Ma
JOB SAFETY ANALYSIS WORKSHEET
da) hla lad gy
enigaat
as
i ‘aativity: Work locatio all gpm
geeks’ \ ‘Land survey , and ROW Clean the route ‘Tp14—TP4
sali hey 435A No.:3 Paha Qlas 3 gat By
Job Team Leader: Saad Rahima das $8 dsiae | Department: Al-Mithkal spat | date:19/2/2015 seu)
Person / Dept.
Sub-Tasks Potential Hazards Control Measures in charge
det eises Be sl sat dies | oa
sje
T._ Ensure workers attend the HSE taining,
L.Entry-exit of personnel and equipment in | Mines and UXO. 2. Ensure banksman are on-site IMRT
work area. Personal injury 3. The banks man go first to do survey.
4. Make sure all workers have full PPE,
2. A surveyor determines the pipeline path. 1, Follow the warning signs, iFany.
Selecting the benchmark points. 2, Works after check by banksman,
Determine the coordinates and levels | spines and UXO 3. Using detector man have radio detector to
with GPS and RTK. b eS make sure if any superficiality pipeline or
Determine the points needed to pour | Dae the underground pipes or cables. And mark the crossing points. aan
‘concrete and rebar. a 4. Using hand tools to dig.
Layout for the pipeline path 5. Survey reports must be prepared before
‘Marking the benchmarks. salve works.
1, Follow the waming signs, if any.
2. Use ZHONG NAN Company detection
Mie i O50) map asa reference
: 5 Zs 3. Driving in site with limited speed.
3. cee conte route ROW fo the new | Damage the underprounl pipes or | 3° Works ater check by banksman Aaah
Personal injury 5. Make sure all workers have full PPE,
6. Using detector man have radio detector to
F make sure if any superficiality pipeline or
cables.
Flag man must be in side with grader
(eal
Jang
Sead
19. 2~
20 am
RahAa