XV Valve and Cleaning & Repair Heat Exchanger pada


633 Mechanical Work Balongan PT. Pertamina (PERSERO) RU VI Balongan Direct By GTA Apr'15 - May'15 Completed
saat COC unit OCU Tahun 2015
634 Equipment Installation Cilegon Installation Slitting machine, Silicon Project NS Blue Scope Indonesia Direct By GTA Apr'15 - May'15 Completed

635 Mechanical Work Bontang Installation For R-0502 PT Kaltim Parna Industri Direct By GTA Apr'15 Completed
17 of 21
Cilincing -
636 Mechanical Work Demoltion Pier Head Work Kajima Waskita Joint Ops. Direct By GTA Nov '14 Completed
Jakarta Utara
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
637 Equipment Installation Cilegon Installation Shiering Machine NS Blue Scope Indonesia Direct By GTA May '14 Completed
Cilincing -
638 Transportation Work Transporation U-Girder Kajima Waskita Joint Ops. Direct By GTA Apr'15 - Oct'15 Completed
Jakarta Utara
Tj. Priok -
639 Transportation Work Transportation Flare Tip PT. Chandra Asri Petrochemical Direct By GTA August '15 Completed
Cilegon
Turn Around Maintenance Work Item Static and Mechanical
640 Mechanical Work Cilegon PT. Chandra Asri Petrochemical Direct By GTA October '15 - November '15 Completed
Butadiene Plant
641 Mechanical Work Matindok Mechanical & Erection Work PT. Pertamina (Persero) EP WIKA - TECHNIP JO October '15 - March '16 Completed

642 Mechanical Work Padang Lifting Work for Project Indarung VI Semen Padang PT. Semen Padang WIK Konstruksii October '15 - September'16 Completed
Construction of Jakarta Mass Rapid Project - Assembly and
643 Mechanical work Jakarta SMCC - HK JO Direct By GTA November '15 - Desember '15 Completed
Dismantling TBM
Piping Installation Process & Utility Aboveground and
644 Piping Work Matindok PT. Pertamina (Persero) EP WIKA - TECHNIP JO November '15 - Mid April '16 Completed
Underground
Mechanical Work & Steel Structure Sumpal Compression Project Mechanical & Steel Structure
645 Matindok ConocoPhillips (Grissik) Ltd PT. Rekayasa Industri ( Persero) November '15 - August '16 Completed
Erection Installation Work

646 Installation Work Banjarmasin Installation of CV-260 3rd Extention OPCC Project PT. Adaro Energy PT. Wijaya Karya November - December '15 Completed

Mekanikal Heat Exchanger, Vessel, Penyediaan Alat Berat dan


647 Mechanical work Dumai PT. Pertamina (Persero) RU II Dumai Direct By GTA January '16 - February '16 Completed
Scaffolding Unit 110, 140 & 220 Area HOC, Turn Around 2016

Mekanikal Heat Exchanger, Vessel, Penyediaan Alat Berat dan


648 Mechanical work Dumai PT. Pertamina (Persero) RU II Dumai Direct By GTA January '16 - February '16 Completed
Scaffolding Unit 100, 102 & 301 Area HSC, Turn Around 2016

649 Mechanical work Bontang K 5 Shutdown Work PT. Pupuk Kaltim PT. Inti Karya Persada Teknik April '16 - July'16 Completed

650 Mechanical work Jambi Merang Internal Cleaning Bottom Amine & Amine Reboiler JOB Pertamina Talisman Jambi Merang Direct By GTA Mei 2016 Completed

651 Mechanical work Jambi Merang Internal cleaning Condensate Stabilizer Coloumn & Reboiler JOB Pertamina Talisman Jambi Merang Direct By GTA Mei 2016 Completed

652 Installation Machine Cikampek INSTALL DC 1650T MACHINE PT. HPPM 2 Unit PT. HPPM PT. Nittsu Shoji Indonesia Mei'16-Jun'16 Completed

653 Mechanical work Banggai Banggai Amonia Plant Project PT. Panca Amara Utama PT. Rekayasa Industri ( Persero) Mei 2016-Oktober 2017 Completed
Penggantian Heat Exchanger Assy Cabut/pasang/lepas tube
bundle HE, Fin Fan, Cleaning Shell HE, Buka Pasang Tube
654 Mechanical work Cilacap PT. Pertamina (Persero) RU IV Cilacap Direct By GTA Agustus '16 Completed
Plug/Cover Finfan di Area LOC-II Sesuai Lingkup kerja dalam
grup MGA 3 Saat TA Tahun 2016.
Penggantian Heat Exchanger Assy Cabut/pasang/lepas tube
bundle HE, Fin Fan, Cleaning Shell HE, Buka Pasang Tube
655 Mechanical work Cilacap PT. Pertamina (Persero) RU IV Cilacap Direct By GTA Agustus'16 Completed
Plug/Cover Finfan di Area LOC-III Sesuai Lingkup kerja dalam
grup MLA 4 Saat TA Tahun 2016.
656 Maintenance Work Tuban Repair Inner Screen PT. Trans Pacific Petrochemical Indotama Direct By GTA Agustus'16 Completed

