Download as pdf
Download as pdf
You are on page 1of 1
Ma JOB SAFETY ANALYSIS WORKSHEET da) hla lad gy enigaat as i ‘aativity: Work locatio all gpm geeks’ \ ‘Land survey , and ROW Clean the route ‘Tp14—TP4 sali hey 435A No.:3 Paha Qlas 3 gat By Job Team Leader: Saad Rahima das $8 dsiae | Department: Al-Mithkal spat | date:19/2/2015 seu) Person / Dept. Sub-Tasks Potential Hazards Control Measures in charge det eises Be sl sat dies | oa sje T._ Ensure workers attend the HSE taining, L.Entry-exit of personnel and equipment in | Mines and UXO. 2. Ensure banksman are on-site IMRT work area. Personal injury 3. The banks man go first to do survey. 4. Make sure all workers have full PPE, 2. A surveyor determines the pipeline path. 1, Follow the warning signs, iFany. Selecting the benchmark points. 2, Works after check by banksman, Determine the coordinates and levels | spines and UXO 3. Using detector man have radio detector to with GPS and RTK. b eS make sure if any superficiality pipeline or Determine the points needed to pour | Dae the underground pipes or cables. And mark the crossing points. aan ‘concrete and rebar. a 4. Using hand tools to dig. Layout for the pipeline path 5. Survey reports must be prepared before ‘Marking the benchmarks. salve works. 1, Follow the waming signs, if any. 2. Use ZHONG NAN Company detection Mie i O50) map asa reference : 5 Zs 3. Driving in site with limited speed. 3. cee conte route ROW fo the new | Damage the underprounl pipes or | 3° Works ater check by banksman Aaah Personal injury 5. Make sure all workers have full PPE, 6. Using detector man have radio detector to F make sure if any superficiality pipeline or cables. Flag man must be in side with grader (eal Jang Sead 19. 2~ 20 am RahAa

You might also like