657 Mechanical work Palembang Fabrikasi Frame for Cyclone FCCU PT. Pertamina (Persero) RU III Plaju Direct By GTA September' - October 16 Completed

658 Mechanical work Cilegon GC 681 A Condensor & Evaporator Cleaning PT. Chandra Asri Petrochemical Direct By GTA September' 16 Completed

659 Mechanical work Cilegon Mechanical & Heavy Lifting Work for SRI - U3 Project PT. Syntetic Rubber Indonesia PT. Inti Karya Persada Teknik October 16 - July 2017 Completed

660 Constructability Study Cilacap CONSTRUCTABILITY STUDY Catalyst Cooler PERTAMINA UP-IV Cilacap Direct By GTA Jul-16 Completed
Sewa Crane 550 Ton, 300 Ton 160 Ton ( 2 Unit ) untuk
661 Mechanical work Palembang PT. Pertamina (Persero) RU III Plaju Direct By GTA November'16 Completed
Replacement Cyclone FCCU
662 Mechanical work Anyer Tower Modification D1-601, D1-501 and D1-301 PT. INDORAMA PETROCHEMICALS Direct By GTA Dec-16 Completed

663 Mechanical work Aceh Mechanical Work Blok A project PT. Medco Energi JGC & Encona Consurtium January 2017 - October 2017 Completed

664 Mechanical work Aceh Steel Structurre Installation Work Blok A project PT. Medco Energi JGC & Encona Consurtium January 2017 - October 2017 Completed
Piping Installation work for Area Reformer & CO2 Banggai
665 Piping Work Banggai PT. Panca Amara Utama PT. Rekayasa Industri ( Persero) January 2017-June 2017 Completed
Amonia Plant Total Dia in 27.000
18 of 21
666 Mechanical work Anyer Install Steel Structure for CEMS PT. Chandra Asri Petrochemical Direct By GTA Dec 2016 - January 2017 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
667 Constructability Study Cilacap CONSTRUCTABILITY STUDY PERBAIKAN FURNACE PERTAMINA UP-IV Cilacap Direct By GTA Dec-16 Completed

668 Maintenance Work Tuban Repair Inner Screen PT. Trans Pacific Petrochemical Indotama Direct By GTA Jan-17 Completed
Penggantian Catalyst Cooler A,B,C & D dan Cleaning, Inspection
& Repair Main Equipment (Reactor, Regenerator, Stack, Damper,
669 Mechanical work Balongan PT. Pertamina RU VI Balongan Direct By GTA Jan-17 Completed
Furnance, Coloumn, Exchanger, Valve) Dalam rangka Pit Stop
Tahun 2016
670 Mechanical work Balikpapan Replacement F-2-101 A/B Dalam Rangka TA Kilang BPP II PT. Pertamina RU V Balikpapan Direct By GTA Maret 2017 Completed
Repair & Modification Column C 2 01 Dalam rangka TA
671 Mechanical work Balikpapan PT. Pertamina RU V Balikpapan Direct By GTA Maret 2017 Completed
Balikpapan II
672 Mechanical work Balikpapan Sewa Crane 550 Ton,dan 160 Ton untuk Replacemnet F 2 01 PT. Pertamina RU V Balikpapan Direct By GTA Maret 2017 Completed

673 Mechanical work Cilacap Mechanical Erection Work PLBC Project PT. Pertamina RU IV Cilacap JGC & Encona Consurtium Maret 2017 - May 2018 Completed

674 Mechanical work Cilacap Steel Structure Erection Work PLBC Project PT. Pertamina RU IV Cilacap JGC & Encona Consurtium Maret 2017 - May 2018 Completed
Transport & Replacement Reactor RE-5201 & Vacum Hopper V-
675 Mechanical work Cilegon PT. Asahimas Direct By GTA Juni 2017 - Januari 2018 Completed
5213
676 Mechanical work Cilegon Install Stack Tower PT. Asahimas PT. BEC Juni 2017 - September 2017 Completed

677 Maintenance work Palembang TA CDU II PT. Pertamina RU III Plaju Direct By GTA Agustus 2017 - September 2017 Completed

678 Mechanical Work Cilegon Butadien Expansion Project PT. Chandra Asri Petrochemical PT. IKPT November 2017 - Maret 2018 Completed

679 Piping Work Cilegon Butadien Expansion Project PT. Chandra Asri Petrochemical PT. IKPT November 2017 - Maret 2018 Completed

680 Insulation & painting Work Cilegon Butadien Expansion Project PT. Chandra Asri Petrochemical PT. IKPT November 2017 - Maret 2018 Completed

681 Mechanical Work Cilegon New Polyethrlyne Expansion Project (NPE) PT. Chandra Asri Petrochemical PT. IKPT December 2017-April 2019 Completed

682 Mechanical Work Cilegon Debotlenecking DBN Project PT. Chandra Asri Petrochemical PT. JGC June 2019 - September 2019 Completed

683 Mechanical Suban Suban Compresion project PT. Conoco Phillips PT. IKPT Maret 2018 - July 2018 Completed

684 Mechanical Cilegon TAM Butadiene 2018 PT. Chandra Asri Petrochemical Direct By GTA Maret 2018 - April 2018 Completed

685 Mechanical Indramayu Maincontractor di area RCC Pit Stop 2018 PT.Pertamina RU VI Balongan Direct By GTA Juli 2018 - Agustus 2018 Completed
Jasa Sewa Pekerjaan Heavy Lift & Transport Reactor dari P IV ke
686 Mechanical Work Palembang PT. Pupuk Sriwijaya Direct By GTA November - December '18 Completed
P III
687 Mechanical Work Bontang Replacement 112C, 103B&C Option 1 PT. Pupuk Kaltim PT. IKPT Dec-18 Completed

688 Mechanical Work Papua Mechanical Work Tangguh Expantion Project PT. BP Migas CSTS November 2018 - April 2023 On Going

689 Hevy Lift Papua Heavy Lift Work Tangguh Expantion Project PT. BP Migas Fagioli November 2018 - Juli 2020 Completed

Mechanical Work, Steel Structure &


690 Cilegon Buthene -1 & MTBE Project PT. Chandra Asri Petrochemical PT. IKPT March 2019 - April 2020 Completed
Heavy Lifting

691 Mechanical Work Jambi Merang Internal Cleaning Amine Regenarator and Reboiler JOB Pertamina Talisman Jambi Merang Direct By GTA Agustus 2019 Completed
Cleaning, perbaikan dan Penggantian Equipment/Peralatan
Kilang Area RFCC, GTO & UTL-RFCC, Sesuai Lingkup Kerja
692 Mechanical Work Cilacap PT. Pertamina RU IV Cilacap Direct By GTA Oct - Nov 2019 Completed
Group : MRA-15, pada Pelaksanaan TA Th.2019 Kilang PT.
PERTAMINA (PERSERO) RU IV Cilacap
693 Heavy Lifting Cilegon NSI 3 AA Expansion Project PT. Nippon Sucubai Indonesia PT. IKPT Dec 2019 - June 2020 Completed

694 Mechanical Work Cilacap Pit Stop RCC PT. Pertamina RU VI Balongan Direct By GTA Maret - April 2020 Completed

695 Mechanical Work Balongan Stop Unit NPU RU VI Balongan PT. Pertamina RU VI Balongan Direct By GTA June-July2020 Completed

696 Mechanical Work Tuban Pit Stop 2020 PT. TPPI Direct By GTA Agustus - September 2020 Completed

697 Heavy Lifting Bojonegoro Jambaran Tiung Biru Project Heavy Lifitng PT. Pertamina EP Cepu PT. Rekayasa Industri ( Persero) April - September 2020 Completed
Mechanical Work & Steel Structure
698 Bojonegoro Jambaran Tiung Biru Project Mech Pkg 1&3 and SS4 PT. Pertamina EP Cepu PT. Rekayasa Industri ( Persero) Maret 2020 - September 2022 On Going
Work
699 Mechanical Work Balikpapan Installation of New BPP-II & HCC Flare PT. Pertamina RU V Balikpapan KSO Adhi - Rekind April - July 2020 Completed
19 of 21
700 Heavy Lifting Bontang REPLACEMENT R-0502 & E-0208 Pabrik 1A PT. Pupuk Kaltim Direct By GTA June - July 2021 Completed

701 Piping Work Dumai Retubing Radiant & Convection 140-H-1ABCD PT. Pertamina RU II Dumai Direct By GTA Oct-Des 2020 Completed
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE
Penyediaan, Pemasangan dan Pembongkaran Scaffolding
702 Scaffolding Dumai PT. Pertamina RU II Dumai Direct By GTA Oct-Des 2020 Completed
kebutuhan tambahan Turn Arround 2020
703 Heavy Lifitng Merak Cakra Donya Project BPPI Direct By GTA Nov 2020 - Jan 2021 Completed

704 Mechanical Work Merak Oxidation Dryer Replacement Project BPPI Direct By GTA Nov 2020 - Jan 2021 Completed

705 Mechanical Work Balongan Stop Unit NPU 2021 RU VI Balongan PT. Pertamina RU VI Balongan Direct By GTA Mar-21 Completed

706 Heavy Lifitng Balongan RCC Balongan - Heavy Lifting PT. Pertamina RU VI Balongan ETI-YuhanTech-PBAS Dec 2021 - May 2022 Completed

707 Mechanical Work Balongan RCC Balongan - Regent & Reactor package PT. Pertamina RU VI Balongan ETI-YuhanTech-PBAS June 2021 - May 2022 Completed

708 Mechanical Work Balongan RCC Balongan - CO Boiler & Piping Package PT. Pertamina RU VI Balongan ETI-YuhanTech-PBAS Sept 2021 - May 2022 Completed

709 Mechanical Work Balongan RCC Balongan - BPS & EBJ Package PT. Pertamina RU VI Balongan ETI-YuhanTech-PBAS Sept 2021 - May 2022 Completed

710 Mechanical Work Jambi Merang Cleaning TEG System Pulai Gading JOB Pertamina Talisman Jambi Merang Direct By GTA Agustus 2019 Completed

711 Mechanical Work Jambi Merang Internal Amine Cleaning System & Condensate Stabilizer System PT. Pertamina Jambi Merang PT. Indopelita Aircraft Services Sept 2021 - Oct 2021 Completed

712 Mechanical Work Anyer Replace Existing and Install New Expander Barrel U32 PT. SRI Direct By GTA Sept 2021 -Sept 2021 Completed
Mechanical, Steel Structure, Piping
713 Balongan CDU Light Distillate Section Upgrading Project PT. Pertamina RU VI Balongan PT. Rekayasa Industri ( Persero) Sept 2021-Mar 2022 Completed
Work
714 Heavy Lift Bontang Replacement Gasket 103 C1/C2 PKT IKPT Oct 2021 - Nov 2021 Completed

715 Mechanical Work Balikpapan Jasa Mechanical Activity Area HCC TA RU V Tahun 2021 PT. Pertamina RU V Balikpapan Direct By GTA Aug 2022 - Sept 2022 Completed
Penggantian Piping System SS dan Alloy Steel di Area BPP I dan
716 Piping Work Balikpapan PT. Pertamina RU V Balikpapan Direct By GTA Aug 2022 - Sept 2022 Completed
BPP II
717 Mechanical Work Balongan Kontrak Utama Area RCC Untuk TA Major 2022 PT. Pertamina RU VI Balongan Direct By GTA Jan-Apr 2022 Completed

718 Piping Work Balongan Upgrade Line Sour Crude Pada Major TA 2022 PT. Pertamina RU VI Balongan Direct By GTA Jan-Apr 2022 Completed
Mechanical, Steel Structure, Piping Assembly Accessories Reactor Included Mechanical Works, Steel
719 Anyer PT. Nippon Sucubai Indonesia IKPT Dec 21 - Agustus 2022 Completed
Work Structure, Ducting, Piping Works, and Painting Works.
720 Heavy Lifitng Jakarta Removal Pedestrian Bridge Glodok SMCC - HK JO BAP Feb-22 Completed

721 Mechanical Work Gresik Manyar Smelter Project area CDE PT Freeport Indonesia Chiyoda International Indonesia Aug 2022 - Feb 2024 On Going
Dismantling & Re-Erection Radiant & Transition Section
722 Mechanical Work Bontang Pupuk Kaltim Direct By GTA Oct - Dec 2022 Completed
Reformer P-5
Installation RFCC and SAGF Flare ME-06 Package RDMP RU V
723 Mechanical Work Balikpapan PT. Pertamina RU V Balikpapan RDMP JO Oct - May 2023 On Going
Balikpapan
724 Mechanical Work Gresik Penggatian Reaktor DC 101 PT. Petrokimia Gresik Direct By GTA Nov - April 2023 On Going

725 Piping Work Anyer Repair Leak Pipe Jacketing PT. Indorama Petrochemicals Direct By GTA Jan.2023 Completed

726 Mechanical Work Balongan Perbaikan Flare Stack 61-SK-201 PT. Pertamina RU VI Balongan Direct By GTA Jan.2023 Completed
Luwuk -
727 Heavy Lifitng Lifting Activity of KRES 100-C 101-C 102-C PT. Panca Amara Utama Direct By GTA Feb-Mar 2023 On Going
Sulawesi Tengah
728 Mechanical Work Cilacap TA Pertamina Area FOC I LOC I PT. Pertamina RU IV Cilacap Direct By GTA Feb-Mar 2023 On Going

PT. Guna Teguh Abadi


Sincerely Yours,

20 of 21
Vlando Martin
Marketing Manager
PROJECT
NO CONTRACT DESCRIPTION LOCATION PROJECT NAME OWNER CLIENT REMARKS
SCHEDULE

21 of 21

You might also like